Technical Specification Fire Detection and Alarm System: Saudi Arabian Oil Company
Technical Specification Fire Detection and Alarm System: Saudi Arabian Oil Company
REVISION CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
00B
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
02-05-18 - ISSUED FOR 60% DESIGN REVIEW JRB JRB
OF THIS DRAWING IS COVERED, FOR ALL
00A
JVM
JRB
CONTROL NUMBER
JRB
-
APPROVAL/CERTIFICATION REQUIREMENTS, 03-07-18 ISSUED FOR 90% DESIGN REVIEW JRB JRB
00B
AGENCY
BY:
PROJECT
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
DISCIPLINE
07-MAR-18
07-MAR-18
CERTIFIED
07-MAR-18
OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:
HARMALIYAH
Saudi Aramco 2616-ENG (03/99)
HARMALIYAH CAMP
KHUFF GAS PROJECT
TECH. SPECIFICATION-FIRE DETECTION & ALARM SYSTEM
SAUDI ARABIA
DOC
DWG.TYPE
PREPARED BY:
N/A
MARCH 07, 2018
JO / EWO:
HARMALIYAH CAMP
-
B
KHUFF GAS PROJECT
DRAWING NO.
FIRE DETECTION AND ALARM SYSTEM
1 PB-838054
13
OF
SHT.NO.
00B
EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
TABLE OF CONTENTS
ENGG CERT
JRB
JRB
1.1 ....... DEFINITIONS ............................................................................................3
1.2 ....... SCOPE.......................................................................................................3
ISSUED FOR 90% DESIGN REVIEW
ISSUED FOR 60% DESIGN REVIEW
3.2 ....... SYSTEM DESIGN......................................................................................6
02-05-18
03-07-18
DATE
00B
NO.
REV
DISCIPLINE
ENGINEER
4.0 PRODUCTS ...........................................................................................................7
JRB
07-MAR-18
4.1 ....... VENDORS .................................................................................................7
DATE:
PROJECT
ENGINEER 4.2 ....... EQUIPMENT AND MATERIAL - GENERAL ..............................................7
JVM
07-MAR-18
DATE: 4.3 ....... FIRE DETECTION AND ALARM SYSTEMCONTROL PANEL .................8
CERTIFIED
JRB
07-MAR-18
4.4 ....... FIRE EXTINGUISHERS.............................................................................9
DATE:
CONSTRUCTION
AGENCY 4.5 ....... SMOKE DETECTOR – SPOT TYPE IONIZATION ....................................9
5.0 INSTALLATION...................................................................................................11
DATE:
TECH. SPECIFICATION-FIRE DETECTION & ALARM SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.0 DOCUMENTATION .............................................................................................12
7.1 ....... VENDOR DOCUMENTS..........................................................................12
ENGG CERT
JRB
JRB
1.0 INTRODUCTION
DESCRIPTION
1.1 DEFINITIONS
03-07-18
DATE
00B
NO.
REV
DISCIPLINE
Class-A Wiring Circuit arranged and electrically supervised so a
ENGINEER
JRB
single break or single ground fault condition will be
07-MAR-18
indicated by a trouble signal at the Fire Detection
DATE:
PROJECT
: and Alarm system Panel and the circuit will continue
ENGINEER to be capable of operation for its intended service in
JVM
07-MAR-18
the faulted condition no matter where the break or
DATE:
CERTIFIED
ground fault condition occurs.
JRB
1.2 SCOPE
EDSD
DATE:
1.2.1 This Technical Specification covers the minimum requirements for the design,
BY:
materials, fabrication, supply, installation, factory and operational testing for the
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
TECH. SPECIFICATION-FIRE DETECTION & ALARM SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.2.2 The system shall comply with all the requirements of this specification. Any
deviation to these requirements shall require a written approval from SAUDI
ARAMCO or an authorized representative.
ENGG CERT
JRB
JRB
1.2.3 The system shall include, but not limited to, all Fire Detection and Alarm
JRB
JRB
1.2.4 Fire Detection and Alarm System shall be provided for but not be limited to the
ISSUED FOR 90% DESIGN REVIEW
ISSUED FOR 60% DESIGN REVIEW
Detection and Alarm System and in strict compliance with this specification,
Saudi Aramco Standards & Procedures, Industry Codes & Standards and other
associated documents.
2.0 REFERENCES
03-07-18
DATE
00B
NO.
