Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Saudi Aramco Requirements Technical Links, Comments & Exceptions

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

SAUDI ARAMCO

SAUDI ARAMCO REQUIREMENTS


TECHNICAL LINKS, COMMENTS & EXCEPTIONS

Comments Exceptions
Links are to Current Saudi Aramco Standards

Saudi Aramco Engineering Procedure


Instructions for Obtaining a Waiver of a Mandatory Saudi
SAEP-302 Aramco Engineering Requirement

Saudi Aramco Engineering Standards


SAES-A-004 General Requirements for Pressure Testing
SAES-L-100 Applicable Codes and Standards for Pressure Piping Systems
SAES-L-105 Piping Materials Specifications
SAES-L-125 Safety Instruction Sheet for Piping and Pipelines
SAES-L-150 Pressure Testing of Plant Piping and Pipelines
SAES-L-310 Design of Plant Piping
SAES-L-410 Design of Pipelines
SAES-L-450 Construction of On-Land and Near Shore Pipelines
SAES-L-460 Pipeline Crossings under Roads and Railroads

Saudi Aramco Forms and Data Sheets


2821-ENG Safety Instruction Sheet - Critical Plant Piping
Safety Instruction Sheet for Cross Country Pipelines – Main
5645-1-ENG Line Pipe
Safety Instruction Sheet for Cross Country Pipelines –
5645-2-ENG Critical Piping
5645-3-ENG Safety Instruction Sheet - Terminal and Bulk Plant Piping

American Society of Mechanical Engineers

Page 1 of 2
Saudi Aramco 5645-2-ENG (11/2010)

SAUDI ARABIAN OIL COMPANY

THIS REVISION IS NOT TO BE USED FOR


CONSTRUCTION UNTIL CERTIFIED AND
SAFETY INSTRUCTION SHEET FOR CROSS COUNTRY PIPELINE - CRITICAL PIPING
1 PIPELINE NAME 2 START POINT 3 END POINT 4 SERVICE 5 VALVE OPER. DIAGRAM 6 YR. BUILT

PRODUCTION LINE MOBILE SKID TIE-IN WELLSITE SWEET GAS N.A. *

DATED
ISSUED FOR CONSTRUCTION
7 EQUIPMENT NAME 6"-P-0104-9CS9P,4"-P-0104/0131-9CS9P EQUIPMENT NAME 2"-P-0122/0132-9CS9P

8 LOCATION (@ Km.) HRDH-1219 WELLSITE LOCATION (@ Km.) HRDH-1219 WELLSITE


REVISION DESCRIPTION

9 SECTION OPTF AREA AND TIE-IN @ HRDH-698 SECTION OPTF AREA AND TIE-IN @ HRDH-698

10 EQUIP. CATEGORY EQUIP. CATEGORY

11 SIZE in. 6 in. 4 in. SIZE in. 2 in.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
12 W.T. in. 0.500 0.438 W.T. in. 0.344

13 MATERIAL C.S C.S MATERIAL C.S


PIPE

PIPE
14 WELD TYPE SMLS SMLS WELD TYPE SMLS
07/31/2016

15 SPEC. / GR. API-5L GR.X60 API-5L GR.X60 SPEC. / GR. API-5L GR.B
DATE

10-01277-6497

16 COATING TYPE APCS-26 APCS-26 COATING TYPE APCS-26


JOB ORDER/EWO NO.

EQUIPMENT DATA

17 RATING Match to pipe Match to pipe RATING Match to pipe


FITTING

FITTING
18 FACING Match to pipe Match to pipe FACING Match to pipe
REV. NO.

00

19 MATERIAL C.S. C.S. MATERIAL C.S.

20 SPEC. / GR. A860 WPHY60 A860 WPHY60 SPEC. / GR. A234 GR.WPB

21 REMARKS REMARKS
BY/DATE
OTHER

** BURIED PIPING PORTION SHALL BE EXTERNALLY FBE COATED WITH APCS-104

PIPE WALL THICKNESS WITH 0.236" CORROSION ALLOWANCE.


