Manutapen Baru BH. 02 Dan BH
Manutapen Baru BH. 02 Dan BH
Manutapen Baru BH. 02 Dan BH
Sample
Sampel Descriptions
1 2
Weight of Can (gr) 9.10 9.40
BH. 01 (12-13 m)
Sample
Sampel Description
1 2 3
Weight of ring (gr) 77.60 77.60 77.60
BH. 01 (12-13 m)
Sample
Sampel Description
1 2
Weight of Picnometer (gr) W1 32.90 31.50
BH. 01 (12-13 m)
BH. 01 (12-13 m)
Liquid Limit
Plastic Limit
No of blows 13 25 38 `
Can No. 1 2 3 1 3
Weight of wet soil + can (gr) 34.40 29.90 32.30 17.10
Weight of dry soil + can (gr) 25.70 22.90 24.90 15.30
Weight of water (gr) 8.70 7.00 7.40 1.80
Weight of can (gr) 9.70 9.00 9.00 8.90
Weight of dry soil (gr) 16.00 13.90 15.90 6.40
Water content (%) 54.38 50.36 46.54 28.13
Flow Curve
55.00
Water content (%)
40.00
10 100
No of blows
BH. 02 (12-13 m)
Liquid Limit
Plastic Limit
No of blows 12 25 36 `
Can No. 1 2 3 1 2 3
Weight of wet soil + can (gr) 37.40 39.40 32.80 18.70
Weight of dry soil + can (gr) 28.50 30.80 26.50 16.90
Weight of water (gr) 8.90 8.60 6.30 1.80
Weight of can (gr) 8.60 9.60 9.20 9.00
Weight of dry soil (gr) 19.90 21.20 17.30 7.90
Water content (%) 44.72 40.57 36.42 22.78
Flow Curve
45.00
Water content (%)
30.00
10 100
No of blows
0.250
Shear Stress (kg/cm2)
0.200
0.150
0.100 y = 0.4147x + 0.0778
0.050
0.000
0.000 0.100 0.200 0.300 0.400
Normal stress (kg/cm2)
kg/cm2
O
Cohesivness (c) = 0.078 Internal skin friction φ = 22.52
0.300
0.200
0.100 y = 0.5654x + 0.1688
0.000
0.000 0.100 0.200 0.300 0.400
Normal stress (kg/cm2)
Saringan % kumulatif
Berat tertahan (gr) % tertahan % kumulatif Lolos
No. Diameter (mm) tertahan
2" 50.8 0.0 0.00 0.00 100.00
1½" 38.1 0.0 0.00 0.00 100.00
1" 25.4 0.0 0.00 0.00 100.00
3/4" 19.05 0.0 0.00 0.00 100.00
1/2" 12.7 0.0 0.00 0.00 100.00
3/8' 9.5 9.2 1.50 1.50 98.50
4 4.75 36.6 5.98 7.48 92.52
10 2.00 29.2 4.77 12.25 87.75
20 1.18 12.5 2.04 14.29 85.71
40 0.600 7.4 1.21 15.50 84.50
60 0.300 3.4 0.56 16.05 83.95
100 0.150 2.7 0.44 16.50 83.50
200 0.075 0.9 0.15 16.64 83.36
0.0567 68.63
0.0405 66.97
0.0289 65.32
0.0206 63.66
0.0147 62.01
0.0109 58.70
0.0079 55.40
0.0057 50.44
0.0041 47.13
0.0029 42.17
0.0021 37.21
0.0013 30.59
0.0001 Grafik Analisa Butir 0
100.00
90.00
80.00
70.00
% Lolos Kumulatif
60.00
50.00 D 60 0.250965251
40.00 D 30 0.001021234
D 10 0.000407078
30.00
20.00
10.00
0.00
0.000 0.001 0.010 0.100 1.000 10.000 100.000
% Clay = = 42.17 %
% Silt = 41.19 %
% Sand = 9.16 %
% Gravel = 7.48 %
Saringan
% kumulatif
Berat tertahan (gr) % tertahan % kumulatif Lolos
No. Diameter (mm) tertahan
2" 50.8 0.0 0.00 0.00 100.00
1½" 38.1 0.0 0.00 0.00 100.00
1" 25.4 0 0.00 0.00 100.00
3/4" 19.05 0 0.00 0.00 100.00
1/2" 12.7 0 0.00 0.00 100.00
3/8' 9.5 6.1 0.94 0.94 99.06
4 4.75 45.4 6.96 7.90 92.10
10 2.00 73.5 11.27 19.17 80.83
20 1.18 41.2 6.32 25.48 74.52
40 0.600 11.5 1.76 27.25 72.75
60 0.300 8.0 1.23 28.47 71.53
100 0.150 3.1 0.48 28.95 71.05
200 0.075 0.6 0.09 29.04 70.96
0.0592 60.17
0.0421 58.75
0.0301 57.33
0.0215 55.92
0.0153 54.50
0.0114 51.67
0.0082 48.84
0.0059 44.59
0.0042 41.76
0.0031 37.51
0.0022 33.27
0.0013 29.02
0.0001 Grafik Analisa Butir 0
100.00
90.00
80.00
70.00
% Lolos Kumulatif
60.00
50.00 D 60 0.070603217
40.00 D 30 0.001198861
30.00
D 10 0.000466287
20.00
10.00
0.00
0.000 0.001 0.010 0.100 1.000 Gram 10.000 100.000
% Clay = = 37.51 %
% Silt = 33.45 %
% Sand = 21.14 %
% Gravel = 7.90 %
RESUME
Atterberg Limits :
Direct Shear :
Grain Size :