Informe Técnico 1
Informe Técnico 1
Informe Técnico 1
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 3,9 Tons Load occurs at .................................................... Oct 1600
Total coil load .......................................................... 46,7 MBH OA DB / WB ...................................................... 82,4 / 71,7 °F
Sensible coil load ................................................... 35,7 MBH Entering DB / WB ............................................. 74,9 / 63,6 °F
Coil CFM at Oct 1600 ............................................ 2002 CFM Leaving DB / WB .............................................. 56,4 / 55,4 °F
Max block CFM ..................................................... 2002 CFM Coil ADP ..................................................................... 54,3 °F
Sum of peak zone CFM ........................................ 2002 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,765 Resulting RH ................................................................. 54 %
CFM/Ton ............................................................... 514,7 Design supply temp. ................................................... 54,0 °F
ft²/Ton ................................................................... 166,0 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 72,3 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise ...................................... 9,34 gpm
Actual max CFM .................................................... 2002 CFM Fan motor BHP ........................................................... 0,27 BHP
Standard CFM ....................................................... 1788 CFM Fan motor kW ............................................................. 0,22 kW
Actual max CFM/ft² ................................................. 3,10 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT7 Oficina 1 1 34,8 Dec 1600 2002 2,2 645,8 3,10
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23
4 0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 2,8 Tons Load occurs at ................................................... Aug 1500
Total coil load .......................................................... 33,9 MBH OA DB / WB ...................................................... 87,0 / 74,0 °F
Sensible coil load ................................................... 23,8 MBH Entering DB / WB ............................................. 76,3 / 64,9 °F
Coil CFM at Aug 1500 ........................................... 1243 CFM Leaving DB / WB .............................................. 56,4 / 55,4 °F
Max block CFM ..................................................... 1243 CFM Coil ADP ..................................................................... 54,2 °F
Sum of peak zone CFM ........................................ 1243 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,700 Resulting RH ................................................................. 55 %
CFM/Ton ............................................................... 439,6 Design supply temp. ................................................... 54,0 °F
ft²/Ton ................................................................... 190,6 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 63,0 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise ...................................... 6,79 gpm
Actual max CFM .................................................... 1243 CFM Fan motor BHP ........................................................... 0,17 BHP
Standard CFM ....................................................... 1110 CFM Fan motor kW ............................................................. 0,14 kW
Actual max CFM/ft² ................................................. 2,31 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT7 Oficina 2 1 21,6 Mar 1000 1243 1,1 539,0 2,31
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23 4
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 2,6 Tons Load occurs at ................................................... Jun 1600
Total coil load .......................................................... 30,8 MBH OA DB / WB ...................................................... 85,4 / 73,7 °F
Sensible coil load ................................................... 21,5 MBH Entering DB / WB ............................................. 75,8 / 64,6 °F
Coil CFM at Jun 1600 ............................................ 1125 CFM Leaving DB / WB .............................................. 55,9 / 54,9 °F
Max block CFM ...................................................... 1125 CFM Coil ADP ..................................................................... 53,7 °F
Sum of peak zone CFM ......................................... 1125 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,698 Resulting RH ................................................................. 54 %
CFM/Ton ............................................................... 437,9 Design supply temp. ................................................... 54,0 °F
ft²/Ton ................................................................... 146,7 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 81,8 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise ...................................... 6,17 gpm
Actual max CFM .................................................... 1125 CFM Fan motor BHP ........................................................... 0,15 BHP
Standard CFM ....................................................... 1005 CFM Fan motor kW ............................................................. 0,12 kW
Actual max CFM/ft² ................................................. 2,99 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT7 Oficina 3 1 19,5 Mar 1700 1125 0,9 377,0 2,99
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23 4
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 2,4 Tons Load occurs at ..................................................... Jul 1600
Total coil load .......................................................... 28,9 MBH OA DB / WB ...................................................... 86,4 / 73,8 °F
Sensible coil load ................................................... 19,9 MBH Entering DB / WB ............................................. 76,4 / 65,0 °F
Coil CFM at Jul 1600 ............................................. 1012 CFM Leaving DB / WB .............................................. 56,0 / 55,0 °F
Max block CFM ..................................................... 1012 CFM Coil ADP ..................................................................... 53,7 °F