OPERATIONS/DATE

22 FLANGE RATING 900 900 FLANGE RATING 1500


07/31/2016
AMR

23 FLANGE FACING RTJ RTJ FLANGE FACING RTJ

24 FLANGE MAT'L SPECIFICATIO ASTM A707L3 CL3 ASTM A707L3 CL3 FLANGE MAT'L SPECIFICATIO ASTM A350LF2

25 M.A.O.P. 2014 PSIG, LIMITED BY: VLVE BODY M.A.O.P. 2014 PSIG, LIMITED BY: VLVE BODY
REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO)

26 DESIGN FACTOR 0.72 DESIGN FACTOR 0.72

27 DESIGN TEMPERATURE: 230 oF DESIGN TEMPERATURE: (°F) 230 oF

28 TEST PRESSURE 3350 PSIG TEST PRESSURE 3350 PSIG


OPERATING LIMITS
CONST. AGENCY/DATE

INITIAL INITIAL
PRESSURE 29 TEST DATE * PRESSURE TEST DATE
TEST TEST
07/31/2016

30 LIMITED BY VLV BODY LIMITED BY VLV BODY


SAH

31 TEST PRESSURE * PSIG TEST PRESSURE PSIG

REVALIDATION 32 TEST DATE * REVALIDATION TEST DATE



33 LIMITED BY * LIMITED BY

34 SYSTEM M.A.O.P. 2000 PSIG SYSTEM M.A.O.P. 2000 PSIG

35 LIMITED BY DESIGN CONDITION LIMITED BY DESIGN CONDITION

36 SAFETY VALVE SET PRESS. 3518 PZV SAFETY VALVE SET PRESS. 3518 PZV
CERTIFIED/DATE

DES THK @ 37 PIPE SIZE 6 in. 4 DES THK @ PIPE SIZE 2


07/31/2016

in. in. in. in. in.


RBS

SYSTEM MAOP 38 PIPE Tm 0.389 in. 0.340 in. in. SYSTEM MAOP PIPE Tm 0.330 in. in. in.
DESIGN CERTIFICATION

& DES TEMP 39 PIPE Tca 0.111 in. 0.098 in. in. & DES TEMP PIPE Tca 0.014 in. in. in.
(DESIGN AGENCY)

40 OSI DATA POINTS OSI DATA POINTS


OSI DATA POINT INFO.

SEQ. DATE WT(in). DATE WT(in). DATE WT(in). SEQ. DATE WT(in). DATE WT(in). DATE WT(in).

1 1
ENGG./DATE

07/31/2016

2 2
EST

3 3

4 4

5 5

6 6

41 REMARKS REMARKS

* TO BE FILLED OUT BY CONSTRUCTION DURING THE TEST.

** SAFETY VALVE SET PRESSURE SHALL BE FOR STRENGTH TEST ONLY.


IS COVERED, FOR ALL APPROVAL

PRESSURE TESTING SAFELY AS PER GI-2.102


AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

WORK PERMIT SYSTEM AS PER GI-2.100


10-01277-6497-017
REVISION VALIDATION

42 REFERENCE DWGS REFERENCE DWGS


DRAWING COMPLETION CERTIFICATE NO.

ANSI B31.8. ANSI B31.8.

PIPING AND INSTRUMENT DIAGRAM .:BA-660049.001 & 006 PIPING AND INSTRUMENT DIAGRAM .:BA-660049.001 & 006

HYDROSTATIC TEST DIAGRAM .: BA-660055.001 & 002 HYDROSTATIC TEST DIAGRAM .: BA-660055.001 & 002
00
THIS REVISION NO.

SIS FOR 6"-P-0104-9CS9P,4"-P-0104/0131-9CS9P,2"-P-0122/0132-9CS9P DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO

TIE-IN HRDH-1219 GAS WELL TO HRDH-698 SIS


1
HARADH GAS GATHERING MANIFOLD D83 A BE-660053 OF 00
HARADH SAUDI ARABIA
4
EKRD/5645-2-1110.XLS