Professional Documents
Culture Documents
Case-4. Lfa Report
Case-4. Lfa Report
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Transformer Impedance: Yes Individual
Cable Length: No
Apply Individual
Temperature Correction Adjustments /Global Degree C
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Total Number of Buses: 45 1.063 0.536 0.349 0.106 0.000 0.000 0.000 0.000
0.000 0.000
Project: DUQM BUNKER TERMINAL PROJECT ETAP Page: 5
Location: OMAN 16.0.0C Date: 08-01-2020
Contract: TOWELL ENGINEERING CO. SN: PETRO6
Engineer: Revision: Base
Study Case: LF
Filename: DQUM BUNKER TERMINAL Config.: CASE-4
Line/Cable Length
Line/Cable Length
10-TX-01 3-Phase 2.000 11.000 0.433 6.25 6.00 0 0 10.0 0 0 6.8750 Dyn 0.000
10-TX-02 3-Phase 2.000 11.000 0.433 6.25 6.00 0 0 10.0 0 0 6.8750 Dyn 0.000
Branch Connections
10-DB-04A 0.415 99.062 -1.7 0 0 0.011 0.007 BUS-A -0.011 -0.007 17.9 85.0
10-DB-04B 0.415 100.561 -1.1 0 0 0.001 0.001 BUS-B -0.001 -0.001 1.8 85.0
10-DB-05A 0.415 99.038 -1.6 0 0 0.013 0.008 BUS-A -0.013 -0.008 21.1 85.0
10-DB-05B 0.415 100.559 -1.1 0 0 0.001 0.001 BUS-B -0.001 -0.001 2.1 85.0
10-DB-06-B 0.415 100.535 -1.1 0 0 0.014 0.008 BUS-B -0.014 -0.008 22.0 85.0
10-DB-06A 0.415 98.868 -1.7 0 0 0.135 0.083 BUS-A -0.135 -0.083 222.7 85.0
10-DB-07A 0.415 98.147 -1.8 0 0 0.025 0.015 BUS-A -0.025 -0.015 41.4 85.0
10-DB-07B 0.415 100.473 -1.1 0 0 0.003 0.002 BUS-B -0.003 -0.002 4.1 85.0
10-DB-08A 0.415 97.999 -1.8 0 0 0.043 0.027 BUS-A -0.043 -0.027 71.8 85.0
10-DB-08B 0.415 100.397 -1.1 0 0 0.004 0.003 BUS-B -0.004 -0.003 7.1 85.0
10-DB-09A 0.415 98.832 -1.7 0 0 0.149 0.093 BUS-A -0.149 -0.093 247.3 85.0
10-DB-09B 0.415 100.539 -1.1 0 0 0.015 0.009 BUS-B -0.015 -0.009 24.5 85.0
10-DB-10A 0.415 99.165 -1.7 0 0 0.017 0.000 BUS-A -0.017 0.000 23.5 100.0
10-DB-10B 0.415 100.300 -1.2 0 0 0.171 0.000 BUS-B -0.171 0.000 237.2 100.0
10-UPS-01.B1 0.415 100.536 -1.1 0 0 0.003 0.002 BUS-B -0.003 -0.002 5.6 80.0
10-UPS-01A. 0.415 98.808 -1.6 0 0 0.031 0.023 BUS-A -0.031 -0.023 55.0 80.0
10-UPS-01B 0.415 100.536 -1.1 0 0 0.003 0.002 BUS-B -0.003 -0.002 5.6 80.0
10-UPS-02-B 0.415 100.569 -1.1 0 0 0 0 BUS-B 0.000 0.000 0.8 80.0
10-UPS-02A.. 0.415 99.137 -1.7 0 0 0.005 0.003 BUS-A -0.005 -0.003 7.9 80.0
AG-2001-A 0.415 97.237 -1.3 0 0 0.033 0.016 BUS-A -0.033 -0.016 52.9 89.9
AG-2002-A1 0.415 97.237 -1.3 0 0 0.033 0.016 BUS-A -0.033 -0.016 52.9 89.9
BUS-A 0.415 99.193 -1.7 0 0 0.035 0.018 MGO BUS-1 0.096 0.041 146.3 92.1
BUS-B 0.415 100.575 -1.1 0 0 0.035 0.018 MGO BUS-2 0.111 0.049 168.1 91.6
TRK LD-2 0.002 0.001 3.0 88.3
* Bus1 11.000 95.000 0.0 0.880 0.486 0 0 Bus2 0.880 0.486 55.6 87.6
