SIZING CALCULATION FOR MAIN DIESEL QP Doc.

No: FMBTY-2-12-0003
GENERATOR
TP Doc. No: 9460H-000-CN-1697-001
Revision: A
EPIC FOR FORWARD MOUNTED BASE Date: 29/05/14
(FMB)
Page 3 of 13

INDEX

1. INTRODUCTION ............................................................................................................ 4
Overview ...........................................................................................4
Project Location ................................................................................4
Project Scope ....................................................................................4
2. PURPOSE OF THIS DOCUMENT .................................................................................. 4
3. ABBREVIATIONS AND DEFINITIONS ........................................................................... 5
4. REFERENCE DOCUMENTS .......................................................................................... 6
Qatari Regulations ............................................................................6
Project Specific Specifications & Data-Sheets ...................................6
QP Corporate Standards ...................................................................6
Shell DEPs ........................................................................................7
QP Corporate Technical Standards ...................................................7
QP Recognised Codes of Practice and Standards ............................7
5. MAIN DIESEL GENERATOR SIZING CRITERIA .......................................................... 7
Case 1: In Normal Operating Conditions ..........................................7
Case 2: At Largest Motor Starting ....................................................8
6. NOTES AND ASSUMPTIONS ........................................................................................ 8
7. APPENDICES ................................................................................................................. 9
APPENDIX-1................................................................................................................. 10
MAIN DG SIZING CALCULATION ................................................................................ 10
APPENDIX-2................................................................................................................. 11
LOAD SUMMARY (WITHOUT DG AUXILIARY AND WITH LARGEST MOTOR) ......... 11
APPENDIX-3................................................................................................................. 12
LOAD SUMMARY (WITH DG AUXILIARY & WITH LARGEST MOTOR) ...................... 12
APPENDIX-4................................................................................................................. 13
LOAD SUMMARY (WITHOUT DG AUXILIARY AND WITHOUT LARGEST MOTOR) . 13
SIZING CALCULATION FOR MAIN DIESEL QP Doc. No: FMBTY-2-12-0003
GENERATOR
TP Doc. No: 9460H-000-CN-1697-001
Revision: A
EPIC FOR FORWARD MOUNTED BASE Date: 29/05/14
(FMB)
Page 4 of 13

1. INTRODUCTION

Overview
Qatar Petroleum (QP) is the national company of the State of Qatar entrusted with the
development of the hydrocarbon resources in Qatar.
With continuous development of Oil and Gas resources in Qatari waters, it has
become imperative for the State of Qatar to protect its critical infrastructures for
continuous effective deployment of national hydrocarbon reserves. Due to high
importance for enhancing the Qatar’s security control over its vital offshore oil & gas
assets, the National Security Shield (NSS) project was conceptualized for
implementation of a national security system for surveillance of all oil & gas producing
strategic structures in Qatar’s territorial waters.
The NSS system will provide a system for observation, detection, decision making
and intervention action to warrant the security of all vital offshore assets by installing
a number of Sensor Tower Platforms (STP) and a Forward Mounted Base (FMB)
platform.
The Engineering, Procurement, Fabrication, Installation and Commissioning of FMB
project will be carried out by Technip France, having a registered branch office in
Qatar under the current contract, while the same for STP will be carried out under
another contract by NPCC.

Project Location
The FMB facility will be located in the North Field of QP offshore operational areas.

Project Scope
The FACILITY broadly shall be comprised of the following:
 Living Quarter (LQ) platform for accommodating 120 nos. Personnel.
 Utility Platform with all utility packages and sensor tower M13.
 Bridge connecting the Utility & LQ platforms.
 Two Subsea Fiber Optic (FO) cables.
 Subsea composite (FO + power) cable.
 Permanent Moorings System.

2. PURPOSE OF THIS DOCUMENT


The purpose of this document is to provide the sizing calculation of the Main Diesel
Generator for the Forward Mounted Base (FMB) Platform for QP NSS Project.
This document shall be read in conjunction with other relevant philosophies
specifications and data sheets.
SIZING CALCULATION FOR MAIN DIESEL QP Doc. No: FMBTY-2-12-0003
GENERATOR
TP Doc. No: 9460H-000-CN-1697-001
Revision: A
EPIC FOR FORWARD MOUNTED BASE Date: 29/05/14
(FMB)
Page 5 of 13

3. ABBREVIATIONS AND DEFINITIONS

ABBREVIATIONS

AC : Alternating Current

DC : Direct Current

DEP : Design and Engineering Practice

DG : Diesel Generator

FMB : Forward Mounted Base

FO : Fiber Optic

HV : High Voltage

Hz : Hertz

IEC : International Electro-technical Commission

kV : Kilo Volts

kVA : Kilo Volt Ampere

kW : Kilo Watts

LQ : Living Quarters

LV : Low Voltage

NSS : National Security Shield

STP : Sensor Tower Platform

SWBD : Switchboard

VSD : Variable Speed Drive

DEFINITIONS
“COMPANY “ or “QP” Qatar Petroleum (QP)
“CONTRACTOR” or “PURCHASER” TECHNIP FRANCE, having a registered branch
office in Qatar

“VENDOR” or “SUPPLIER “or The organization responsible for


PACKAGE VENDOR” manufacturing, fabricating, testing and/or
supplying any of the package items to
PURCHASER or QP.
SIZING CALCULATION FOR MAIN DIESEL QP Doc. No: FMBTY-2-12-0003
GENERATOR
TP Doc. No: 9460H-000-CN-1697-001
Revision: A
EPIC FOR FORWARD MOUNTED BASE Date: 29/05/14
(FMB)
Page 6 of 13

4. REFERENCE DOCUMENTS
A listing of standards and codes considered primarily relevant are only provided below.
The listing is provided as a guide only and does not in any way relieve the Contractor of
the requirement to comply fully with any other appropriate standards. The standards
used shall be those ruling on the tender issue date. The following order of precedence is
applicable, in the descending order.
a) Qatar Statutory Regulations
b) Project Specific Specifications & Data-sheets
c) QP Corporate Standards
d) Shell DEPs
e) QP Corporate Technical Standards (for areas not covered by Shell DEPs)
f) QP recognized Codes of Practices and Standards
Any conflict, detected by the Contractor between the above codes will be notified to the
QP, together with the resolution as selected by Contractor according to the above order
of precedence.
Any instances of non-compliance must be notified by the Contractor to QP and QP
approval obtained prior to implementation of the work.

Qatari Regulations
N/A

Project Specific Specifications & Data-Sheets

S. No. Reference Document No. Description


1 FMBTY-2-29-0001 Electrical Design Basis - FMB
2 FMBTY-2-34-0001 Electrical Load List
3 Project Specification For Diesel
FMBTY-5-14-0011
Generator Sets

QP Corporate Standards
N/A
SIZING CALCULATION FOR MAIN DIESEL QP Doc. No: FMBTY-2-12-0003
GENERATOR
TP Doc. No: 9460H-000-CN-1697-001
Revision: A
EPIC FOR FORWARD MOUNTED BASE Date: 29/05/14
(FMB)
Page 7 of 13

Shell DEPs

S. No. Reference Document No. Description

1 DEP 33.65.11.31-Gen Synchronous AC Machines Amendments


/ Supplements to IEC 60034-1)

QP Corporate Technical Standards

S. No. Reference Document No. Description

1 ES.2.03.0001 Rev B Electrical Engineering Philosophy

2 ES.2.14.0002 Diesel Engine Driven Generators

QP Recognised Codes of Practice and Standards

S. No. Reference Document No. Description


1 IEC 60038 IEC Standard Voltage

5. MAIN DIESEL GENERATOR SIZING CRITERIA


The generator shall be sized on two cases (keeping a margin of 10% without considering
power factor improvement for worst condition).

a) Case 1: In normal operating condition

b) Case 2: At the largest motor starting condition. All motors below 132kW are
supposed to start by direct - on line methods. Motors greater than 132kW rating
are started by soft starter.