REV
TECH. SPECIFICATION-FIRE DETECTION & ALARM SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PB-838043 Fire Detection and Alarm system Layout – B06
Project Manager room
ENGG CERT
JRB
JRB
Equipment
SAES-P-104 Wiring Methods and Materials
SAES-U-101 Regulated Vendor List For Fire Protection Equipment
DESCRIPTION
34-SAMSS-815 Annunciators
34-SAMSS-820 Instrument Control Cabinets - Indoor
system stations
NMR 7930-2 Nonmaterial Requirements for Fire Detection and
02-05-18
03-07-18
DATE
00B
NO.
REV
DATE:
07-MAR-18 2.5 INDUSTRY CODES AND STANDARDS
CERTIFIED
JRB
To the extent specified herein, the latest edition or revisions of the following
07-MAR-18
DATE: standards form part of this specification.
CONSTRUCTION
AGENCY
DATE:
OPERATIONS National Fire Protection Association (NFPA)
TECH. SPECIFICATION-FIRE DETECTION & ALARM SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
UL 464 - Audible Signaling Appliances
JRB
UL 864
Systems
03-07-18
DATE
00B
NO.
REV
3.2.5 It shall be possible to connect and mix both detectors and manual Fire
DATE:
BY:
Detection and Alarm system stations in the same network of a zone. In such
cases, initiation of manual Fire Detection and Alarm system station shall be
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00B
given the highest priority when other type of initiating signals are received at
the control panel at or near the same time. This could be accomplished through
(DCC) NO. _____________________
TECH. SPECIFICATION-FIRE DETECTION & ALARM SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.2.6 The Fire Detection and Alarm system Control Panel shall initiate alarm and give
output to field and other panels. For this purpose, the panel shall be
ENGG CERT
JRB
JRB
3.2.7 For each zone alarm output and for common alarm output, there shall be
provided at least Four (04) Form C auxiliary relay contacts rated 3 amperes at
120 VAC in the FACP. The spare contacts shall be used by others.
ISSUED FOR 90% DESIGN REVIEW
ISSUED FOR 60% DESIGN REVIEW
3.2.8 VENDOR shall provide a common dry output contact (N.O.) free of voltage in
FACP. Upon Fire Detection and Fire Detection and Alarm system activation,
DESCRIPTION
3.2.9 Vendor shall review the preliminary FACP system design and shall ensure that
the detector/sensor types. Locations and quantities are suitable and in
accordance with applicable NFPA-70 standards, Saudi Aramco standards and
specifications.
3.3.1 It shall be the VENDOR’s responsibility to calculate and verify with the
-
03-07-18
DATE
3.3.2 All electrical power supply shall conform to NFPA 70 National Electrical Code
00A
00B
NO.
REV
07-MAR-18
DATE: 3.3.5 Fire Detection and Alarm Control Panel shall be with battery back-up of 2 hours
CONSTRUCTION
AGENCY operation.
4.1 VENDORS
DATE:
CONTROL NUMBER
The Fire Detection and Alarm system Control Panel, detectors, notification appliances
VERIFICATION
and portable fire extinguishers shall be provided from any of SAUDI ARAMCO
EDSD
approved vendors.
DATE:
BY:
4.2.1 All materials and equipment furnished by the VENDOR shall be of new, unused
and undamaged condition in strict accordance with the requirements of this
(DCC) NO. _____________________
specification
TECH. SPECIFICATION-FIRE DETECTION & ALARM SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.2.2 Where an alternate VENDOR’s equipment are proposed, the alternate
equipment may be considered, as equal, by SAUDI ARAMCO, if they meet the
ENGG CERT
JRB
JRB
following criteria:
JRB
JRB
4.2.3 VENDOR shall supply all necessary field enclosures/terminal boxes (weather-
proof for indoor use), isolator modules, interface modules, mounting
DESCRIPTION
accessories and other materials required for the complete operation of the
system.
4.3.1 The Fire Detection and Alarm system Control Panel shall be the main
appliance for receiving the automatic fire detector and manual call point
signals, process module to indicate the alarm and trouble conditions in a self-
contained display.
JO/EWO
-
4.3.2 The Fire Detection and Alarm system Control Panel shall be microprocessor
based. Operating programs and configuration data shall be contained in easily
02-05-18
03-07-18
DATE
00B
NO.
REV
4.3.3 The Fire Detection and Alarm system Control Panel, automatic fire detectors
DISCIPLINE
ENGINEER
and manual call points shall be all addressable type and compatible to each
JRB other. In addition to the intelligent/addressable detectors used, it shall be
07-MAR-18
DATE: possible to connect conventional detectors or other shorting devices. When
PROJECT
ENGINEER interface modules are required for such purposes, 20 % spare modules shall be
JVM provided for each type.
