You are on page 1of 22

SCADA/EMS Requirements for

Large Scale Solar Plant


GRID SYSTEM OPERATOR
Table of Contents
1. NLDC SYSTEM ARCHITECTURE
2. GSO INTERFACING GUIDELINES FOR SCADA/EMS
SYSTEM
i. TECHNICAL REQUIREMENTS
ii. LSS SIGNAL LIST
3. SCADA/EMS TESTING
i. PROTOCOL
ii. OFFLINE
iii. PRE-ONLINE
iv. ONLINE
4. QUESTIONS & ANSWER
NLDC SYSTEM
ARCHITECTURE
NLDC – System Architecture

BCC -
NLDC – National Backup Control
Load Despatch Center
Center

BCR – Backup Control Room


NLDC – SYSTEM ARCHITECTURE
IEC 60870-5-104
NLDC – SYSTEM ARCHITECTURE
IEC 60870-5-104
NLDC Operator
NLDC
SCADA/EMS
Servers

Front End Servers

FEN0 FEN1 FEN2 FEN3 FEN4 FEN5 FEN6

BBTN BGJH KTNN YGPE SRDG MCCA PULU KULW


RTCS – Remote Terminal
Communication Servers

Ch A Ch B Ch A Ch B Ch A Ch B Ch A Ch B

RTU
NLDC – SYSTEM ARCHITECTURE
IEC 60870-5-104
NLDC BCC
IDS/IPS IDS/IPS
Network Firewall Network Firewall
Network Switch Network Switch

RTCS BBTN RTCS BGJH


Network Firewall Network Firewall
Network Switch Network Switch

Issues:
1. IP Management
CH-A CH-B 2. IP Routing
3. Network Security
RTU 4. Physical Security
NLDC – SYSTEM ARCHITECTURE
IEC 60870-5-104
NLDC BCC
FrontEnd Servers FE FE FrontEnd Servers
Network Firewall / IDS Network Firewall / IDS
Network Switch Network Switch

RTCS BBTN RTCS BGJH


Network Firewall Network Firewall
Network Switch Network Switch

CH-A CH-B

Firewall
IP Address A IP Address B
Subnet 255.255.255.248 Subnet 255.255.255.248
Gateway IP Address A RTU Gateway IP Address B
NLDC – SYSTEM ARCHITECTURE
IEC 60870-5-104

NLDC BCC

MPLS
Multiprotocol Level Switching

CH-A CH-B

RTU
NLDC – SYSTEM ARCHITECTURE
IEC 60870-5-104

List of Certified RTU – Remote Terminal Unit


• ABB - 560
• Foxboro – SCD5200
• Dong Fang – DF1331
• Dong Fang – DF1725
Listed RTU – comply the IEC 60870-5-104 Integration Test
with GE SCADA/EMS Master System
GSO INTERFACING
GUIDELINES FOR
SCADA/EMS SYSTEM

- TECHNICAL
REQUIREMENTS
GSO INTERFACING GUIDELINES FOR
SCADA/EMS SYSTEM - TECHNICAL REQUIREMENTS
GSO INTERFACING GUIDELINES FOR
SCADA/EMS SYSTEM - LSS SIGNAL LIST

APC
(Automatic Power
AHVC
(Automatic High
ADMIN
Curtailment) Voltage Control)

Digital Signal from Digital Signal from Meteorological


Plant to NLDC Plant to NLDC Analog Signal from
Plant to NLDC
Analog Signal from Analog Signal from
Plant to NLDC Plant to NLDC Administrative
Digital Signal from
Digital Signal from Digital Signal from Plant to NLDC
NLDC to Plant NLDC to Plant
Administrative
Analog Signal from Analog Signal from Digital Signal from
NLDC to Plant NLDC to Plant NLDC to Plant
GSO INTERFACING GUIDELINES FOR
SCADA/EMS SYSTEM - LSS SIGNAL LIST
SCADA / EMS
TESTING
TESTING TIMELINE
Pre-BE BE IOD COD

Prior to BE Prior to IOD Prior to COD


• Commissioning • EMS Offline Test • EMS Pre-online Test
Switching Station /
Bay Extension - RTU
• MMF Live Data • EMS Online Test
• ICT Communication including MW 15
Testing – RTU minutes forecast
Station / RTU LSS (For Web services)
• SCADA Random
Protocol Test – RTU
LSS
• SCADA/EMS
Database
SCADA TESTING
- PROTOCOL TEST

1. Communication Establish on both channel


(channel A & B)
2. Random testing on each point of Analog, Digital
and Control Signal based on given signal list. e.g.
MW, Mvar - reading, CB, Watchdog – status and
Open/Close, Set Points – Command
3. PIC :SCADA Team @ NLDC
EMS TESTING
- OFFLINE TEST

1. Point-to-point test
2. To ensure all signals can be transmitted and
received by both NLDC and PLANT
3. PIC:EMS Team @ NLDC
EMS TESTING
- PRE-ONLINE TEST & ONLINE TEST

Pre-online Test
To test all required logics implemented
correctly based on EMS technical
requirements before online can commence
PIC: EMS Team @ NLDC

Online Test
Testing commence at site as per APC & AHVC
commissioning plan
PIC: EMS Team @ LSS Plant
EMS TESTING
- APC Test Plan
EMS TESTING
- AHVC Test Plan
THANK YOU