From the above two cases, the worst case shall be used for generator sizing.

Case 1: In Normal Operating Conditions


Sizing of the generator shall be determined using the following formula:

Total Peak Platform Load Excluding DG Auxiliaries = A + B + C

Where,
A = 100% Total Continuous Load Excluding DG Auxiliary Load
B = 30% Total Intermittent Load or 100% Single largest intermittent load,
whichever is larger
C = 10% Total standby load
SIZING CALCULATION FOR MAIN DIESEL QP Doc. No: FMBTY-2-12-0003
GENERATOR
TP Doc. No: 9460H-000-CN-1697-001
Revision: A
EPIC FOR FORWARD MOUNTED BASE Date: 29/05/14
(FMB)
Page 8 of 13

The active and reactive power demands shall be summed individually and future design
margin of 10% will be applied for generator sizing.

Total Peak Active Power Load (kW) = Total Peak Platform Load (Active) x 110%
Total Peak Reactive Power Load (kVAR) = Total Peak Platform Load (Reactive) x 110%

The Total Peak Load kVA on the generator shall be calculated from the above and used
to size the generator as follows:

Terminal Rating of Generator = Total Peak Load kVA including margin


(10% spare capacity has been included during in the calculation of the Total Peak Load
kVA.)

Case 2: At Largest Motor Starting


The following formula shall be used for apparent power considering voltage dip:

PG [kVA] = {(1- E) / E} x X’d x Qmax + Qot

Where,

E = Permissible voltage drop (= 20%)


X’d = Direct-axis transient reactance (= 0.1 ~ 0.3)
Qot = Other running loads
Qmax = Starting kVA of maximum motor load (= Pmax / (pf x Eff) x K)
Pmax = Capacity of maximum motor load
k = Max. starting current of motor per nominal rating ( = 6 ~ 8 for direct online
starting, = 1 for VSD starting)

The following formula shall be used for active power capacity:

Total Maximum Power Demand = Total Peak load kVA including margin and excluding
DG auxiliary load and largest motor load + Starting Power of Largest Motor at Peak
Torque Instant

The worst out of both cases shall be used for DG generator (alternator) sizing.

The above selected generator rating shall be verified separately by Motor Starting Study
that the DG rating will comply with voltage dip limitation during the starting of the largest
motor. The voltage dip shall not be greater than the prescribed limit at switchgear bus
bars (85%), other consumers (+10% or -20 % from rated equipment voltage) and motor
terminal (+10% or -20%) as per Electrical Design Basis (FMBTY-2-29-0001).

6. NOTES AND ASSUMPTIONS


1. The diesel generator set shall be as per QP standard ES.2.14.0002 (Diesel engine
driven generator)
2. Electrical loads considered for sizing the DG is as defined in the electrical load list
FMB Doc. No. FMBTY-2-34-0001.
SIZING CALCULATION FOR MAIN DIESEL QP Doc. No: FMBTY-2-12-0003
GENERATOR
TP Doc. No: 9460H-000-CN-1697-001
Revision: A
EPIC FOR FORWARD MOUNTED BASE Date: 29/05/14
(FMB)
Page 9 of 13

3. The indicated minimum required power at terminal of the generator must be verified
by manufacturer considering the following:
a) The behaviour of the excitation system to give the maximum reactive power
required during the worst starting condition.
b) The closest standard rating to the required performances together with the
standard of the associated diesel machine.
c) Selection of the diesel driver and power generator is manufacturer's
responsibility.
d) Regarding the voltage dip during the largest motor starting condition, DG
manufacturer shall confirm that the DG rating of the selected generator would
comply with voltage dip limitation at switchgear bus bars (85%), other consumers
(+10% or -20 % from rated equipment voltage) and motor terminal (+10% or -
20%) as per Electrical Design Basis (FMBTY-2-29-0001).
4. The sizing of generator shall be based on the following conditions:
a) Capacity under normal running conditions including 10% future spare capacity.
b) Capacity to limit voltage drop under transient conditions (i.e. largest motor
starting) within 20%
c) Capacity to withstand short time 10% overload.
Generator and largest starting motor data will be updated and modified to reflect
vendor data once available.
5. DG Auxiliaries load has not been considered for calculating the net terminal power.
The actual auxiliaries load shall be provided by the supplier during quotation and
considered during supplier confirmation of the DG sizing calculation.

7. APPENDICES

APPENDIX-1: Main DG Sizing Calculation (2 pages)

APPENDIX-2: Load Summary (Without DG Auxiliary and With Largest Motor)

APPENDIX-3: Load Summary (With DG Auxiliary & With Largest Motor)

APPENDIX-4: Load Summary (Without DG Auxiliary and Without Largest Motor)


SIZING CALCULATION FOR MAIN DIESEL QP Doc. No: FMBTY-2-12-0003
GENERATOR
TP Doc. No: 9460H-000-CN-1697-001
Revision: A
EPIC FOR FORWARD MOUNTED BASE
Date: 29/05/14
(FMB)
Page 10 of 13

APPENDIX-1

Main DG Sizing Calculation

(No of Pages: 2)
QP Doc. no. FMBTY-2-12-0003-A
TP Doc. no. 9460H-000-CN-1697-001
APPENDIX-1

SIZING CALCULATION FOR MAIN DIESEL GENERATOR


1

2 Case 1 : In Normal Operating Condition


3

4 System Load Details During Normal Operation Without DG Auxiliary Loads


5 kW kVAR kVA (Refer to Appendix-2)
6 Continuous load 1626.72 950.30 1883.96
7 Intermittent Load 1110.58 369.58 1170.46
8 Stand-by Load 1787.76 1086.03 2091.78
9

10 Diversity Factors considered as below:


11 Continuous load = 100%
12 Intermittent Load = 30% or 100% single largest intermittent load
13 Stand-by Load = 10%
14

15 Total Platform Peak Load, Without DG Auxiliary Load


16 kW kVAr kVA
17 Total Platform Peak Load - 2138.67 1428.49 2571.86
18 (100% Continuous + 30% Intermittent or Single Largest Intermittent Load+ 10% StandBy)
19

20 Total Platform Peak Load, Considering 10% Margin


21 Margin considered for Minimum Rating of Generator = 10%
22 kW kVAR kVA
23 Total Platform Peak Load with margin 2,352.54 1571.34 2829.05
24

26 Therefore,
27 kVA = 2829.05 (A)
Minimum Rating of Generator Considering Normal Operation
28
29
30 Case 2 : At the Largest Motor Starting Condition
31

32 2(a) Apparent Power Rating of Diesel Generator Set Considering Voltage Dip At Largest Motor Starting
33

34 Details of Largest Motor Load (LV Fire Water Pump in 400V SWBD):
35 Capacity of Maximum Motor Load Pmax = 204.4
36 Power Factor of Largest Motor Load Cos = 0.82 (Refer to Appendix-3)
FOR BINDING

