INSPECTION & TEST PLAN FOR SURFACE PREPARATION AND PAINTING OF
PIPING AND STEEL STRUCTURES (Schedule 1Un, 2Un, & 9,)
CONTRACT: DATE: 18-02-2019
DOCUMENT NUMBER: 4070-RPFWN-5-25-0001 REV.2
GC18100400
Inspection Intervention
Inspection/ Verificatio Points
Activity Inspection Acceptance Criteria Verifying
No Reference Document Test n
Description Test Method Documents
Frequency Personnel S/C FRN TPL TPI QP
Check for
4070-RPFWN-0-05-0006 Establishing and maintaining Site Engr /
equipment &
Document QP-SPC-L-002 Sec 13.3 documented procedure for 1 test per QC
1.2 Inspection 4070-GF-007 H H n/a R W/R
Review 4070-RPFWN-5-05-0001 calibration all measuring and painting Painting
instrument
4070-RPFWN-5-19-0011 testing equipment system Inspector
calibration
Page 1 of 11
EPIC FOR PORT FIRE WATER NETWORK AT RLC
Document Title:
INSPECTION & TEST PLAN FOR SURFACE PREPARATION AND PAINTING OF
PIPING AND STEEL STRUCTURES (Schedule 1Un, 2Un, & 9,)
CONTRACT: DATE: 18-02-2019
DOCUMENT NUMBER: 4070-RPFWN-5-25-0001 REV.2
GC18100400
Inspection Intervention
Inspection/ Verificatio Points
Activity Inspection Acceptance Criteria Verifying
No Reference Document Test n
Description Test Method Documents
Frequency Personnel S/C FRN TPL TPI QP
Page 2 of 11
EPIC FOR PORT FIRE WATER NETWORK AT RLC
Document Title:
INSPECTION & TEST PLAN FOR SURFACE PREPARATION AND PAINTING OF
PIPING AND STEEL STRUCTURES (Schedule 1Un, 2Un, & 9,)
CONTRACT: DATE: 18-02-2019
DOCUMENT NUMBER: 4070-RPFWN-5-25-0001 REV.2
GC18100400
Inspection Intervention
Inspection/ Verificatio Points
Activity Inspection Acceptance Criteria Verifying
No Reference Document Test n
Description Test Method Documents
Frequency Personnel S/C FRN TPL TPI QP
Page 3 of 11
EPIC FOR PORT FIRE WATER NETWORK AT RLC
Document Title:
INSPECTION & TEST PLAN FOR SURFACE PREPARATION AND PAINTING OF
PIPING AND STEEL STRUCTURES (Schedule 1Un, 2Un, & 9,)
CONTRACT: DATE: 18-02-2019
DOCUMENT NUMBER: 4070-RPFWN-5-25-0001 REV.2
GC18100400
Inspection Intervention
Inspection/ Verificatio Points
Activity Inspection Acceptance Criteria Verifying
No Reference Document Test n
Description Test Method Documents
Frequency Personnel S/C FRN TPL TPI QP
Page 4 of 11
EPIC FOR PORT FIRE WATER NETWORK AT RLC
Document Title:
INSPECTION & TEST PLAN FOR SURFACE PREPARATION AND PAINTING OF
PIPING AND STEEL STRUCTURES (Schedule 1Un, 2Un, & 9,)
CONTRACT: DATE: 18-02-2019
DOCUMENT NUMBER: 4070-RPFWN-5-25-0001 REV.2
GC18100400
Inspection Intervention
Inspection/ Verificatio Points
Activity Inspection Acceptance Criteria Verifying
No Reference Document Test n
Description Test Method Documents
Frequency Personnel S/C FRN TPL TPI QP
Page 5 of 11
EPIC FOR PORT FIRE WATER NETWORK AT RLC
Document Title:
INSPECTION & TEST PLAN FOR SURFACE PREPARATION AND PAINTING OF
PIPING AND STEEL STRUCTURES (Schedule 1Un, 2Un, & 9,)
CONTRACT: DATE: 18-02-2019
DOCUMENT NUMBER: 4070-RPFWN-5-25-0001 REV.2
GC18100400
Inspection Intervention
Inspection/ Verificatio Points
Activity Inspection Acceptance Criteria Verifying
No Reference Document Test n
Description Test Method Documents
Frequency Personnel S/C FRN TPL TPI QP
Site Engr /
Abrading and QP-SPC-L-002 Part
No evidence of oil or grease QC
4.3 washing of Primer Visual 13.4.4 e Random 4070-MF-033 H W n/a n/a R
contamination Painting
Coat Application. 4070-RPFWN-5-19-0011
Inspector
First Intermediate To ensure over coating interval
coat application- Condition of spray Equipment’s, Site Engr /
Visual / Use of QP-SPC-L-002 Part
MIO Pigmented Paint material/Paint Batch No. Strip QC
4.4 calibrated 11.1,13.4.4,13.4.5&13.5 100% 4070-MF-033 H H n/a R W/R
Epoxy-DFT 100 Coat film thickness Painting
Instrument 4070-RPFWN-5-19-0011
µm (Total DFT 150 DFT Check Inspector
µm) Visual appearance
Site Engr /
