Reference Drawings: Saudi Arabian Oil Company
Reference Drawings: Saudi Arabian Oil Company
Reference Drawings: Saudi Arabian Oil Company
SAUDIARAMCO.
1.ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
OTHERWISE NOTED.
OF
4. FOR CATHODIC PROTECTION CABLE MARKER AND ANODE
CONSENT
MARKER PLATE INSTALLATION SEE SAUDI ARAMCO
STANDARD DRAWING AB-036351.
TTEN
STANDARD DRAWING AA-036675.
WRI
6. ALL BURIED GROUND CABLES ARE INSULATED
(JACKETED).
THE
7. TEST STATIONS AND ANODES SHALL BE OFFSET
A FROM ROAD CENTERLINES IN ACCORDANCE WITH
THOUT
SAUDI ARAMCO STANDARDS.
068
8. INSTALLATION OF CATHODIC PROTECTION TEST
ANCHOR
19+262.
WI
INSULATING GASKET STATIONS AND JUNCTION BOXES SHALL BE IN
ACCORDANCE WITH STANDARD DRAWING AA-036352,
NG
DRAWI
AB-036907 AND AB-036540.
DRAG
ACCESS PLATFORM
STA
M
A 9. INSTALLATION OF GALVANIC ANODES FOR ROAD AND
TOP EL 1.150 T
C
2500 H CAMEL PIPELINE CROSSINGS SHOULD BE IN
L
I
S
1200
N
THI
ACCORDANCE WITH STANDARD DRAWING AA-036352.
(PROVISION FOR S E
E
E ST
TEMPORARY SCRAPER) PROPOSED 20" CS DISCH. P/L ( WEST FLANK)
10. INSTALLATION OF GALVANIC ANODES AT ISOLATION
D A
X
VS
W
FROM
G 20 CASING ROAD CROSSING SHOULD BE IN ACCORDANCE
.P +
B 05 WITH STANDARD DRAWING AA-036352.
20" BA VA STA 21+122.561 -3 0
4 .0
N
A/G U/G 0 11. FOR BONDING DETAILS REFER TO AA-036674.
NED
CLASS 1500# END OF 20" DISCH. HEADER 0 0
2
0
8
0 F
7
(WEST FLANK @ ABQQ-314 6
OBTAI
0 OR
8
. 12. FOR DETAILS OF CABLE CONNECTIONS TO PIPELINES
6
15
0
N 2 879 147.469
0
C AND STRUCTURES REFER TO AB-036381.
E 370 175.091 O
N
T
.
BE
.19
28
+2
20
A
ST
PART,SHALL
3
7 .05
T-2 222
P 8 0
87 0. 44
N
2 82
69
3
E T
SE
ING
TH
0
N
0 0
N
4 0
2
0 0
2
8
7 7
8
7
3 6 TA
7
3 REFERENCE DRAWINGS
9
DA
9
N
E
0
27
I
4
0
E
0
RV
0
0
CU
DWG. CONTROL FOR J.O.10-01883-0001 PD-100001
FULL,OR
'15"
°50
8
=5 0m
CP DETAIL DRAWING PB-320003.001
} 00
N
10.
=2 0m
2
R 42 PLAN AND PROFILE PB-540008.016
ROAD
8.
8
1
=1
7
1m
65
8
T
5.
6
1
=2
N
STA 21+122.561 L
I
T
MRL
ON
NG LI
REPRODUCTI
T
N 2 879 350.963
E 370 366.051
ROW
DRAWI
X
X
X
20"
(PROVISION FOR
B2
49
TEMPORARY SCRAPER)
1
LEGEND
ANCHOR
84
SAUDIARAMCO.NO
21+166.
. 7
43 7 9.68
+4 -2 76
20 PI
A. 8 57
2
ST 9 87 0.
7 6.03 2 82
-2 85
N
6 9
PC 8 6 3 T
87 160
. E SE
2 90 NG
DRAG
N I
69 TH
3 NO
STA
T B2 BONDING STATION
E SE
HING
T
NO
N
T TEST STATION WITH
2
N
N
KILOMETER READING
8
N
7
2
0 0 0
2
0
8
2
0 0
8
0 0
8
4 2
8
8
7
0
0 0 9
7
9
OF
9
0
7 7 6
9
4
0
3 3 3
2
3
0
0
0
0
0
E E E E
0
PROPERTY
SOLE
FOR CATHODIC PROTECTION
THE
DETAILS OF VALVE STATION,
ARE
FACILITIES SEE SA
0 25 50 75 100 125 150 175 200 225 250
DWG. NO. PB-320003
N
METERS
HEREI
SCALE: 1:2500M
NED
REVISION VALIDATION
CONTAI
THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
10-01883-0001-001
ON
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
NFORMATI
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
KMS HFA
01/15/18 01/15/18
I
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-01883-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
CAT
DRAWI
20" U/G DISCH. P/L (WEST FLANK)
GOSP-5
S
THI
ABQAIQ SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.