37 Largest Motor Load in kVA kVA = 249.26


|

38 Maximum Starting Current of Motor per nominal rating k = 3.5 (As LV Fire Water Pump is started with SOFT STARTER)

39 Efficiency of Largest Motor Load  = 0.91 (Refer to Appendix-3)


40 Starting kVA of Largest Motor Load Qmax = 958.70
41 Qmax= [( Pmax/ (Cos  x  ) x k]
Permissible voltage drop at motor terminals during motor E = 20%
42
starting

43

44 Sizing as per Largest Motor Starting Condition:


45 Direct-axis transient reactance of Generator X'd = 0.185 (As per available vendor data)
46 Other Running loads (kVA) Qot = 2412.91 (Refer to Appendix-4)
47 (Total Platform Peak Load Excluding Largest Motor Load)
48

49 Other Running loads (kVA) Qot = 2654.2


50 (Total Platform Peak Load with 10% future margin & Excluding Largest Motor Load)
51

Apparent power required from generator (kVA) to ensure


52 PG(kVA) = 3363.6
Voltage drop at largest motor terminals is within limits
PG (kVA) = {(1-E)/E} x X'd x Qmax + Qot
53

54

55 Therefore,
56 Minimum Rating of Generator Considering Voltage Drop kVA = 3363.6 (B)
57

58
59

60

61

CONTRACTOR CONTRACT NO. GC1211200

CONTRACTOR DOC. No
Filename: FMBTY-2-12-0003-A.xls

9460H-000-CN-1697-001
TITLE
A APPROVED FOR CONSTRUCTION 29/04/14 SVA YG RS
OFFSHORE NATIONAL SECURITY SHIELD
2 ISSUED FOR APPROVAL 8/4/2014 SVA YG RS
FORWARD MOUNTED BASE (FMB)
1 RE-ISSUED FOR COMMENTS 5/2/2014 SVA YG RS
SIZING CALCULATION FOR MAIN DIESEL GENERATOR
0 ISSUED FOR COMMENTS 05/11/2013 SVA YG RS/JS ORIG. DOC. SIZE: A4 THIS IS A DATABASE PRINTOUT AND MUST NOT BE ALTERED MANUALLY REV.

REV. DESCRIPTION DATE DWN CHKD APP'D APP'D Doc. No. FMBTY-2-12-0003 Sht. 1 of 2 A
QP Doc. no. FMBTY-2-12-0003-A
TP Doc. no. 9460H-000-CN-1697-001
APPENDIX-1
SIZING CALCULATION FOR MAIN DIESEL GENERATOR
1

3 2(b) Generator Maximum Active Power Capacity At Largest Motor Starting


4
5

6 Largest Motor Load (LV Fire Water Pump in 400V SWBD) kW = 204.40
7

Starting Power of the Largest Motor at Peak Torque Instant,


8 kW = 204.40
kWpt (Approx. ~ 100 % of Motor Rating)
9

10 Total Platform Peak Load kW = 2118.23 (Refer to Appendix-4)


11 (Total Platform Peak Load Excluding Largest Motor Load)
12

13 Total Platform Peak Load kW = 2330.05


14 (Total Platform Peak Load with 10% future margin & Excluding Largest Motor Load)
15

Total Platform Peak Load + Total Starting Power of the Largest Motor at Peak
16 Total Maximum Power Demand kW =
Torque Instant
17 = 2534.45
18

19

20

21 Total Power to be Supplied from Generator kVA = 3168.1 (using P.F = 0.8)
22

23 Therefore,
Power Rating of Generator Considering Active Power
24
Capacity kVA = 3168.1 (C)
25

26 Conclusion
27
28 Therefore, the minimum DG size will be selected based on the highest of the values obtained in (A), (B) and (C)
29

30 Minimum generator size as calculated kVA = 3363.6


31

Considering 10% overload capability of the generator, minimum


32 kVA = 3057.9 Refer note-1
FOR BINDING

generator size required


33
|

34 Selected Generator Terminal Power kVA = 3000


35

36

37 Note:
38 1 The minimum required generator size is based on the Case 2(a), which is voltage drop at largest motor start. This calculation is a manual
39 calculation where the Generator AVR action is not considered. The suitability of main DG rating is justified in a more sophisticated way in
40 Power System Study Report (FMBTY-2-17-0003), taking into considerartion the maximum loading and motor starting cases.
41
Hence, the selected rating of 3000kVA is suitable.
42

43

44

45

46

47

48

49

50

51
52

53

54

55

56

57

58

59

60

CONTRACTOR CONTRACT NO. GC1211200


Filename: FMBTY-2-12-0003-A.xls

CONTRACTOR DOC. No

9460H-000-CN-1697-001
TITLE
A APPROVED FOR CONSTRUCTION 29/04/14 SVA YG RS
OFFSHORE NATIONAL SECURITY SHIELD
2 ISSUED FOR APPROVAL 8/4/2014 SVA YG RS
FORWARD MOUNTED BASE (FMB)
1 RE-ISSUED FOR COMMENTS 5/2/2014 SVA YG RS
SIZING CALCULATION FOR MAIN DIESEL GENERATOR
0 ISSUED FOR COMMENTS 05/11/2013 SVA YG RS/JS ORIG. DOC. SIZE: A4 THIS IS A DATABASE PRINTOUT AND MUST NOT BE ALTERED MANUALLY REV.

REV. DESCRIPTION DATE DWN CHKD APP'D APP'D Doc. No. FMBTY-2-12-0003 Sht. 2 of 2 A
SIZING CALCULATION FOR MAIN DIESEL QP Doc. No: FMBTY-2-12-0003
GENERATOR
TP Doc. No: 9460H-000-CN-1697-001
Revision: A
EPIC FOR FORWARD MOUNTED BASE
Date: 29/05/14
(FMB)
Page 11 of 13

APPENDIX-2

Load Summary
(Without DG Auxiliary and With Largest Motor)

(No of Pages: 4)
APPENDIX -2 SUMMARY - ELECTRICAL LOADS (WITHOUT DG AUXILIARY AND WITH LARGEST MOTOR)

CONSUMED POWER (11KV)


CONTINUOUS INTERMITTENT STANDBY

KW KVAR KVA KW KVAR KVA KW KVAR KVA


TOTAL LOAD ON 11KV SYSTEM 1626.72 950.30 1883.96 1110.58 369.58 1170.46 1787.76 1086.03 2091.78

REMARKS

100% x Continuous + 30% x Intermittent OR 100% Single Largest Intermittent Load


TOTAL PLANT RUNNING LOAD (TPRL) 1959.89 1061.18 2228.74
100% x Continuous + 30% x Intermittent OR 100% Single Largest Intermittent Load +
TOTAL PLANT PEAK LOAD (TPPL) 2138.67 1169.78 2437.68 10% x StandBy
FOR BINDING
|

NOTES:
CONTRACTOR CONTRACT NO. GC1211200

CONTRACTOR DOC. No
Filename: FMBTY-2-12-0003-A.xls

TITLE
OFFSHORE NATIONAL SECURITY SHIELD
FORWARD MOUNTED BASE (FMB)

ELECTRICAL LOAD SCHEDULE (WITHOUT DG AUXILIARY AND


WITH LARGEST MOTOR)
ORIG. DOC. SIZE: A3 THIS IS A DATABASE PRINTOUT AND MUST NOT BE ALTERED MANUALLY REV.

