5140520-0000-SPC-TE-0205 Rev 01B

Download as pdf or txt
Download as pdf or txt
You are on page 1of 21
At a glance
Powered by AI
The document outlines specifications for a telephone system package for pipeline projects in the Western Region of Saudi Arabia.

The document provides specifications for the design, installation and commissioning of an analog telephone system.

The main components described are analog telephones, their technical requirements, and a general system description.

EDSD REV

REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
01B

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________ BI-10-
OF THIS DRAWING IS COVERED, FOR ALL
01A 08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION GKR DSN MAH FAG
CONTROL NUMBER

DSN

FAG
GKR

MAH
BI-10-

DSN
APPROVAL/CERTIFICATION REQUIREMENTS, 01B 08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION GKR DSN MAH FAG

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED

OPERATIONS
08 APR 19
08 APR 19

CONSTRUCTION
08 APR 19
(DCC) NO. _____________________ DATE:

YANBU
Saudi Aramco 2616-ENG (03/99)

5140520-0000-SPC-TE-205 Rev 01B


PACKAGE - 1 (WESTERN REGION)
SPECIFICATION FOR TELEPHONE SYSTEM

EWG-2 PIPELINE / RBFG-1 PIPELINE


SAUDI ARABIA
DOC

JO:
F99/K94
PACKAGE 1

DWG.TYPE PLANT NO. INDEX


PHASE II PIPELINE

WESTERN REGION
SAUDI ARABIAN OIL COMPANY

CONTRACT NO: 10-01810-0002

TE-0205
DRAWING NO.

BI-10-01810-0002
T 5140520-0000-SPC-
MASTER GAS SYSTEM EXPANSION

21
OF
ISSUED FOR CONSTRUCTION

SHT.NO.
SPECIFICATION FOR TELEPHONE SYSTEM

REV.NO.

01B
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

TABLE OF CONTENTS
ENGG CERT

1. INTRODUCTION 3
GKR
GKR

1.1. Project Overview 3


1.2. Project Scope 4
2. DOCUMENT OBJECTIVE 4
2.1. Description of the Facilities 4
2.2. Locations 6
DESCRIPTION

3. DEFINITIONS 6
08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

4. ORDER OF PRECEDENCE 7
5. SPECIFICATIONS, STANDARDS AND CODES 7
5.1. Saudi Aramco Documents 7
5.2. International Codes & Standards 10
5.3. Project Specifications & Drawings 12
5.4. Conflicts and Deviations 12
JO/EWO
BI-10-

BI-10-

6. ABBREVIATIONS AND ACRONYMS 12


7. TELEPHONE SYSTEM 15
DATE

7.1. General Description 15


01B
01A
NO.
REV

7.2. Analog Telephone 16


DISCIPLINE
ENGINEER
7.3. Technical Requirements for Analog Telephones 16
GKR
08 APR 19
8. INSPECTION, TESTING AND COMMISSIONING 18
DATE:
PROJECT
ENGINEER
8.1. Inspection 19
DSN
8.2. Integrated Factory Acceptance Testing 19
08 APR 19
DATE:
CERTIFIED 8.3. Site Acceptance Testing 19
DSN
8.4. Pre-Commissioning and Commissioning 20
08 APR 19
DATE:
CONSTRUCTION 9. MAINTENANCE AND SPARES 20
AGENCY
MAH 9.1. Maintenance 20
DATE:
9.2. System Spares 21
OPERATIONS
FAG 10. TRAINING 21
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

(DCC) NO. _____________________

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


2
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

1. INTRODUCTION
ENGG CERT

1.1. Project Overview


GKR
GKR

Saudi Aramco operates the world’s largest single hydrocarbon network, the Master
Gas System (MGS). The MGS is a gas gathering and processing system built in the
mid-1970s, and has been the backbone of the country's industrial network since the
system’s completion in 1982. The MGS enables Saudi Aramco to use or market
nearly all the gas associated with oil production and all non-associated gas produced
from deep gas reservoirs.
DESCRIPTION

08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION


08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION
JO/EWO
BI-10-

BI-10-
DATE

01B
01A
NO.
REV

DISCIPLINE
ENGINEER
GKR
08 APR 19
DATE:
PROJECT
ENGINEER
DSN
08 APR 19
DATE:
CERTIFIED
DSN

08 APR 19 Figure 1.1 West, Central & East Pipeline Facilities


DATE:
CONSTRUCTION
AGENCY
MAH

DATE:
OPERATIONS
FAG

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

(DCC) NO. _____________________

Fig 1.2: Geographical View of West, Central & East Pipeline Facilities

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


3
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

The purpose of the expansion facilities is to meet increased demand along the
ENGG CERT