Bus2 11.000 94.898 0.0 0 0 0 0 Bus1 -0.880 -0.500 56.0 86.9
DIESEL BUS-1 0.415 98.030 -1.4 0 0 0.004 0.002 BUS-A -0.004 -0.002 7.0 87.5
DIESEL- 2 0.415 100.196 -1.0 0 0 0.001 0.001 BUS-B -0.001 -0.001 2.3 87.5
IFO BUS-1 0.415 98.175 -1.8 0 0 0.172 0.075 BUS-A -0.172 -0.075 266.4 91.7
IFO BUS-2 0.415 99.579 -1.2 0 0 0.172 0.075 BUS-B -0.172 -0.075 262.7 91.7
JKY BUS-1 0.415 95.904 -0.9 0 0 0.028 0.014 BUS-A -0.028 -0.014 45.5 89.1
Project: DUQM BUNKER TERMINAL PROJECT ETAP Page: 12
Location: OMAN 16.0.0C Date: 08-01-2020
Contract: TOWELL ENGINEERING CO. SN: PETRO6
Engineer: Revision: Base
Study Case: LF
Filename: DQUM BUNKER TERMINAL Config.: CASE-4
JKY BUS-2 0.415 98.875 -1.6 0 0 0.003 0.001 BUS-A -0.003 -0.001 4.4 89.1
MGO BUS-1 0.415 97.994 -1.6 0 0 0.095 0.040 BUS-A -0.095 -0.040 146.3 92.1
MGO BUS-2 0.415 99.199 -1.0 0 0 0.110 0.048 BUS-B -0.110 -0.048 168.1 91.5
SLOP BUS 0.415 99.000 -1.6 0 0 0.002 0.001 BUS-A -0.002 -0.001 3.6 85.8
TR LD BUS-1 0.415 98.220 -1.4 0 0 0.006 0.003 BUS-A -0.006 -0.003 9.2 88.2
TRK LD-2 0.415 100.257 -1.0 0 0 0.002 0.001 BUS-B -0.002 -0.001 3.0 88.2
WTP BUS-1 0.415 98.235 -1.5 0 0 0.022 0.014 BUS-A -0.022 -0.014 37.3 85.0
WTP-2. 0.415 100.259 -1.0 0 0 0.008 0.005 BUS-B -0.008 -0.005 12.3 85.0
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: DUQM BUNKER TERMINAL PROJECT ETAP Page: 13
Location: OMAN 16.0.0C Date: 08-01-2020
Contract: TOWELL ENGINEERING CO. SN: PETRO6
Engineer: Revision: Base
Study Case: LF
Filename: DQUM BUNKER TERMINAL Config.: CASE-4
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
Project: DUQM BUNKER TERMINAL PROJECT ETAP Page: 15
Location: OMAN 16.0.0C Date: 08-01-2020
Contract: TOWELL ENGINEERING CO. SN: PETRO6
Engineer: Revision: Base
Study Case: LF
Filename: DQUM BUNKER TERMINAL Config.: CASE-4
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
(Amp) Amp (MVA)
ID Type % MVA % MVA %
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
10-ELP-0014 -0.011 -0.007 0.011 0.007 0.0 0.0 99.1 99.2 0.13
10-ELP-0031 -0.001 -0.001 0.001 0.001 0.0 0.0 100.6 100.6 0.01
10-ELP-0015 -0.013 -0.008 0.013 0.008 0.0 0.0 99.0 99.2 0.15
10-ELP-0032 -0.001 -0.001 0.001 0.001 0.0 0.0 100.6 100.6 0.02
10-ELP-0033 -0.014 -0.008 0.014 0.008 0.0 0.0 100.5 100.6 0.04
10-ELP-0016 -0.135 -0.083 0.135 0.084 0.4 0.3 98.9 99.2 0.33
10-ELP-0017 -0.025 -0.015 0.025 0.015 0.2 0.1 98.1 99.2 1.05
10-ELP-0034 -0.003 -0.002 0.003 0.001 0.0 -0.1 100.5 100.6 0.10
10-ELP-0018 -0.043 -0.027 0.043 0.027 0.5 0.3 98.0 99.2 1.19
10-ELP-0035 -0.004 -0.003 0.004 0.003 0.0 -0.1 100.4 100.6 0.18
10-ELP-0019 -0.149 -0.093 0.150 0.093 0.5 0.4 98.8 99.2 0.36