07-MAR-18
DATE:
CERTIFIED 4.3.4 It shall be possible to program/configure the complete fire detection network
JRB
and the system with different levels of password protection.
07-MAR-18
DATE:
CONSTRUCTION
AGENCY 4.3.5 Addressing method shall be in such a way that addition of one or a few more
detectors in any zone shall not require re-addressing the remaining detectors or
DATE: shut-down of the system. Provision shall be made to prevent addressing
OPERATIONS duplication.
DATE: 4.3.6 The scanning period of the system shall be in such a way that every detector
CONTROL NUMBER
4.3.7 The analog signals received at the Fire Detection and Alarm system Control
DATE:
BY:
4.3.8 Signaling Line Circuit conductors and devices shall be monitored for integrity
and the panel shall initiate “Trouble Alarm” for Ground Fault, Open Wire, and
(DCC) NO. _____________________
TECH. SPECIFICATION-FIRE DETECTION & ALARM SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.3.9 Zone modules shall be capable of handling Class-A wiring inputs from field
initiating devices.
ENGG CERT
JRB
JRB
4.3.10 Any single open wire or wire shorting shall not generate “Fire Alarm”, but only
JRB
JRB
4.3.11 It shall be possible to adjust the sensitivity and enable/disable alarm functioning
of a particular detector from the Fire Detection and Alarm system Control
ISSUED FOR 90% DESIGN REVIEW
ISSUED FOR 60% DESIGN REVIEW
4.3.12 It shall be possible to disable automatic alarm setting compensation (if provided
as an option) with respect to time (aging compensation).
4.3.13 The Fire Detection and Alarm system Control Panel shall have the ability to
provide automatic warning that a detector has reached a level of contamination,
which requires that it should be replaced or serviced.
4.3.14 The panel shall have both operator interface and annunciator attached to it.
The operator interface and the annunciator shall be as per section 4.4.
JO/EWO
-
4.3.15 Message logging facility shall be provided with at least 300 time-stamped
alarm/ trouble messages in a circular buffer storage which shall be free of
02-05-18
03-07-18
DATE
overflow problem. Each message shall show, but not limited to the source
device ID number, device location, alarm type and level (including device
00A
00B
NO.
REV
DATE: 4.3.19 Twenty percent (20%) spare terminals of all types and VENDOR’s standard
CONTROL NUMBER
4.4.1 Vendor to provide and install fire extinguishers in the Harmaliyah Camp as per
drawing.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00B
TECH. SPECIFICATION-FIRE DETECTION & ALARM SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.5.1 Ionization type smoke detector shall be dual chamber type. The detector shall
have an LED in its base, which is illuminated in a steady “on” mode when in
alarm. Detector reset shall be performed by the control unit reset switch. The
ENGG CERT
JRB
JRB
4.5.2 The design of the ionization detector compensating circuits shall provide stable
operation with regard to minor changes in temperature, humidity and
atmospheric conditions.
ISSUED FOR 90% DESIGN REVIEW
ISSUED FOR 60% DESIGN REVIEW
4.5.3 A special locking screw shall be provided to lock the head to the base. The
head to base connection shall be by use of bifurcated contacts.
DESCRIPTION
4.6.1 The manual pull station shall have a cast metal housing with a dual action
release configuration to prevent accidental system activation. The legend on
the front of the station shall be “PULL TO ACTIVATE” and in Arabic and
English language.
JO/EWO
-
4.6.2 The dual action release configuration shall be of a lift then pull action type.
02-05-18
03-07-18
DATE
4.6.3 The device shall require the use of a key common to the pull stations to reset
after operation to prevent unauthorized access.
00A
00B
NO.
REV
DISCIPLINE
ENGINEER
4.6.4 The device shall be U.L. listed or F.M. approved.
JRB
07-MAR-18
DATE: 4.7 ALARM BELLS/HORNS/SOUNDERS
PROJECT
ENGINEER
JVM 4.7.1 The vibrating alarm bell/horn shall be approved for use with the control system.
07-MAR-18
DATE:
CERTIFIED 4.7.2 The polarized alarm bell/horn shall be rated at 24 VDC and shall contain a
JRB
series diode for use in supervised systems.
07-MAR-18
DATE:
CONSTRUCTION
AGENCY 4.7.3 The alarm bell shall have a dB level of 86-98 and horn shall have a dB level of
101 at a distance of 3 m.