Eastern Region and out to the Central and Western Regions of Saudi Arabia by
providing 9.6 BSCFD of gas by 2016 (3rd Quarter) and then 12.538 BSCFD of gas by
GKR
GKR

2020 (Phase II) through the installation of new pipelines and Booster Gas Compressor
Stations (BGCS). These facilities will be sized to ensure sufficient pipeline capacity
and pressure to maintain the reliability of the MGS by providing an eight-hour survival
time for all sales gas customers

1.2. Project Scope


DESCRIPTION

CONSULTANT scope within the Master Gas System Expansion Phase II Pipelines
08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION

Project includes design and engineering, procurement support and construction


08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

support as below:

 Detailed Design services for Packages 1 and construction engineering


support;
 Project Management support for the execution of the contract through the
entire project life cycle from Feed Verification through the design phase to the
production of AFC deliverables, procurement, construction and commissioning
JO/EWO

through to handover;
BI-10-

BI-10-

 Supply Chain services to support sub-contractor management and


DATE

procurement of materials.

2. DOCUMENT OBJECTIVE
01B
01A
NO.
REV

DISCIPLINE
ENGINEER This document defines the Telephone Specification for the Package-1 (Western
GKR
Region) of EPC Phase of the MGS Expansion – Phase II Project.
08 APR 19
DATE:
PROJECT
ENGINEER 2.1. Description of the Facilities
DSN

DATE:
08 APR 19 The communication facilities required under this package are summarize below:
CERTIFIED
DSN EWG-2 Pipeline
08 APR 19
DATE:  New 56” diameter externally coated Carbon Steel pipeline, about 422 Km long,
CONSTRUCTION
AGENCY from EWPS#7 to EWPS#11 and shall install a total approx. of 31,500 meters
MAH of 24-core ITU-T G.655E FOC cable to connect various RTUs and LDS to the
DATE: Communication Building for the LDS/SCADA data and telephone systems
OPERATIONS requirements. Final cable quantity shall be as per Telecom Cable Schedule –
FAG Package 1;
DATE:
 4 nos. of Scrapper Launcher;
CONTROL NUMBER
VERIFICATION

 4 nos. of Scrapper Receivers;


EDSD

 15 nos. of Gas Operated valve stations;


DATE:
BY:

 4 nos. of Motorized Operated Valve Stations


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

 12 nos. of new Burn pit;


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

(DCC) NO. _____________________

 22 nos. of new RTU shelter (Communication connectivity only);

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


4
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

 6 nos of new Cathodic Protection System (Communication connectivity only,);


ENGG CERT

 22 nos. of new Leak Detection System (LDS) shelter (Communication


connectivity only);
GKR
GKR

 2 nos. of New Master server for LDS in EWG-2 P/L, EWPS-7 & EWPS-11;
 Communications links between the new field RTUs to be constructed at
different Valve Station sites and Scrapper Launcher/Receivers along the
pipeline and the existing SCADA System at OSPAS OCC/CDC in Dhahran;
 Communication integration to existing Saudi Aramco backbone network by
DESCRIPTION

OTN and Fiber Optic Cables;


08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

 Analog Telephone sets at each new RTU to be connected to the existing


Saudi Aramco telephone network;
 Communication links between new CP stations along the pipeline to central
CP monitoring in Dhahran and Abqaiq CP server.
 The pipelines facilities intended by this project shall be monitored and
controlled from the OSPAS Operations Coordination Center (OCC) in
Dhahran. The OCC SCADA system shall gather the information from the field
JO/EWO
BI-10-

BI-10-

Remote Terminal Units (RTU) in the new and existing pipeline corridors and
from the additional RTUs to be installed by the project;
DATE

 Communication links for temporary communication services required during


the construction shall be provided by this project;
01B
01A
NO.
REV

 The project shall supply power to the new telecommunication equipment from
DISCIPLINE
ENGINEER existing sources. Where power is unavailable for the RTU’s located at the
GKR
Valve Stations, solar power shall be used.
08 APR 19
DATE:
PROJECT
ENGINEER
 Any other facilities to meet the Overall project objective.
DSN
RBFG-1 Pipeline
08 APR 19
DATE:
CERTIFIED  New 24” diameter pipeline about 6.8 km long (KM 134 of EWRBG-1 to Petro-
DSN
Rabigh / LIP) and shall install a total approx. of 7,500 meters of 48-core ITU-T
DATE:
08 APR 19
G.655E FOC cable to connect the RTUs and LDS to Communication Building
CONSTRUCTION
AGENCY
for the LDS/SCADA data and telephone systems requirements. Final cable
MAH quantity shall be as per Telecom Cable Schedule – Package-1
DATE:
OPERATIONS
 1 no. of Scrapper Launcher;
FAG  1 no. of Scrapper Receiver
DATE:
 1 no. new cold vent at BPFS skid top;
CONTROL NUMBER
VERIFICATION