REV. DESCRIPTION DATE BY CHKD APP'D APP'D Doc. No. A

QP Doc. no. FMBTY-2-12-0003-A


TP Doc. no. 9460H-000-CN-1697-001 Page 1 of 4
APPENDIX-2
ELECTRICAL LOAD SCHEDULE
FORWARD MOUNTED BASE (FMB) PROJECT
LOADS FOR 611-30-MSB-01 - 11KV SWITCHGEAR
A
EQUIPMENT kW =
MOTOR / D CONSUMED LOAD kvar=kW.tg Φ
FEEDER LOAD EFFICIENCY POWER
ABSORBED RATING FACTOR at load FACTOR

BUS LOAD A factor C at load Continuous Intermittent Stand-by REMARKS


=
REV.

Equipment No. Description B factor C


A B C D E F G

A B kW kW in decimals in decimals cos Φ kW kVAR kW kVAR kW kVAR

611-30-MSB-01 - 11KV SWITCHGEAR

For load calculation, total load on 400V


611-30-TR-001-A Transformer feeder x 1626.72 950.30 1110.58 369.58 1787.76 1086.03 switchboard Bus A and Bus B is considered
on one transformer.

611-30-TR-001-B Transformer feeder x

TOTAL kW & kVAR (BUS BAR A + BUS BAR B) 1626.72 950.30 1110.58 369.58 1787.76 1086.03

TOTAL kVA 1883.96 1170.46 2091.78

Power Factor 0.86 0.95 0.85

CALCULATION SUMMARY kW kVAR kVA PF Feeder Amp.

Total Plant Running Load (TPRL) 1959.89 1061.18 2228.74 0.88 116.98

Total Plant Peak Load (TPPL) 2138.67 1169.78 2437.68 0.88 127.95

CONTRACTOR
CONTRACT NO. GC1211200

CONTRACTOR DOC. No

TITLE

OFFSHORE NATIONAL SECURITY SHIELD

FORWARD MOUNTED BASE - FMB


ELECTRICAL LOAD SCHEDULE (WITHOUT DG AUXILIARY AND WITH
LARGEST MOTOR)
ORIG. DOC. SIZE: A3 THIS IS A DATABASE PRINTOUT AND MUST NOT BE ALTERED MANUALLY REV.

REV. DESCRIPTION DATE BY CHKD APP'D APP'D Doc. No. A

QP Doc. no. FMBTY-2-12-0003-A


TP Doc. no. 9460H-000-CN-1697-001
Page 2 of 4
APPENDIX-2
ELECTRICAL LOAD SCHEDULE
FORWARD MOUNTED BASE (FMB) PROJECT
LOADS FOR 611-30-MSB-02-400V MAIN LV SWITCHBOARD

A
EQUIPMENT kW =
MOTOR / D CONSUMED LOAD kvar=kW.tg Φ
FEEDER LOAD EFFICIENCY POWER
ABSORBED RATING FACTOR at load FACTOR

BUS LOAD A factor C at load Continuous Intermittent Stand-by REMARKS


=
REV.

Equipment No. Description B factor C


A B C D E F G

A B kW kW in decimals in decimals cos Φ kW kVAR kW kVAR kW kVAR

611-30-MSB-02-400V MAIN LV SWITCHBOARD

2 611-21-P-01-A Raw Water Lift Pump-A x 134.0 200.0 0.67 0.91 0.82 147.25 102.78 With Soft Starter

2 611-21-P-01-C Raw Water Lift Pump-C x 134.0 200.0 0.67 0.91 0.82 147.25 102.78 With Soft Starter

A 611-24-A-01-A RO Desalination Unit & UV Steriliser Package x 37.4 45.0 0.83 0.90 0.87 42.99 24.36

A 610-31-A-01-A Water Treatment - Hot Water Calorifier Package x 76.0 120.0 0.63 1.00 0.90 40.00 19.37 120.00 58.12
Refer Emergency switchboard for list of feeders.
A 610-30-EDB-01 400V Main Emergency Switchboard Feeder - LQ x 302.38 179.95 225.47 17.52 494.13 295.52
Load referred from page 5
1 610-30-DB-03 230V Galley Distribution Board-02 x 31.5 35.0 0.90 0.98 0.95 32.14 10.56

0 610-24-A-03 Potable Water Cooler-A x 13.5 18.0 0.75 0.90 0.87 15.00 8.50

2 611-30-LB-01 Normal Lighting & Small Power DB - UP Roof Deck x 27.0 27.0 1.00 0.90 0.90 30.00 14.53

0 611-30-LB-02 Normal Lighting & Small Power DB - UP 3rd Deck x 27.0 27.0 1.00 0.90 0.90 30.00 14.53

2 611-30-LB-03 Normal Lighting & Small Power DB - UP 1st Deck & Cellar x 27.0 27.0 1.00 0.90 0.90 30.00 14.53

2 611-30-LB-04 Normal Lighting & Small Power DB - UP 3rd Deck x 27.0 27.0 1.00 0.90 0.90 30.00 14.53

1 611-43-L-01 Pedestal Crane - 6.5 T x 187.0 220.0 0.85 0.90 0.87 207.78 117.75 With Soft Starter

2 611-39-P-01 Open Drain Pump x 5.0 5.5 0.91 0.85 0.87 5.88 3.33

A 610-30-DB-01 Main Lighting and Small Power DB LQ x 0.00 0.00 187.66 92.72 149.90 87.75 Load referred from page 26

A 611-62-A-01 Helifuel transfer pump skid - UP x 5.0 7.5 0.67 0.80 0.80 6.25 4.69

A 611-62-A-02 Helifuel dispensing pump skid - UP x 8.0 11.0 0.73 0.85 0.80 9.41 7.06

2 611-56-A-01 Hypochlorite Package - UP x 27.3 35.0 0.78 0.90 0.87 30.33 17.19

0 611-43-L-04 Electric Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20

2 611-37-A-01A Instrument Air Compressor Package-A x 18.5 22.0 0.84 0.90 0.87 20.56 11.65

0 611-30-WSKT-01 Welding socket-1 - UP 1st Deck x 20.0 25.0 0.80 0.90 0.87 22.22 12.59 Note 7

0 611-30-WSKT-03 Welding socket-3 - UP 2nd Deck x 20.0 25.0 0.80 0.90 0.87 22.22 12.59 Note 7

0 611-30-WSKT-05 Welding socket-5 - UP 3rd Deck x 20.0 25.0 0.80 0.90 0.87 22.22 12.59 Note 7

0 611-30-WSKT-07 Welding socket-7 - UP Roof Deck x 20.0 25.0 0.80 0.90 0.87 22.22 12.59 Note 7

2 611-21-P-01-B Raw Water Lift Pump-B x 134.0 200.0 0.67 0.91 0.82 147.25 102.78 With Soft Starter

1 610-30-DB-04 400/230V Laundry Distribution Board x 88.0 110.0 0.80 0.98 0.95 89.80 29.51

1 610-30-DB-02 400/230V Galley Distribution Board-01 x 108.0 120.0 0.90 0.98 0.85 110.20 68.30

0 610-24-B-03 Potable Water Cooler-B x 13.5 18.0 0.75 0.90 0.87 15.00 8.50
Load referred from page 7
A 611-45-MCC/HCP-01 HVAC MCC - UP (Normal Power) x 633.06 366.43 208.62 0.00 377.3 217.63
(HVAC Vendor Scope of Supply)

1 610-43-L-02 Pedestal Crane - 6.5 T - LQ x 187.0 220.0 0.85 0.90 0.87 207.8 117.75 With Soft Starter

0 611-43-L-03 Electric Winch - Sensor Tower Top UP x 9.0 11.0 0.82 0.90 0.87 10.00 5.67
Load referred from page 25
A 611-30-DB-01 Auxiliary and Small Power DB- UP x 0.76 0.41 9.51 4.60 2.1 1.04
Note 6

QP Doc. no. FMBTY-2-12-0003-A


TP Doc. no. 9460H-000-CN-1697-001
APPENDIX-2 Page 3 of 4
ELECTRICAL LOAD SCHEDULE
FORWARD MOUNTED BASE (FMB) PROJECT
LOADS FOR 611-30-MSB-02-400V MAIN LV SWITCHBOARD

A
EQUIPMENT kW =
MOTOR / D CONSUMED LOAD kvar=kW.tg Φ
FEEDER LOAD EFFICIENCY POWER
ABSORBED RATING FACTOR at load FACTOR

BUS LOAD A factor C at load Continuous Intermittent Stand-by REMARKS


=
REV.

