Checklist-CB Testing
Checklist-CB Testing
1. Visual Inspections.
CB MAIN CONTACTS
MICRO OHM
METER
R Y B
At the CB Closed
Connect the phases Y, B to ground and apply the test voltage between phase R and ground.
Connect the phases B, R to ground and apply the test voltage between phase Y and ground.
Connect the phases R, Y to ground and apply the test voltage between phase B and ground.
Record the corresponding leakage current readings.
At the CB Open
AC high- pot test shall be carried out in accordance with IEC standard at site. Normally it is
Three times of the phase to neutral voltage.
The test will carry out for 60 second.
If the test has been done at factory at any kV it will be done at site at 80% of the last time.
At the CB Closed
Connect the phases Y, B to ground and apply the test voltage between phase R and ground.
Connect the phases B, R to ground and apply the test voltage between phase Y and ground.
Connect the phases R, Y to ground and apply the test voltage between phase B and ground.
Record the corresponding leakage current readings.
CB MAIN CONTACTS
HIGH POT
TESTER
R Y B
At the CB Open
CB MAIN CONTACTS
HIGH POT
TESTER
R Y B
At the CB Closed
Connect the phases Y, B to ground and apply the test voltage between phase R and ground.
Connect the phases B, R to ground and apply the test voltage between phase Y and ground.
Connect the phases R, Y to ground and apply the test voltage between phase B and ground.
Record the corresponding leakage current readings.
At the CB Open
Connect the phases R, Y, B Cable side to the ground.
Connect the phases R, Y, B Bus side to the test set.
Record the corresponding leakage current readings.
6. Check Correct Operation Of All Auxiliary Contacts (For Breaker Open/Closed Positions).
7. Timing Test Using An Electronic Oscillograph.
CB MAIN CONTACTS
CH. 1
R Y B
CH. 2
CH. 3
CLOSING ORDER
CB CLOSING TERMINALS
TRIPPING ORDER
CB TRIPPING TERMINALS
DC SUPPLY +