 1 no. of new RTU (Communication connectivity only);


EDSD

 1 no. of new Leak Detection System (LDS) (Communication connectivity only);


DATE:
BY:

 1 no. of new CP System (Communication connectivity only);


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

 Communication Hook-up with existing F99-RTU-030 Shelter;


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

(DCC) NO. _____________________

 Communication integration to existing Saudi Aramco backbone network by


OTN and Fiber Optic Cables;

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


5
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

 Analog Telephone sets at each new RTU to be connected to the existing


ENGG CERT

Saudi Aramco telephone network;


 Communication links between new CP stations along the pipeline to central
GKR
GKR

CP monitoring in Dhahran and Abqaiq CP server.


 The pipelines facilities intended by this project shall be monitored and
controlled from the OSPAS Operations Coordination Center (OCC) in
Dhahran. The OCC SCADA system shall gather the information from the field
Remote Terminal Units (RTU) in the new and existing pipeline corridors and
from the additional RTUs to be installed by the project;
DESCRIPTION

Communication links for temporary communication services required during


08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION


08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

the construction shall be provided by this project;


 The project shall supply power to the new telecommunication equipment from
existing sources. Where power is unavailable for the RTU’s located at the
Valve Stations, solar power shall be used.
 Any other facilities to meet the Overall project objective.

2.2. Locations
JO/EWO
BI-10-

BI-10-

The EWG-2 & RBFG-1 pipelines are located in the Western Region pipeline corridor.
The current scope of work for the Package 1 (Western Region) as shown in Fig. 1.1
DATE

West, Central & East Pipeline Facilities.


01B
01A
NO.
REV

3. DEFINITIONS
DISCIPLINE
ENGINEER
GKR COMPANY : SAUDI ARAMCO organization (ARAMCO Services
DATE:
08 APR 19 COMPANY, ARAMCO Overseas COMPANY, SAUDI
PROJECT
ENGINEER
ARAMCO)
DSN
08 APR 19 CONTRACTOR : Saudi KAD
DATE:
CERTIFIED
DSN Operating Facilities : The equipment within an operational area
08 APR 19
DATE:
CONSTRUCTION Project : Master Gas System Expansion Project Phase II
AGENCY
MAH
TSI (Telecom : Means the Party (Parties) which manufactures and/or
DATE: System Integrator) supplies materials, equipment, technical documents or
OPERATIONS
drawings and/or services to perform the duties specified
FAG
by the COMPANY/CONTRACTOR.
DATE:
CONTROL NUMBER

VENDOR : The COMPANY providing the System / Equipment to


VERIFICATION

which this specification is applicable


EDSD

Includes : ‘includes but not limited to’


DATE:
BY:
REVISIONCERTIFICATION

‘Shall’ & ‘Must’ : Used in the imperative sense


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

Will : Used in the preferred sense


(DCC) NO. _____________________

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


6
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

The Job Specification contains language which could imply that certain standards,
ENGG CERT

specifications and practices are discretionary. Where the words such as "will", "may"
or "should" appear in the Job Specification, these shall mean and be interpreted as
GKR
GKR

shall" by VENDOR.

4. ORDER OF PRECEDENCE
The design should be performed in compliance with Saudi Aramco Desktop
Standards unless appropriate waivers obtained. Current Industry and regulatory
bodies’ standards should be used in the absence of applicable Saudi Aramco
Standards. In all cases, such usage shall be subject to prior approval by Saudi
DESCRIPTION

Aramco.
08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

In case of conflict between the documents provided by Company, the conflict will be
resolved in accordance with the following order of precedence.
i. Project Scope of Work / Material Requisition / Bid Documents;
ii. Other Project Drawings and Documents;
iii. COMPANY-provided Waivers;
iv. SAUDI ARAMCO Engineering Standards (SAES);
JO/EWO
BI-10-

BI-10-

v. SAUDI ARAMCO Material System Specifications (SAMSS)


vi. SAUDI ARAMCO Standard Drawings;
DATE

vii. SAUDI ARAMCO Engineering Procedures (SAEP);


01B
01A
NO.
REV

viii. Other drawings, specifications or standards referenced in this Contract. lf the


