Appendix-4 Restraint Report: Saudi Arabian Oil Company
Appendix-4 Restraint Report: Saudi Arabian Oil Company
Appendix-4 Restraint Report: Saudi Arabian Oil Company
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
A
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
A 03/30/20 -
OF THIS DRAWING IS COVERED, FOR ALL ISSUED FOR REVIEW JAA RCJ
CONTROL NUMBER
RCJ
BME
JAA
APPROVAL/CERTIFICATION REQUIREMENTS,
AGENCY
BY:
PROJECT
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
DISCIPLINE
CERTIFIED
03/30/20
03/30/20
03/30/20
OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________
- DATE:
JUBAIL
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
F13
JO / EWO:
APPENDIX-4
L
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY
RE
RESTRAINT REPORT
-
-
DRAWING NO.
12
OF
SHT.NO.
EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.