Abrading and QP-SPC-L-002 Part
No evidence of oil or grease QC
4.6 washing of First Visual 13.4.4 e 100% 4070-MF-033 H W n/a n/a R
contamination Painting
Coat Application. 4070-RPFWN-5-19-0011
Inspector
To ensure over coating interval
Condition of spray Equipment’s,
Second Paint material/Paint Batch No. Strip
QP-SPC-L-002 Part
Intermediate coat Coat film thickness Site Engr /
Visual / Use of 11.1.3,13.4.4,13.4.5&13.5
application-MIO DFT Check QC
4.7 calibrated Approved color-coding 100% 4070-MF-033 H H n/a R W/R
Pigmented Epoxy- Visual appearance Painting
Instrument scheme
DFT 100 µm (Total Inspector
4070-RPFWN-5-19-0011
DFT 250 µm)
Page 6 of 11
EPIC FOR PORT FIRE WATER NETWORK AT RLC
Document Title:
INSPECTION & TEST PLAN FOR SURFACE PREPARATION AND PAINTING OF
PIPING AND STEEL STRUCTURES (Schedule 1Un, 2Un, & 9,)
CONTRACT: DATE: 18-02-2019
DOCUMENT NUMBER: 4070-RPFWN-5-25-0001 REV.2
GC18100400
Inspection Intervention
Inspection/ Verificatio Points
Activity Inspection Acceptance Criteria Verifying
No Reference Document Test n
Description Test Method Documents
Frequency Personnel S/C FRN TPL TPI QP
Page 7 of 11
EPIC FOR PORT FIRE WATER NETWORK AT RLC
Document Title:
INSPECTION & TEST PLAN FOR SURFACE PREPARATION AND PAINTING OF
PIPING AND STEEL STRUCTURES (Schedule 1Un, 2Un, & 9,)
CONTRACT: DATE: 18-02-2019
DOCUMENT NUMBER: 4070-RPFWN-5-25-0001 REV.2
GC18100400
Inspection Intervention
Inspection/ Verificatio Points
Activity Inspection Acceptance Criteria Verifying
No Reference Document Test n
Description Test Method Documents
Frequency Personnel S/C FRN TPL TPI QP
Document Title:
INSPECTION & TEST PLAN FOR SURFACE PREPARATION AND PAINTING OF
PIPING AND STEEL STRUCTURES (Schedule 1Un, 2Un, & 9,)
CONTRACT: DATE: 18-02-2019
DOCUMENT NUMBER: 4070-RPFWN-5-25-0001 REV.2
GC18100400
Inspection Intervention
Inspection/ Verificatio Points
Activity Inspection Acceptance Criteria Verifying
No Reference Document Test n
Description Test Method Documents
Frequency Personnel S/C FRN TPL TPI QP
Page 9 of 11
EPIC FOR PORT FIRE WATER NETWORK AT RLC
Document Title:
INSPECTION & TEST PLAN FOR SURFACE PREPARATION AND PAINTING OF
PIPING AND STEEL STRUCTURES (Schedule 1Un, 2Un, & 9,)
CONTRACT: DATE: 18-02-2019
DOCUMENT NUMBER: 4070-RPFWN-5-25-0001 REV.2
GC18100400
Inspection Intervention
Inspection/ Verificatio Points
Activity Inspection Acceptance Criteria Verifying
No Reference Document Test n
Description Test Method Documents
Frequency Personnel S/C FRN TPL TPI QP
Page 10 of 11
EPIC FOR PORT FIRE WATER NETWORK AT RLC
Document Title:
INSPECTION & TEST PLAN FOR SURFACE PREPARATION AND PAINTING OF
PIPING AND STEEL STRUCTURES (Schedule 1Un, 2Un, & 9,)
CONTRACT: DATE: 18-02-2019
DOCUMENT NUMBER: 4070-RPFWN-5-25-0001 REV.2
GC18100400
Inspection Intervention
Inspection/ Verificatio Points
Activity Inspection Acceptance Criteria Verifying
No Reference Document Test n
Description Test Method Documents
Frequency Personnel S/C FRN TPL TPI QP
The Finished
colors of the
coating that are to
be applicable to
the various items
Site Engr /
of equipment’s and Visual / Use of QP-SPC-L-002 Table 6 to
As per Approved color- QC
8.1 facilities- calibrated 9 and appendix D 100% 4070-MF-033 H H n/a W W/R
coding scheme Painting
inspection of color Instrument -BS 1710
Inspector
Band, Process
Label, Flow
Direction Valve
Body Color Coding
& Valve manholes
9.0 DOCUMENTATION
QP-SPC-L-002 - QP
Specification For Painting
Preparation of
& Wrapping Of Metal Site Engr /
Painting Reports &
Surfaces As per to relevant project QC
9.1 Completion of Pipe Visual / Review 100% 4070-MF-033 H H/R n/a R R
4012-MGEN-5-05-0002 - specification. Painting
Book.
QCP-Surface Preparation Inspector
Final Acceptance
And Painting Of Piping
And Steel Structures
JK BM BT