DISCIPLINE
ENGINEER conflict is between or within the documents in this Paragraph, the most
GKR
stringent drawing, specification or standard shall control.
08 APR 19
DATE:
PROJECT Note: The lists provided in Section 5 of this document are intended to highlight
ENGINEER
DSN
significant standards. These lists are for reference only and do not limit the obligation
08 APR 19 for compliance by the Suppliers/ VENDORs / Sub Contractors who should be guided
DATE:
CERTIFIED by the entire set of Standards and Specifications referred to above.
DSN

DATE:
08 APR 19 5. SPECIFICATIONS, STANDARDS AND CODES
CONSTRUCTION
AGENCY The following key specifications and standards are applicable. Refer to the Project
MAH
Specifications for detailed specification, drawing, code and standard requirements.
DATE:
OPERATIONS 5.1. Saudi Aramco Documents
FAG

DATE:
Ref. Document Number Title
CONTROL NUMBER
VERIFICATION

Saudi Aramco Engineering Standards


EDSD

DATE:

/1/ SAES-A-202 Saudi Aramco Engineering Drawing Preparation


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

/2/ SAES-B-068 Electrical Area Classification


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

(DCC) NO. _____________________

/3/ SAES-L-450 Construction On-Land and Near-Shore Pipelines

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


7
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

Ref. Document Number Title


ENGG CERT

/4/ SAES-P-100 Basic Power System Design Criteria


GKR
GKR

/5/ SAES-P-104 Wiring Methods and Materials

/6/ SAES-P-111 Grounding

Telecommunications - Symbols, Abbreviations and


/7/ SAES-T-018
Definitions
DESCRIPTION

08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION


08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

/8/ SAES-T-151 Communication D.C. Power System

/9/ SAES-T-795 Communications Facility Grounding Systems

/10/ SAES-T-916 Telecommunications Building Cable Systems

/11/ SAES-Z-010 Process Automation Networks


JO/EWO

Design and Installation of Fiber Optic Cable Systems for


BI-10-

BI-10-

/12/ SAES-Z-020
Process Control Networks
DATE

Saudi Aramco Best Practice


01B
01A
NO.
REV

/13/ SABP-P-013 Electrical Design in Hazardous (Classified) Areas


DISCIPLINE
ENGINEER
GKR Proactive Monitoring and Alerting Solution for Plant
/14/ SABP-T-001
DATE:
08 APR 19 Network and Systems
PROJECT
ENGINEER
DSN /15/ SABP-T-002 Plant Systems Antivirus Protection
08 APR 19
DATE:
CERTIFIED /16/ SABP-T-007 VoIP Security Best Practices
DSN

DATE:
08 APR 19
Saudi Aramco Engineering Procedures
CONSTRUCTION
AGENCY
MAH /17/ SAEP-99 Process Automation Networks & Systems Security
DATE:
OPERATIONS /18/ SAEP-127 Security & Control of Saudi Aramco Engineering Data
FAG

Instructions for the Development of "Regulated


DATE: /19/ SAEP-133
VENDORs List" Engineering Standards
CONTROL NUMBER
VERIFICATION
EDSD

Instructions for Establishing and Maintaining Mandatory


/20/ SAEP-301
Saudi Aramco Engineering Requirements
DATE:
BY:

Instructions for Obtaining a Waiver of a Mandatory Saudi


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

/21/ SAEP-302
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Aramco Engineering Requirement


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

(DCC) NO. _____________________

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


8
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

Ref. Document Number Title


ENGG CERT

Retrieval, Certification and Submittal of Saudi Aramco


GKR
GKR

/22/ SAEP-334
Engineering and VENDOR Drawings

/23/ SAEP-381 Project Quality Issues Escalation Process

/24/ SAEP-1150 Inspection coverage on projects

/25/ SAEP-1154 Guidelines for Contractors Quality Plan


DESCRIPTION

08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION


08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

Inspection Requirements For Contractor Procured


/26/ SAEP-1151
Materials And Equipment

/27/ SAEP-1610 Preparation of Functional Specification Documents

/28/ SAEP-1624 Preparation of System Design Documents

/29/ SAEP-1628 Preparation of Integration Specifications Document


JO/EWO
BI-10-

BI-10-

/30/ SAEP-1630 Preparation of Integration Test Procedure Document


DATE

/31/ SAEP-1634 Factory Acceptance Test


01B
01A
NO.
REV

/32/ SAEP-1636 Installation and Checkout Plan


DISCIPLINE
ENGINEER
GKR /33/ SAEP-1638 Site Acceptance Test Plan
08 APR 19
DATE:
PROJECT Equipment and Spare Parts Data Requirements for
ENGINEER /34/ SAEP-3101
DSN Contractor Procured Equipment
08 APR 19
DATE:
CERTIFIED Saudi Aramco Engineering Report
DSN