DATE:
OPERATIONS 4.7.4 Where audible appliances are installed to provide signals for sleeping areas,
they shall have a sound level of at least 15 dB above the average ambient
DATE: sound level or 5 dB above the maximum sound level having a duration of at
CONTROL NUMBER
measured at the pillow level in the area required to be Served by the system
EDSD
4.7.5 The bell shall be constructed with materials of quality to ensure reliability and
long life and have a baked red enamel finish.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00B
4.7.6 The sounder shall be approved for use with the control systems.
(DCC) NO. _____________________
TECH. SPECIFICATION-FIRE DETECTION & ALARM SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.7.7 The sounder shall be low current with high output dB level up to 100 dB
JRB
4.8.1 The strobes shall be approved for use with the control systems.
4.8.2 Alarm (strobe) light shall provide visual indication of alarm situation or as a
ISSUED FOR 90% DESIGN REVIEW
ISSUED FOR 60% DESIGN REVIEW
visual supplement to an audible alarm device. The strobe light shall be rated at
24 VDC and have a current draw of no more than 0.42 Amps.
DESCRIPTION
4.8.3 The lamp shall be protected by a white translucent LEXAN lens, with the word
(FIRE) imprinted in red letters.
4.8.4 The strobe shall be polarized and powered from the control unit.
4.8.5 The strobe shall have a minimum flash rate of 1 flash per second.
5.0 INSTALLATION
-
VENDOR shall provide all materials required to set up, mount and connect all system
02-05-18
03-07-18
DATE
00B
NO.
REV
miscellaneous items that formed part of Harmaliyah Camp Khuff Gas Project Fire
DISCIPLINE Detection and Alarm system.
ENGINEER
JRB
DATE:
07-MAR-18 The electrical installation shall comply with the requirements of the National Electrical
PROJECT
ENGINEER
Code (NEC).
JVM
DATE:
07-MAR-18 Electrical equipment shall conform to the standards of IEEE and ANSI.
CERTIFIED
JRB
07-MAR-18
DATE: 6.0 TEST AND INSPECTION
CONSTRUCTION
AGENCY
6.1 FACTORY TESTING AND INSPECTION
DATE:
OPERATIONS All items manufactured to this Specification are subject to verification by SAUDI
ARAMCO in accordance with the inspection requirements of associated SAUDI
DATE:
ARAMCO Material System Specifications.
CONTROL NUMBER
VERIFICATION
6.2.1 All tests, adjustments and preliminary operation shall be done under the
DATE:
BY:
6.2.2 The acceptance tests shall be carried out in the presence of SAUDI ARAMCO
of his authorized representative. The tests shall include a check and
(DCC) NO. _____________________
TECH. SPECIFICATION-FIRE DETECTION & ALARM SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
shutdowns, alarms and all operating parts of the system.
6.2.3 During testing, NFPA 72 Chapter 10, Inspection, Testing and Maintenance
ENGG CERT
JRB
JRB
6.2.4 The VENDOR shall submit all test procedures to the SAUDI ARAMCO for
review 45 days prior to start of the work.
6.2.5 Inspection and testing shall meet the requirements of Form A175-343500,
ISSUED FOR 90% DESIGN REVIEW
ISSUED FOR 60% DESIGN REVIEW
6.2.6 If these tests do not show conformance with process quantities, the VENDOR
shall take whatever remedial steps are necessary.
6.2.7 Retests shall be undertaken until the system is modified to a point where it
conforms to the specification. All expenses for retest and remedial steps shall
be at VENDOR’s account at no cost to SAUDI ARAMCO.
6.2.8 Fire Detection and Alarm systems shall be commissioned as per the guidelines
of SAES-B-14, section 7.9.
JO/EWO
-
7.0 DOCUMENTATION
02-05-18
03-07-18
DATE
00B
NO.
REV
07-MAR-18
DATE: c) Certified installation diagrams showing the items to be field-installed and
CONSTRUCTION
AGENCY their identification numbers.
f) Performance Curves.
VERIFICATION
EDSD
h) All VENDOR drawings shall be prepared using Intergraph Micro station and
shall conform to standards and procedures set forth in the SAUDI ARAMCO
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00B
TECH. SPECIFICATION-FIRE DETECTION & ALARM SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.1.2 Certified Drawings, Literature and Photographs
ENGG CERT
JRB
JRB
below:
Certificates, etc.
03-07-18
00B
NO.
REV
DISCIPLINE b) Store Fire Detection and Alarm system equipment in clean, dry place. Protect
ENGINEER
JRB from weather, dirt, fumes, water, construction debris, and physical damage.
07-MAR-18
DATE:
PROJECT
ENGINEER
JVM
07-MAR-18
DATE:
CERTIFIED
JRB
07-MAR-18
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00B