Equipment No. Description B factor C


A B C D E F G

A B kW kW in decimals in decimals cos Φ kW kVAR kW kVAR kW kVAR

0 611-30-WSKT-02 Welding socket-2 - UP 1st Deck x 20.0 25.0 0.80 0.90 0.85 22.22 13.77 Note 7

0 611-30-WSKT-04 Welding socket-4 - UP 2nd Deck x 20.0 25.0 0.80 0.90 0.85 22.22 13.77 Note 7

0 611-30-WSKT-06 Welding socket-6 - UP 3rd Deck x 20.0 25.0 0.80 0.90 0.85 22.22 13.77 Note 7

0 611-30-WSKT-08 Welding socket-8 - UP Roof Deck x 20.0 25.0 0.80 0.90 0.85 22.22 13.77 Note 7

0 611-43-L-05 Electric Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20

A 611-43-L-XX Electrical Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20 HOLD

A 611-43-L-XX Electrical Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20 HOLD

A 611-43-L-XX Electrical Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20 HOLD

A 611-43-L-XX Electrical Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20 HOLD

A 611-43-L-XX Electrical Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20 HOLD

2 610-33-P-01-A Fire water pump x 186.0 200.0 0.93 0.91 0.82 204.40 142.67 With Soft Starter

NOTES: TOTAL kW & kVAR (BUS BAR A + BUS BAR B) 1626.72 950.30 1110.58 369.58 1787.76 1086.03

TOTAL kVA 1883.96 1170.46 2091.78

Power Factor 0.86 0.95 0.85

CALCULATION SUMMARY kW kVAR kVA PF Feeder Amp.

Total Plant Running Load (TPRL) 1959.89 1061.18 2228.74 0.88 3217.00

Total Plant Peak Load (TPPL) 2138.67 1169.78 2437.68 0.88 3518.59

CONTRACTOR
CONTRACT NO. GC1211200

CONTRACTOR DOC. No

9460H-000-NM-1601-001

TITLE

OFFSHORE NATIONAL SECURITY SHIELD


FORWARD MOUNTED BASE - FMB
ELECTRICAL LOAD SCHEDULE
ORIG. DOC. SIZE: A3 THIS IS A DATABASE PRINTOUT AND MUST NOT BE ALTERED MANUALLY REV.

REV. DESCRIPTION DATE BY CHKD APP'D APP'D Doc. No. FMBTY-2-34-0001 A

QP Doc. no. FMBTY-2-12-0003-A


TP Doc. no. 9460H-000-CN-1697-001
APPENDIX-2 Page 4 of 4
SIZING CALCULATION FOR MAIN DIESEL QP Doc. No: FMBTY-2-12-0003
GENERATOR
TP Doc. No: 9460H-000-CN-1697-001
Revision: A
EPIC FOR FORWARD MOUNTED BASE
Date: 29/05/14
(FMB)
Page 12 of 13

APPENDIX-3

Load Summary
(With DG Auxiliary & With Largest Motor)

(No of Pages: 4)
APPENDIX -3 SUMMARY - ELECTRICAL LOADS (WITH DG AUXILLARY AND WITH LARGEST MOTOR)

CONSUMED POWER (11KV)


CONTINUOUS INTERMITTENT STANDBY

KW KVAR KVA KW KVAR KVA KW KVAR KVA


TOTAL LOAD ON 11KV SYSTEM 1626.72 950.30 1883.96 1110.58 369.58 1170.46 1876.00 1136.03 2193.16

REMARKS

100% x Continuous + 30% x Intermittent OR 100% Single Largest Intermittent Load


TOTAL PLANT RUNNING LOAD (TPRL) 1959.89 1061.18 2228.74
100% x Continuous + 30% x Intermittent OR 100% Single Largest Intermittent Load +
TOTAL PLANT PEAK LOAD (TPPL) 2147.49 1174.78 2447.82 10% x StandBy
FOR BINDING
|

NOTES:
CONTRACTOR CONTRACT NO. GC1211200

CONTRACTOR DOC. No
Filename: FMBTY-2-12-0003-A.xls

TITLE
OFFSHORE NATIONAL SECURITY SHIELD
FORWARD MOUNTED BASE (FMB)

ELECTRICAL LOAD SCHEDULE (WITH DG AUXILLARY AND WITH


LARGEST MOTOR)
ORIG. DOC. SIZE: A3 THIS IS A DATABASE PRINTOUT AND MUST NOT BE ALTERED MANUALLY REV.

REV. DESCRIPTION DATE BY CHKD APP'D APP'D Doc. No. A

QP Doc. no. FMBTY-2-12-0003-A


TP Doc. no. 9460H-000-CN-1697-001 Page 1 of 4
APPENDIX-3
ELECTRICAL LOAD SCHEDULE
FORWARD MOUNTED BASE (FMB) PROJECT
LOADS FOR 611-30-MSB-01 - 11KV SWITCHGEAR
A
EQUIPMENT kW =
MOTOR / D CONSUMED LOAD kvar=kW.tg Φ
FEEDER LOAD EFFICIENCY POWER
ABSORBED RATING FACTOR at load FACTOR

BUS LOAD A factor C at load Continuous Intermittent Stand-by REMARKS


=
REV.

Equipment No. Description B factor C


A B C D E F G

A B kW kW in decimals in decimals cos Φ kW kVAR kW kVAR kW kVAR

611-30-MSB-01 - 11KV SWITCHGEAR

For load calculation, total load on 400V


611-30-TR-001-A Transformer feeder x 1626.72 950.30 1110.58 369.58 1876.00 1136.03 switchboard Bus A and Bus B is considered
on one transformer.

611-30-TR-001-B Transformer feeder x

TOTAL kW & kVAR (BUS BAR A + BUS BAR B) 1626.72 950.30 1110.58 369.58 1876.00 1136.03

TOTAL kVA 1883.96 1170.46 2193.16

Power Factor 0.86 0.95 0.86

CALCULATION SUMMARY kW kVAR kVA PF Feeder Amp.

Total Plant Running Load (TPRL) 1959.89 1061.18 2228.74 0.88 116.98

Total Plant Peak Load (TPPL) 2147.49 1174.78 2447.82 0.88 128.48

CONTRACTOR
CONTRACT NO. GC1211200

CONTRACTOR DOC. No

TITLE

OFFSHORE NATIONAL SECURITY SHIELD

FORWARD MOUNTED BASE - FMB


ELECTRICAL LOAD SCHEDULE (WITH DG AUXILLARY AND WITH LARGEST
MOTOR)
ORIG. DOC. SIZE: A3 THIS IS A DATABASE PRINTOUT AND MUST NOT BE ALTERED MANUALLY REV.

