11.0 Quantity Surveying / Bill Quantity: Item NO. Description Unit Rate Amount (RM)

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

11.

0 QUANTITY SURVEYING / BILL QUANTITY

ITEM DESCRIPTION UNIT RATE AMOUNT


NO. (RM)
1 PRELIMINARIES AND GENERAL Lump sum

2 SITE CLEARANCE WORKS (ALL


PROVISIONAL)

The work included in this section Lump sum


comprises surveying the whole of the site
by a licensed land surveyor to the approval
of the S.O.
3
PRESTRESSED CONCRETE SPUN PILE

Allow for the protection, maintenance and Lump sum


removal of all existing services, walls,
pipes, underground and overhead cables,
street lights etc. during the execution of the
Works.

Allow for the provision of all necessary Lump sum


piling equipment, plant, tools and
4 ancillaries, assembling and erecting and
dismantling and removal off site upon
completion

Lean concrete Grade 30 as described:- Refer table


below
50mm Thick blinding spread and levelled M3
5 under under pile cap
Refer table
Ditto under ground beam. M2 below

Vibrated reinforced concrete Grade 30 as


described in:-

6 Pile cap M3 Refer table


below
Column stump (provisional). M3
Vibrated reinforced concrete Grade 30
as described in:-

300mm x 600mm Ground beam M3

350mm x 600mm Ground beam M3


Refer table
7 125mm Thick ground slab. M3 below

125mm Thick ground slab. M3

Sawn formwork as described:-

To sides of pile cap. M2

8 Ditto of column stump M2 Refer table


below
(provisional) Ditto of beam. M2

BUILDING STRUCTURE DETAIL:-

Level mezzanine, first floor, second


floor and third floor

Roof structure
9
Allow detail as describe in table below ITEM
for every level including roof. Refer table
below
RECTIFICATION WORKS

Based on determination on site condition


during the Site Visit, the Tenderer shall -
:-

Inside Building:-
ITEM -
To make good existing 2 point of
cracked brickwall/column at Inside
Building (approximately 1 meter long
crack) ITEM -

To make good existing 2 point of


horizontal cracked brickwall/column at
the corner side of the office
To make good existing gap between ITEM -
wall/column at the side of office
room
ITEM -
To make good existing crack at upper side
ITEM - Refer table
To make good existing horizontal below
cracked brickwall/column along lab store
ITEM -
To make good existing cracked wall at
meeting room. To make sure door can be
closed properly. (approximately 2 meters
long crack)

Other works

Make good work which are not described


above but shown on the drawings and are
deemed necessary for the proper
completion of the rectification works (to
be detailed up by the Tenderer)