Sum of peak zone CFM ........................................ 1012 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,688 Resulting RH ................................................................. 54 %
CFM/Ton ............................................................... 420,1 Design supply temp. ................................................... 54,0 °F
ft²/Ton ................................................................... 156,5 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 76,7 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise ...................................... 5,78 gpm
Actual max CFM .................................................... 1012 CFM Fan motor BHP ........................................................... 0,14 BHP
Standard CFM ......................................................... 903 CFM Fan motor kW ............................................................. 0,11 kW
Actual max CFM/ft² ................................................. 2,68 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT7 Oficina 4 1 17,6 Mar 1700 1012 0,7 377,0 2,68
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23 4
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 5,4 Tons Load occurs at ................................................... Jun 1600
Total coil load .......................................................... 64,5 MBH OA DB / WB ...................................................... 85,4 / 73,7 °F
Sensible coil load ................................................... 49,9 MBH Entering DB / WB ............................................. 75,2 / 63,3 °F
Coil CFM at Jun 1600 ........................................... 2646 CFM Leaving DB / WB .............................................. 55,6 / 54,5 °F
Max block CFM ..................................................... 2646 CFM Coil ADP ..................................................................... 53,4 °F
Sum of peak zone CFM ........................................ 2646 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,774 Resulting RH ................................................................. 51 %
CFM/Ton ............................................................... 492,3 Design supply temp. ................................................... 54,0 °F
ft²/Ton ................................................................... 138,3 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 86,8 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise .................................... 12,90 gpm
Actual max CFM .................................................... 2646 CFM Fan motor BHP ........................................................... 0,36 BHP
Standard CFM ....................................................... 2362 CFM Fan motor kW ............................................................. 0,29 kW
Actual max CFM/ft² ................................................. 3,56 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT7 Oficina 5 1 45,9 Jun 1600 2646 3,6 743,0 3,56
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
2 0,012
34 5
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23
4 0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 5,1 Tons Load occurs at ..................................................... Jul 1500
Total coil load .......................................................... 60,8 MBH OA DB / WB ...................................................... 87,0 / 74,0 °F
Sensible coil load ................................................... 43,1 MBH Entering DB / WB ............................................. 76,3 / 64,5 °F
Coil CFM at Jul 1500 ............................................. 2166 CFM Leaving DB / WB .............................................. 55,6 / 54,6 °F
Max block CFM ..................................................... 2166 CFM Coil ADP ..................................................................... 53,3 °F
Sum of peak zone CFM ........................................ 2166 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,709 Resulting RH ................................................................. 53 %
CFM/Ton ............................................................... 427,1 Design supply temp. ................................................... 54,0 °F
ft²/Ton ................................................................... 146,5 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 81,9 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise .................................... 12,18 gpm
Actual max CFM .................................................... 2166 CFM Fan motor BHP ........................................................... 0,30 BHP
Standard CFM ....................................................... 1934 CFM Fan motor kW ............................................................. 0,24 kW
Actual max CFM/ft² ................................................. 2,91 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT7 Oficina 6 1 37,6 Jun 1500 2166 3,1 743,0 2,91
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 234
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 2,3 Tons Load occurs at ..................................................... Jul 1500
Total coil load .......................................................... 27,9 MBH OA DB / WB ...................................................... 87,0 / 74,0 °F
Sensible coil load ................................................... 18,1 MBH Entering DB / WB ............................................. 77,5 / 66,5 °F
Coil CFM at Jul 1500 ............................................... 929 CFM Leaving DB / WB .............................................. 57,2 / 56,3 °F
Max block CFM ....................................................... 929 CFM Coil ADP ..................................................................... 55,0 °F
Sum of peak zone CFM .......................................... 929 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,650 Resulting RH ................................................................. 57 %
CFM/Ton ............................................................... 399,4 Design supply temp. ................................................... 55,0 °F
ft²/Ton ................................................................... 158,2 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 75,8 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise ...................................... 5,58 gpm