REV. DESCRIPTION DATE BY CHKD APP'D APP'D Doc. No. A

QP Doc. no. FMBTY-2-12-0003-A


TP Doc. no. 9460H-000-CN-1697-001
Page 2 of 4
APPENDIX-3
ELECTRICAL LOAD SCHEDULE
FORWARD MOUNTED BASE (FMB) PROJECT
LOADS FOR 611-30-MSB-02-400V MAIN LV SWITCHBOARD

A
EQUIPMENT kW =
MOTOR / D CONSUMED LOAD kvar=kW.tg Φ
FEEDER LOAD EFFICIENCY POWER
ABSORBED RATING FACTOR at load FACTOR

BUS LOAD A factor C at load Continuous Intermittent Stand-by REMARKS


=
REV.

Equipment No. Description B factor C


A B C D E F G

A B kW kW in decimals in decimals cos Φ kW kVAR kW kVAR kW kVAR

611-30-MSB-02-400V MAIN LV SWITCHBOARD

2 611-21-P-01-A Raw Water Lift Pump-A x 134.0 200.0 0.67 0.91 0.82 147.25 102.78 With Soft Starter

2 611-21-P-01-C Raw Water Lift Pump-C x 134.0 200.0 0.67 0.91 0.82 147.25 102.78 With Soft Starter

A 611-24-A-01-A RO Desalination Unit & UV Steriliser Package x 37.4 45.0 0.83 0.90 0.87 42.99 24.36

A 610-31-A-01-A Water Treatment - Hot Water Calorifier Package x 76.0 120.0 0.63 1.00 0.90 40.00 19.37 120.00 58.12
Refer Emergency switchboard for list of feeders.
A 610-30-EDB-01 400V Main Emergency Switchboard Feeder - LQ x 302.38 179.95 225.47 17.52 582.37 345.52
Load referred from page 5
1 610-30-DB-03 230V Galley Distribution Board-02 x 31.5 35.0 0.90 0.98 0.95 32.14 10.56

0 610-24-A-03 Potable Water Cooler-A x 13.5 18.0 0.75 0.90 0.87 15.00 8.50

2 611-30-LB-01 Normal Lighting & Small Power DB - UP Roof Deck x 27.0 27.0 1.00 0.90 0.90 30.00 14.53

0 611-30-LB-02 Normal Lighting & Small Power DB - UP 3rd Deck x 27.0 27.0 1.00 0.90 0.90 30.00 14.53

2 611-30-LB-03 Normal Lighting & Small Power DB - UP 1st Deck & Cellar x 27.0 27.0 1.00 0.90 0.90 30.00 14.53

2 611-30-LB-04 Normal Lighting & Small Power DB - UP 3rd Deck x 27.0 27.0 1.00 0.90 0.90 30.00 14.53

1 611-43-L-01 Pedestal Crane - 6.5 T x 187.0 220.0 0.85 0.90 0.87 207.78 117.75 With Soft Starter

2 611-39-P-01 Open Drain Pump x 5.0 5.5 0.91 0.85 0.87 5.88 3.33

A 610-30-DB-01 Main Lighting and Small Power DB LQ x 0.00 0.00 187.66 92.72 149.90 87.75 Load referred from page 26

A 611-62-A-01 Helifuel transfer pump skid - UP x 5.0 7.5 0.67 0.80 0.80 6.25 4.69

A 611-62-A-02 Helifuel dispensing pump skid - UP x 8.0 11.0 0.73 0.85 0.80 9.41 7.06

2 611-56-A-01 Hypochlorite Package - UP x 27.3 35.0 0.78 0.90 0.87 30.33 17.19

0 611-43-L-04 Electric Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20

2 611-37-A-01A Instrument Air Compressor Package-A x 18.5 22.0 0.84 0.90 0.87 20.56 11.65

0 611-30-WSKT-01 Welding socket-1 - UP 1st Deck x 20.0 25.0 0.80 0.90 0.87 22.22 12.59 Note 7

0 611-30-WSKT-03 Welding socket-3 - UP 2nd Deck x 20.0 25.0 0.80 0.90 0.87 22.22 12.59 Note 7

0 611-30-WSKT-05 Welding socket-5 - UP 3rd Deck x 20.0 25.0 0.80 0.90 0.87 22.22 12.59 Note 7

0 611-30-WSKT-07 Welding socket-7 - UP Roof Deck x 20.0 25.0 0.80 0.90 0.87 22.22 12.59 Note 7

2 611-21-P-01-B Raw Water Lift Pump-B x 134.0 200.0 0.67 0.91 0.82 147.25 102.78 With Soft Starter

1 610-30-DB-04 400/230V Laundry Distribution Board x 88.0 110.0 0.80 0.98 0.95 89.80 29.51

1 610-30-DB-02 400/230V Galley Distribution Board-01 x 108.0 120.0 0.90 0.98 0.85 110.20 68.30

0 610-24-B-03 Potable Water Cooler-B x 13.5 18.0 0.75 0.90 0.87 15.00 8.50
Load referred from page 7
A 611-45-MCC/HCP-01 HVAC MCC - UP (Normal Power) x 633.06 366.43 208.62 0.00 377.3 217.63
(HVAC Vendor Scope of Supply)

1 610-43-L-02 Pedestal Crane - 6.5 T - LQ x 187.0 220.0 0.85 0.90 0.87 207.8 117.75 With Soft Starter

0 611-43-L-03 Electric Winch - Sensor Tower Top UP x 9.0 11.0 0.82 0.90 0.87 10.00 5.67
Load referred from page 25
A 611-30-DB-01 Auxiliary and Small Power DB- UP x 0.76 0.41 9.51 4.60 2.1 1.04
Note 6

QP Doc. no. FMBTY-2-12-0003-A


TP Doc. no. 9460H-000-CN-1697-001
APPENDIX-3 Page 3 of 4
ELECTRICAL LOAD SCHEDULE
FORWARD MOUNTED BASE (FMB) PROJECT
LOADS FOR 611-30-MSB-02-400V MAIN LV SWITCHBOARD

A
EQUIPMENT kW =
MOTOR / D CONSUMED LOAD kvar=kW.tg Φ
FEEDER LOAD EFFICIENCY POWER
ABSORBED RATING FACTOR at load FACTOR

BUS LOAD A factor C at load Continuous Intermittent Stand-by REMARKS


=
REV.

Equipment No. Description B factor C


A B C D E F G

A B kW kW in decimals in decimals cos Φ kW kVAR kW kVAR kW kVAR

0 611-30-WSKT-02 Welding socket-2 - UP 1st Deck x 20.0 25.0 0.80 0.90 0.85 22.22 13.77 Note 7

0 611-30-WSKT-04 Welding socket-4 - UP 2nd Deck x 20.0 25.0 0.80 0.90 0.85 22.22 13.77 Note 7

0 611-30-WSKT-06 Welding socket-6 - UP 3rd Deck x 20.0 25.0 0.80 0.90 0.85 22.22 13.77 Note 7

0 611-30-WSKT-08 Welding socket-8 - UP Roof Deck x 20.0 25.0 0.80 0.90 0.85 22.22 13.77 Note 7

0 611-43-L-05 Electric Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20

A 611-43-L-XX Electrical Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20 HOLD

A 611-43-L-XX Electrical Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20 HOLD

A 611-43-L-XX Electrical Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20 HOLD

A 611-43-L-XX Electrical Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20 HOLD

A 611-43-L-XX Electrical Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20 HOLD

2 610-33-P-01-A Fire water pump x 186.0 200.0 0.93 0.91 0.82 204.40 142.67 With Soft Starter

NOTES: TOTAL kW & kVAR (BUS BAR A + BUS BAR B) 1626.72 950.30 1110.58 369.58 1876.00 1136.03

TOTAL kVA 1883.96 1170.46 2193.16

Power Factor 0.86 0.95 0.86

CALCULATION SUMMARY kW kVAR kVA PF Feeder Amp.

Total Plant Running Load (TPRL) 1959.89 1061.18 2228.74 0.88 3217.00

Total Plant Peak Load (TPPL) 2147.49 1174.78 2447.82 0.88 3533.23

CONTRACTOR
CONTRACT NO. GC1211200

CONTRACTOR DOC. No

9460H-000-NM-1601-001

TITLE

OFFSHORE NATIONAL SECURITY SHIELD


FORWARD MOUNTED BASE - FMB
ELECTRICAL LOAD SCHEDULE
ORIG. DOC. SIZE: A3 THIS IS A DATABASE PRINTOUT AND MUST NOT BE ALTERED MANUALLY REV.

REV. DESCRIPTION DATE BY CHKD APP'D APP'D Doc. No. FMBTY-2-34-0001 A

QP Doc. no. FMBTY-2-12-0003-A


TP Doc. no. 9460H-000-CN-1697-001
APPENDIX-3 Page 4 of 4
SIZING CALCULATION FOR MAIN DIESEL QP Doc. No: FMBTY-2-12-0003
GENERATOR
TP Doc. No: 9460H-000-CN-1697-001
Revision: A
EPIC FOR FORWARD MOUNTED BASE
Date: 29/05/14
(FMB)
Page 13 of 13

APPENDIX-4

Load Summary
(Without DG Auxiliary and Without Largest Motor)

(No of Pages: 4)
APPENDIX -4 SUMMARY - ELECTRICAL LOADS (WITHOUT DG AUXILLARY AND WITHOUT LARGEST MOTOR)

CONSUMED POWER (11KV)


CONTINUOUS INTERMITTENT STANDBY

KW KVAR KVA KW KVAR KVA KW KVAR KVA


TOTAL LOAD ON 11KV SYSTEM 1626.72 950.30 1883.96 1110.58 369.58 1170.46 1583.37 943.36 1843.09

REMARKS

100% x Continuous + 30% x Intermittent OR 100% Single Largest Intermittent Load


TOTAL PLANT RUNNING LOAD (TPRL) 1959.89 1061.18 2228.74
100% x Continuous + 30% x Intermittent OR 100% Single Largest Intermittent Load +
TOTAL PLANT PEAK LOAD (TPPL) 2118.23 1155.51 2412.91 10% x StandBy
FOR BINDING
|

NOTES:
CONTRACTOR CONTRACT NO. GC1211200

CONTRACTOR DOC. No
Filename: FMBTY-2-12-0003-A.xls

TITLE
OFFSHORE NATIONAL SECURITY SHIELD
FORWARD MOUNTED BASE (FMB)

ELECTRICAL LOAD SCHEDULE (WITHOUT DG AUXILLARY AND


WITHOUT LARGEST MOTOR)
ORIG. DOC. SIZE: A3 THIS IS A DATABASE PRINTOUT AND MUST NOT BE ALTERED MANUALLY REV.

REV. DESCRIPTION DATE BY CHKD APP'D APP'D Doc. No. A

QP Doc. no. FMBTY-2-12-0003-A


TP Doc. no. 9460H-000-CN-1697-001
Page 1 of 4
APPENDIX-4
ELECTRICAL LOAD SCHEDULE
FORWARD MOUNTED BASE (FMB) PROJECT
LOADS FOR 611-30-MSB-01 - 11KV SWITCHGEAR
A
EQUIPMENT kW =
MOTOR / D CONSUMED LOAD kvar=kW.tg Φ
FEEDER LOAD EFFICIENCY POWER
ABSORBED RATING FACTOR at load FACTOR

BUS LOAD A factor C at load Continuous Intermittent Stand-by REMARKS


=
REV.

Equipment No. Description B factor C


A B C D E F G

A B kW kW in decimals in decimals cos Φ kW kVAR kW kVAR kW kVAR

611-30-MSB-01 - 11KV SWITCHGEAR

For load calculation, total load on 400V


611-30-TR-001-A Transformer feeder x 1626.72 950.30 1110.58 369.58 1583.37 943.36 switchboard Bus A and Bus B is considered
on one transformer.

611-30-TR-001-B Transformer feeder x

TOTAL kW & kVAR (BUS BAR A + BUS BAR B) 1626.72 950.30 1110.58 369.58 1583.37 943.36

TOTAL kVA 1883.96 1170.46 1843.09

Power Factor 0.86 0.95 0.86

CALCULATION SUMMARY kW kVAR kVA PF Feeder Amp.

Total Plant Running Load (TPRL) 1959.89 1061.18 2228.74 0.88 116.98

Total Plant Peak Load (TPPL) 2118.23 1155.51 2412.91 0.88 126.65

CONTRACTOR
CONTRACT NO. GC1211200

CONTRACTOR DOC. No

TITLE

OFFSHORE NATIONAL SECURITY SHIELD

FORWARD MOUNTED BASE - FMB


ELECTRICAL LOAD SCHEDULE (WITHOUT DG AUXILIARY AND WITH
LARGEST MOTOR)
ORIG. DOC. SIZE: A3 THIS IS A DATABASE PRINTOUT AND MUST NOT BE ALTERED MANUALLY REV.

REV. DESCRIPTION DATE BY CHKD APP'D APP'D Doc. No. A

QP Doc. no. FMBTY-2-12-0003-A


Page 2 of 4
TP Doc. no. 9460H-000-CN-1697-001
APPENDIX-4
ELECTRICAL LOAD SCHEDULE
FORWARD MOUNTED BASE (FMB) PROJECT
LOADS FOR 611-30-MSB-02-400V MAIN LV SWITCHBOARD

A
EQUIPMENT kW =
MOTOR / D CONSUMED LOAD kvar=kW.tg Φ
FEEDER LOAD EFFICIENCY POWER
ABSORBED RATING FACTOR at load FACTOR

BUS LOAD A factor C at load Continuous Intermittent Stand-by REMARKS


=
REV.

Equipment No. Description B factor C


A B C D E F G

A B kW kW in decimals in decimals cos Φ kW kVAR kW kVAR kW kVAR

611-30-MSB-02-400V MAIN LV SWITCHBOARD

2 611-21-P-01-A Raw Water Lift Pump-A x 134.0 200.0 0.67 0.91 0.82 147.25 102.78 With Soft Starter

2 611-21-P-01-C Raw Water Lift Pump-C x 134.0 200.0 0.67 0.91 0.82 147.25 102.78 With Soft Starter

A 611-24-A-01-A RO Desalination Unit & UV Steriliser Package x 37.4 45.0 0.83 0.90 0.87 42.99 24.36

A 610-31-A-01-A Water Treatment - Hot Water Calorifier Package x 76.0 120.0 0.63 1.00 0.90 40.00 19.37 120.00 58.12
Refer Emergency switchboard for list of feeders.
A 610-30-EDB-01 400V Main Emergency Switchboard Feeder - LQ x 302.38 179.95 225.47 17.52 494.13 295.52
Load referred from page 5
1 610-30-DB-03 230V Galley Distribution Board-02 x 31.5 35.0 0.90 0.98 0.95 32.14 10.56

0 610-24-A-03 Potable Water Cooler-A x 13.5 18.0 0.75 0.90 0.87 15.00 8.50

2 611-30-LB-01 Normal Lighting & Small Power DB - UP Roof Deck x 27.0 27.0 1.00 0.90 0.90 30.00 14.53

0 611-30-LB-02 Normal Lighting & Small Power DB - UP 3rd Deck x 27.0 27.0 1.00 0.90 0.90 30.00 14.53

2 611-30-LB-03 Normal Lighting & Small Power DB - UP 1st Deck & Cellar x 27.0 27.0 1.00 0.90 0.90 30.00 14.53

2 611-30-LB-04 Normal Lighting & Small Power DB - UP 3rd Deck x 27.0 27.0 1.00 0.90 0.90 30.00 14.53

1 611-43-L-01 Pedestal Crane - 6.5 T x 187.0 220.0 0.85 0.90 0.87 207.78 117.75 With Soft Starter

2 611-39-P-01 Open Drain Pump x 5.0 5.5 0.91 0.85 0.87 5.88 3.33

A 610-30-DB-01 Main Lighting and Small Power DB LQ x 0.00 0.00 187.66 92.72 149.90 87.75 Load referred from page 26

A 611-62-A-01 Helifuel transfer pump skid - UP x 5.0 7.5 0.67 0.80 0.80 6.25 4.69

A 611-62-A-02 Helifuel dispensing pump skid - UP x 8.0 11.0 0.73 0.85 0.80 9.41 7.06

2 611-56-A-01 Hypochlorite Package - UP x 27.3 35.0 0.78 0.90 0.87 30.33 17.19

0 611-43-L-04 Electric Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20

2 611-37-A-01A Instrument Air Compressor Package-A x 18.5 22.0 0.84 0.90 0.87 20.56 11.65

0 611-30-WSKT-01 Welding socket-1 - UP 1st Deck x 20.0 25.0 0.80 0.90 0.87 22.22 12.59 Note 7

0 611-30-WSKT-03 Welding socket-3 - UP 2nd Deck x 20.0 25.0 0.80 0.90 0.87 22.22 12.59 Note 7

0 611-30-WSKT-05 Welding socket-5 - UP 3rd Deck x 20.0 25.0 0.80 0.90 0.87 22.22 12.59 Note 7

0 611-30-WSKT-07 Welding socket-7 - UP Roof Deck x 20.0 25.0 0.80 0.90 0.87 22.22 12.59 Note 7

2 611-21-P-01-B Raw Water Lift Pump-B x 134.0 200.0 0.67 0.91 0.82 147.25 102.78 With Soft Starter

1 610-30-DB-04 400/230V Laundry Distribution Board x 88.0 110.0 0.80 0.98 0.95 89.80 29.51

1 610-30-DB-02 400/230V Galley Distribution Board-01 x 108.0 120.0 0.90 0.98 0.85 110.20 68.30

0 610-24-B-03 Potable Water Cooler-B x 13.5 18.0 0.75 0.90 0.87 15.00 8.50
Load referred from page 7
A 611-45-MCC/HCP-01 HVAC MCC - UP (Normal Power) x 633.06 366.43 208.62 0.00 377.3 217.63
(HVAC Vendor Scope of Supply)

1 610-43-L-02 Pedestal Crane - 6.5 T - LQ x 187.0 220.0 0.85 0.90 0.87 207.8 117.75 With Soft Starter

0 611-43-L-03 Electric Winch - Sensor Tower Top UP x 9.0 11.0 0.82 0.90 0.87 10.00 5.67
Load referred from page 25
A 611-30-DB-01 Auxiliary and Small Power DB- UP x 0.76 0.41 9.51 4.60 2.1 1.04
Note 6

QP Doc. no. FMBTY-2-12-0003-A


TP Doc. no. 9460H-000-CN-1697-001
APPENDIX-4 Page 3 of 4
ELECTRICAL LOAD SCHEDULE
FORWARD MOUNTED BASE (FMB) PROJECT
LOADS FOR 611-30-MSB-02-400V MAIN LV SWITCHBOARD

A
EQUIPMENT kW =
MOTOR / D CONSUMED LOAD kvar=kW.tg Φ
FEEDER LOAD EFFICIENCY POWER
ABSORBED RATING FACTOR at load FACTOR

BUS LOAD A factor C at load Continuous Intermittent Stand-by REMARKS


=
REV.

Equipment No. Description B factor C


A B C D E F G

A B kW kW in decimals in decimals cos Φ kW kVAR kW kVAR kW kVAR

0 611-30-WSKT-02 Welding socket-2 - UP 1st Deck x 20.0 25.0 0.80 0.90 0.85 22.22 13.77 Note 7

0 611-30-WSKT-04 Welding socket-4 - UP 2nd Deck x 20.0 25.0 0.80 0.90 0.85 22.22 13.77 Note 7

0 611-30-WSKT-06 Welding socket-6 - UP 3rd Deck x 20.0 25.0 0.80 0.90 0.85 22.22 13.77 Note 7

0 611-30-WSKT-08 Welding socket-8 - UP Roof Deck x 20.0 25.0 0.80 0.90 0.85 22.22 13.77 Note 7

0 611-43-L-05 Electric Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20

A 611-43-L-XX Electrical Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20 HOLD

A 611-43-L-XX Electrical Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20 HOLD

A 611-43-L-XX Electrical Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20 HOLD

A 611-43-L-XX Electrical Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20 HOLD

A 611-43-L-XX Electrical Hoist - UP x 3.5 5.0 0.80 0.90 0.87 3.89 2.20 HOLD

2 610-33-P-01-A Fire water pump x 186.0 200.0 0.93 0.91 0.82 With Soft Starter

NOTES: TOTAL kW & kVAR (BUS BAR A + BUS BAR B) 1626.72 950.30 1110.58 369.58 1583.37 943.36

TOTAL kVA 1883.96 1170.46 1843.09

Power Factor 0.86 0.95 0.86

CALCULATION SUMMARY kW kVAR kVA PF Feeder Amp.

Total Plant Running Load (TPRL) 1959.89 1061.18 2228.74 0.88 3217.00

Total Plant Peak Load (TPPL) 2118.23 1155.51 2412.91 0.88 3482.83

CONTRACTOR
CONTRACT NO. GC1211200

CONTRACTOR DOC. No

9460H-000-NM-1601-001

TITLE

OFFSHORE NATIONAL SECURITY SHIELD


FORWARD MOUNTED BASE - FMB
ELECTRICAL LOAD SCHEDULE
ORIG. DOC. SIZE: A3 THIS IS A DATABASE PRINTOUT AND MUST NOT BE ALTERED MANUALLY REV.

REV. DESCRIPTION DATE BY CHKD APP'D APP'D Doc. No. FMBTY-2-34-0001 A

QP Doc. no. FMBTY-2-12-0003-A


TP Doc. no. 9460H-000-CN-1697-001
APPENDIX-4 Page 4 of 4