Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

A B C D E F B C D: Lighting Layout Plan

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

REPUBLIC OF THE PHILLIPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

OFFICE OF THE BUILDING OFFICIAL


MANDAUE CITY

A B C D E F GEN. ELECTRICAL NOTES


RECOMMENDING ISSUANCE AS TO:

1. ALL ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. HEAD SECTION DATE
THE APPLICABLE PROVISIONS OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC),
27.57
B C D
THE RULES AND REGULATIONS OF THE LOCAL ENFORCING AUHORITY AND THE REQUIREMENTS THE
LOCAL POWER COMPANY. THE ELECTRICAL WORKS SHALL BE DONE UNDER THE IMMEDIATE
SUPERVISON OF A DULY REGISTERED ELECTRICAL ENGINEER.
ISSUED BY:
2. ALL MATERIALS TO BE USED IN THIS PROJECT SHALL BE OF APPROVED QUALITY.

5.00 4.58 5.99 6.00 6.00 3. WIRING METHOD SHALL BE AS FOLLOWS:


a. SERVICE ENTRANCE WIRE-RSC BUILDING OFFICIAL DATE
b. LIGHTING,POWER RECEPTACLE, BRANCH CKT AND AUXILLIARY-(PVC)
c. FEEDER WIRE-IMC

4. ALL WIRES SHALL BE CIPPER AND THERMOPLASTIC INSULATED TYPE "THW" OR THERMOPLASTIC

LEGENDS
1
HIGH-RESISTANT NYLON COATED THHN" OTHERWISE INDICATED IN THE PLAN. THE MINIMUM SIZE OF
WIRE FOR LIGHTING CIRCUIT HOMERUN SHALL BE 3.5mm sq.m AND POWER CIRCUIT HOMERUN
20w PL
LANDING SHALL BE 5.5mm sq.m AND INSULATED FOR 600 VOLTS. SMALLEST RACEWAY SHALL BE 15mm dia.
20w PL
TRADE/NOMINAL SIZE.
24w T5
5. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOWS:
6.04

20w PIN LIGHT


a. LIGHT SWITCH -1.2 m ABOVE FINISH FLOOR
b. CONVENIENCE OUTLET -0.3 m ABOVE FINISH FLOOR
2-24w T5 2-24w T5 CONVENIENCE OUTLET
c. PANEL BOARD -1.5 m ABOVE FINISH FLOOR CO
d. FIRE ALARM STATION OUTLET -1.5m ABOVE FINISH FLOOR
e. PUSH BUTTON OUTLET -1.2m ABOVE FINISH FLOOR

2
25w PL f. FIRE ALARM &BELL -0.3 m BELOW CEILING LINE AIR CONDITIONING UNIT
25w PL 25w PL 25w PL

DN
25w PL PB1 6. GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND POWER CIRCUIT AS PER
C5 PHILIPPINE ELECTRICAL CODE (PEC) REQUIREMENT. CIRCUIT HOMERUN
5.80

7. PANEL BOARD CABINET SHALL BE PROPERLY GROUNDED.


PB PANEL BOARD
8. THE CONTRACTOR SHALL VERIFY AND ORIENT THE ACTUAL LOCATION OF SERVICE ENTRANCE FOR
20w PL
CONNECTION TO POWER SUPPLY.
s1 SINGLE POLE SWITCH

3
9. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION FROM THE DULY
25w PL 25w PL
LICENSED REGISTERED ELECTRICAL ENGINEER OR MASTER ELECTRICIAN. s2 DOUBLE POLE SWITCH
25w PL 25w PL 25w PL
10. GFCI PROTECTION MUST BE INSTALLED FOR ALL 15A AND 20A ,125V RECEPTACLES LOCATED IN s3 TRIPLE POLE SWITCH
BATHROOMS, ROOFTOPS, AND KITCHENS IN COMMERCIAL/INDUSTRIAL FACILITIES AS PER PHILIPPINE
SWITCH LINE
5.96

ELECTRICAL CODE (PEC) REQUIREMENT.

B C D LIGHTING LINE/
POWER LINE

4 PB2
C1
25w PL

2-24w T5
25w PL
25w PL
25w PL
25w PL

SECOND FLOOR OFFICE


LIGHTING LAYOUT PLAN
6.16

SCALE 1:150 METERS


46.27

20w PL

N
5
PB

20w PL
B C D
5.81

2-24w T5 2-24w T5
DN

6 PB
25w PL 25w PL 25w PL
6.36

7 PB2
C1 25w PL 25w PL 25w PL 25w PL 25w PL
PB1
C3
5.78

PB1
C2

8 25w PL 25w PL 25w PL 25w PL


4.30

9 B C D
SECOND FLOOR OFFICE
LIGHTING LAYOUT LIGHTING LAYOUT PLAN VICINITY MAP
SCALE 1:150 METERS SCALE 1:150 METERS NTS

FROM THE OFFICE OF: S E A L PROJECT TITLE PROJECT OWNER: SHEET CONTENT REVISION: SHEET NO.
JENNIFER C.LIONG

FERDINAND L. RUBIA PROPOSED 2-STOREY COMMERCIAL W/ ROOFDECK


ABIGAIL C. YOUNG
KIRK PHILIPSON O. CHAN

ADDRESS : A.S FORTUNA ST., MANDAUE CITY


PROF. ELECTRICAL ENGINEER AND WAREHOUSE ( CONSTRUCTION MATERIALS )
KENLEY LAWRENCE O.CHAN
LIAM LOUIS MACASOCOL
AS SHOWN E2
PRC NO. : 113494
REG. DATE : 06 / 01 / 09
PTR NO. : 5579669
DATE ISSUED : 01 / 12 / 15
OWNER CAD BY: BOM'S
2/4
CHECKED BY:
VALIDITY : 01 / 31 / 18 TIN NO. : 253-330-794 LOCATION: MAGUIKAY , MANDAUE CITY ADDRESS : MAGUIKAY , MANDAUE CITY APPROVED BY:

You might also like