Actual max CFM ...................................................... 929 CFM Fan motor BHP ........................................................... 0,13 BHP
Standard CFM ......................................................... 829 CFM Fan motor kW ............................................................. 0,10 kW
Actual max CFM/ft² ................................................. 2,52 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT7 Oficina 7 1 15,2 Mar 1000 929 0,7 368,0 2,52
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
5 0,012
34
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23 4
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 4,1 Tons Load occurs at ................................................... Aug 1500
Total coil load .......................................................... 48,7 MBH OA DB / WB ...................................................... 87,0 / 74,0 °F
Sensible coil load ................................................... 35,2 MBH Entering DB / WB ............................................. 75,8 / 64,6 °F
Coil CFM at Aug 1500 ........................................... 1933 CFM Leaving DB / WB .............................................. 56,9 / 55,9 °F
Max block CFM ..................................................... 1933 CFM Coil ADP ..................................................................... 54,8 °F
Sum of peak zone CFM ........................................ 1933 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,724 Resulting RH ................................................................. 55 %
CFM/Ton ............................................................... 476,7 Design supply temp. ................................................... 54,0 °F
ft²/Ton ................................................................... 148,7 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 80,7 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise ...................................... 9,74 gpm
Actual max CFM .................................................... 1933 CFM Fan motor BHP ........................................................... 0,26 BHP
Standard CFM ....................................................... 1726 CFM Fan motor kW ............................................................. 0,21 kW
Actual max CFM/ft² ................................................. 3,21 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT7 Oficina 8 1 33,6 Mar 1000 1933 2,1 603,0 3,21
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23 4
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 1,1 Tons Load occurs at ................................................... Nov 1500
Total coil load .......................................................... 13,4 MBH OA DB / WB ...................................................... 80,0 / 71,0 °F
Sensible coil load ..................................................... 9,7 MBH Entering DB / WB ............................................. 74,7 / 63,9 °F
Coil CFM at Nov 1500 ............................................. 547 CFM Leaving DB / WB .............................................. 56,2 / 55,3 °F
Max block CFM ....................................................... 547 CFM Coil ADP ..................................................................... 54,2 °F
Sum of peak zone CFM .......................................... 547 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,726 Resulting RH ................................................................. 54 %
CFM/Ton ............................................................... 489,3 Design supply temp. ................................................... 54,0 °F
ft²/Ton ................................................................... 134,2 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 89,4 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise ...................................... 2,68 gpm
Actual max CFM ...................................................... 547 CFM Fan motor BHP ........................................................... 0,07 BHP
Standard CFM ......................................................... 488 CFM Fan motor kW ............................................................. 0,06 kW
Actual max CFM/ft² ................................................. 3,65 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT7 Oficina 9 1 9,5 Dec 1400 547 0,9 150,0 3,65
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23 4
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 3,6 Tons Load occurs at ................................................... Aug 1500
Total coil load .......................................................... 42,6 MBH OA DB / WB ...................................................... 87,0 / 74,0 °F
Sensible coil load ................................................... 27,5 MBH Entering DB / WB ............................................. 77,7 / 66,9 °F
Coil CFM at Aug 1500 ........................................... 1431 CFM Leaving DB / WB .............................................. 57,8 / 56,9 °F
Max block CFM ..................................................... 1431 CFM Coil ADP ..................................................................... 55,6 °F
Sum of peak zone CFM ........................................ 1431 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,644 Resulting RH ................................................................. 58 %
CFM/Ton ............................................................... 402,8 Design supply temp. ................................................... 57,0 °F
ft²/Ton ................................................................... 227,1 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 52,8 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise ...................................... 8,53 gpm
Actual max CFM .................................................... 1431 CFM Fan motor BHP ........................................................... 0,20 BHP
Standard CFM ....................................................... 1278 CFM Fan motor kW ............................................................. 0,16 kW
Actual max CFM/ft² ................................................. 1,77 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT7 Pasillo de Circulaci 1 20,7 Mar 1000 1431 0,3 807,0 1,77
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
5 0,012
34
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23 4
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )