Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Bill of Quantities (Boq) For Labor Work

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 7

THE PRESIDENT INFRASTRUCTURE & CONSTRUCTION AND

SIDDIQUE ENGINEERING & CONSTRUCTION JOINT VENTURE

NAME OF THE WORK : BOUNDARY WALL AT COX'S BAZAR STATION YARD, PHASE-1 (SOUTHERN SIDE)
BILL OF QUANTITIES (BOQ) FOR LABOR WORK

Ref: pic-sec(jv)/dcrp/station/cox's-bazar/boundary/001 Date: 01/03/2021

To

Project Manager

China Civil Engineering Construction Corporation and Max Infrastructure Limited (CCECC-MAX JV)

Dohazari-Cox's Bazar Railway Project


Subject: Quotation for Boundary Wall at Cox's Bazar Station Yard, Phase-1 (Southern Side).
Sir,

With due respect,we are submitting you labour charges for Boundary Wall at Cox's Bazar Station Yard, Phase-1
(Southern Side).

Our price offer is shown from next page.

Rafique Company Building, East Side of Tessipul, Ramu, Cox's Bazar


Mob:+880 01672-410593 ; +880 16889-14421 Email: president.infrastructure@gmail.com
THE PRESIDENT INFRASTRUCTURE & CONSTRUCTION AND
SIDDIQUE ENGINEERING & CONSTRUCTION JOINT VENTURE

NAME OF THE WORK : BOUNDARY WALL AT COX'S BAZAR STATION YARD, PHASE-1 (SOUTHERN SIDE)
BILL OF QUANTITIES (BOQ) FOR LABOR WORK
Item No Description of Items Unit Rate (Tk.)
1 Earthwork in Excavation: Minor manual excavation in foundation and boundary wall alignment. cft 14.5
2 Backfilling of Sand: includes sand backfilling in foundation and boundary wall alignment. cft 13.0
Leveling and Dressing the Sand Surface: Cleaning the unsuitable materials, dressing and leveling the
3 sft 3.0
sand surface.
75 mm Brick Flat Soling: including preparation of bed and filling the interstices with local sand,
4 sft 8.0
leveling etc.
5 0.07 mm Thick Polythene Sheet Laying: includes only polyethe sheet laying. sft 3.0
Reinforced Cement Concrete Work: including casting in forms,leveling, compacting by vibrator
6 cft 30.0
machine, finishing the concrete.
7 Loading, Transport and Unloading of Construction Materials: applicable only between 50~500 feet
7.1 Brick pc 1.0
7.2 Sand cft 1.0
7.3 Cement bag 10.0
7.4 Rebar kg 2.0
7.5 Shutter kg 1.0
7.6 Stone cft 5.0
Reinforcement Fabrication: including straightening, cutting and cleaning rust, if any, bending and
8 kg 8.0
binding in position with of G.I. wires and fixing to detail of reinforcement as per design.
9 Making of 40 mm, 65mm Concrete Cover Block: including placement in proper place etc. pc 3.0
125 mm Brick Work: includes brick work with cement sand mortar and making bond with connected
10 sft 31.0
walls including necessary scaffolding.
250 mm Brick Work: includes brick work with cement sand mortar and making bond with connected
11 sft 45.0
walls including necessary scaffolding.
12 mm Cement Sand Plaster: including plaster with fresh cement to the surface of wall, finishing the
12 sft 22.0
corner and edges, scaffolding and other charges etc.
Cleaning and Oiling of Shutter: including scraping with sand paper, cleaning of rust, concrete and
13 sft 5.0
oiling the shutter.
Fitting and Fixing of Shutter: including moving one place to another, centering, fitting, necessary
14 sft 30.0
supports.
Making of Wooden Shutter: including cutting of plywood and wooden batten as desired dimensions,
15 sft 26.0
nailed with wooden batten.
Fare Face Finishing Work: including leveling, smoothing the concrete surface, coating with white
16 sft 21.0
cement etc.

17 Column Joint Filler: including pouring, finishing the surface cft 104.0

18 Coping on Top of Boundary Wall: including maintaining the proper grade, finishing the surface. sft 62.0

Paint (Weather Coat): applying to exterior surface with surface preparation including cleaning, drying,
19 making free from dirt, grease, wax,mending good the surface defects using sand paper and necessary sft 11.0
scaffolding.

Rafique Company Building, East Side of Tessipul, Ramu, Cox's Bazar


Mob:+880 01672-410593 ; +880 16889-14421 Email: president.infrastructure@gmail.com
THE PRESIDENT INFRASTRUCTURE & CONSTRUCTION AND
SIDDIQUE ENGINEERING & CONSTRUCTION JOINT VENTURE

NAME OF THE WORK : BOUNDARY WALL AT COX'S BAZAR STATION YARD, PHASE-1 (SOUTHERN SIDE)
BILL OF QUANTITIES (BOQ) FOR LABOR WORK

Ref: pic-sec(jv)/dcrp/station/cox's-bazar/boundary/001

To

Project Manager
China Civil Engineering Construction Corporation and Max Infrastructure Limited (CCECC-MAX JV)

Dohazari-Cox's Bazar Railway Project


Subject: Quotation for Boundary Wall at Cox's Bazar Station Yard, Phase-1 (Southern Side).
Sir,

With due respect,we are submitting you labour charges for Boundary Wall at Cox's Bazar Station Yard, Phase-1
(Southern Side).

Our price offer is shown from next page.


Rafique Company Building, East Side of Tessipul, Ramu, Cox's Bazar
Mob:+880 01672-410593 ; +880 16889-14421 Email: president.infrastructure@gmail.com
TURE

UTHERN SIDE)

Date: 01/03/2021

MAX JV)

ation Yard, Phase-1

You might also like