10-ELP-0036 -0.015 -0.009 0.015 0.009 0.0 0.0 100.5 100.6 0.04
10-ELP-0020 -0.017 0.000 0.017 0.000 0.0 0.0 99.2 99.2 0.03
10-ELP-0037 -0.171 0.000 0.171 0.000 0.5 0.4 100.3 100.6 0.28
10-ELP-0003 0.000 0.000 0.000 0.000 0.0 0.0 100.0 100.0 0.00
10-ELP-0012 -0.003 -0.002 0.003 0.002 0.0 0.0 99.2 99.2 0.04
10-ELP-0029 -0.003 -0.002 0.003 0.002 0.0 0.0 100.5 100.6 0.04
10-ELP-0011 -0.031 -0.023 0.031 0.023 0.2 0.0 98.8 99.2 0.38
10-ELP-0028 -0.003 -0.002 0.003 0.002 0.0 0.0 100.5 100.6 0.04
10-ELP-0030 0.000 0.000 0.000 0.000 0.0 0.0 100.6 100.6 0.01
10-ELP-0013 -0.005 -0.003 0.005 0.003 0.0 0.0 99.1 99.2 0.06
10-ELP-0021 -0.033 -0.016 0.034 0.016 0.8 0.1 97.2 99.2 1.96
10-ELP-0022 -0.033 -0.016 0.034 0.016 0.8 0.1 97.2 99.2 1.96
10-ELP-0004 0.096 0.041 -0.095 -0.040 1.2 0.4 99.2 98.0 1.20
10-ELP-0005 0.006 0.003 -0.006 -0.003 0.1 0.0 99.2 98.2 0.97
10-ELP-0006 0.174 0.076 -0.172 -0.075 1.6 1.2 99.2 98.2 1.02
10-ELP-0007 0.002 0.001 -0.002 -0.001 0.0 0.0 99.2 99.0 0.19
10-ELP-0008 0.004 0.002 -0.004 -0.002 0.1 0.0 99.2 98.0 1.16
10-ELP-0009 0.029 0.014 -0.028 -0.014 1.2 0.1 99.2 95.9 3.29
10-ELP-0010 0.003 0.001 -0.003 -0.001 0.0 0.0 99.2 98.9 0.32
10-ELP-0023 0.023 0.014 -0.022 -0.014 0.3 0.1 99.2 98.2 0.96
10-TX-01 -0.873 -0.467 0.879 0.504 6.1 36.8 99.2 94.9 0.22
10-ELP-0024 0.111 0.049 -0.110 -0.048 1.6 0.5 100.6 99.2 1.38
10-ELP-0025 0.002 0.001 -0.002 -0.001 0.0 0.0 100.6 100.3 0.32
Project: DUQM BUNKER TERMINAL PROJECT ETAP Page: 17
Location: OMAN 16.0.0C Date: 08-01-2020
Contract: TOWELL ENGINEERING CO. SN: PETRO6
Engineer: Revision: Base
Study Case: LF
Filename: DQUM BUNKER TERMINAL Config.: CASE-4
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
10-ELP-0026 0.174 0.076 -0.172 -0.075 1.5 1.2 100.6 99.6 1.00
10-ELP-0027 0.001 0.001 -0.001 -0.001 0.0 0.0 100.6 100.2 0.38
10-ELP-0038 0.008 0.005 -0.008 -0.005 0.0 0.0 100.6 100.3 0.32
10-TX-02 -0.548 -0.179 0.550 0.191 2.0 12.1 100.6 94.9 1.53
10-EHP-0000 0.880 0.486 -0.880 -0.500 0.8 -14.3 95.0 94.9 0.10
10-EHP-0001 0.880 0.500 -0.879 -0.504 0.3 -3.7 94.9 94.9 0.04
10-EHP-0003 0.550 0.172 -0.550 -0.187 0.3 -14.8 95.0 94.9 0.05
10-EHP-0002 0.550 0.187 -0.550 -0.191 0.1 -3.8 94.9 94.9 0.02
21.1 17.1
Project: DUQM BUNKER TERMINAL PROJECT ETAP Page: 18
Location: OMAN 16.0.0C Date: 08-01-2020
Contract: TOWELL ENGINEERING CO. SN: PETRO6
Engineer: Revision: Base
Study Case: LF
Filename: DQUM BUNKER TERMINAL Config.: CASE-4
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 98.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0
Critical Report
Marginal Report
MW Mvar MVA % PF
Number of Iterations: 2