08 APR 19
DATE:
CONSTRUCTION
/35/ SAER-1972 Saudi Aramco Materials Inspection and Testing
AGENCY
MAH

DATE:
/36/ SAER-6123 Process Automation Networks Firewall Evaluation Criteria
OPERATIONS
FAG Saudi Aramco Materials System Specifications
DATE:
CONTROL NUMBER

Outside Plant Fiber Optic Cable Specifications (Single


VERIFICATION

/37/ 18-SAMSS-625
mode & Multimode)
EDSD

DATE:

/38/ 34-SAMSS-820 Instrument Control Cabinets - Indoor


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

/39/ 34-SAMSS-821 Instrument Control Cabinets - Outdoor


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

(DCC) NO. _____________________

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


9
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

Ref. Document Number Title


ENGG CERT

GKR
GKR

Saudi Aramco Standard Drawings

Equipment Grounding System For Telecommunication


/40/ AA-036391-001
Facilities

5.2. International Codes & Standards


DESCRIPTION

08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION


08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

Ref. Document Number Title

/41/ ANSI American National Standards Institute

Building Industry consulting services International –


/42/ BICSI-TDMM Telecommunication Distribution Methods Manual, 12th
Edition, 2009
JO/EWO
BI-10-

BI-10-

Commercial Building Telecommunications Cabling


/43/ EIA/TIA-568-B
Standard
DATE

Commercial Building Standard for Telecommunications


/44/ EIA/TIA-569-B
Pathway and Spaces
01B
01A
NO.
REV

DISCIPLINE
ENGINEER Administrative Standard for the Telecommunications
/45/ EIA/TIA-606
GKR
Infrastructure of Commercial Buildings
08 APR 19
DATE:
PROJECT
ENGINEER Commercial Building Grounding and Bonding
/46/ EIA/TIA-607
DSN Requirements for Telecommunications
08 APR 19
DATE:
CERTIFIED
Customer-Owned Outside Plant Telecommunications
DSN /47/ EIA/TIA-758
Standard
08 APR 19
DATE:
CONSTRUCTION
AGENCY /48/ IEC 60079 Electrical Apparatus for explosive gas atmosphere
MAH

DATE:
OPERATIONS /49/ IEC 60529 Degrees of protection Provided by Enclosures (IP Code)
FAG

DATE:
/50/ IEC 60617 Graphical Symbols for Diagrams
CONTROL NUMBER
VERIFICATION
EDSD

Electromagnetic compatibility for industrial - process


/51/ IEC 60801 measurement and control equipment - radiated
DATE:
BY:

electromagnetic field requirements


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

Tele control Equipment and System Operating Conditions


/52/ IEC 60870-2-1
- Power supply and electromagnetic compatibility
(DCC) NO. _____________________

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


10
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

Ref. Document Number Title


ENGG CERT

/53/ IEC 61000 Electromagnetic compatibility (EMC)


GKR
GKR

Degrees of protection provided by enclosures for electrical


/54/ IEC 62262
equipment against external mechanical impact (IK Code)

IEEE Recommended Practice and Requirements for


/55/ IEEE 519
Harmonic control in Electrical Power System
DESCRIPTION

/56/ NFPA 70 National Electrical Code (NEC)


08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

Standard for Purged and Pressurized Enclosures for


/57/ NFPA 496
Electrical Equipment

/58/ NEC Article 505 National Electrical Code: Zone Locations

/59/ IEEE 802.1D Spanning tree protocol


JO/EWO
BI-10-

BI-10-

/60/ IEEE 802.1P QoS tagging and port-based priority


DATE

/61/ IEEE 802.1Q Frame tagging and VLAN Trunking


01B
01A
NO.
REV

/62/ IEEE 802.1w Rapid Spanning Tree Protocol


DISCIPLINE
ENGINEER
GKR
/63/ IEEE 802.1X Standard for port-based Network Access Control
08 APR 19
DATE:
PROJECT
ENGINEER
DSN
/64/ IEEE 802.3 Ethernet group
08 APR 19
DATE:
CERTIFIED /65/ IEEE 802.3u Fast Ethernet
DSN

08 APR 19
DATE: /66/ IEEE 802.3z Gigabit Ethernet (fiber-based)
CONSTRUCTION
AGENCY
MAH
Gigabit Ethernet (copper-based; unshielded twisted pair
/67/ IEEE 802.3ab
DATE: category 6 cabling)
OPERATIONS
FAG
EN 61000-6-2 & - This specification defines electromagnetic characteristics
/68/
DATE: 4 for interference immunity
CONTROL NUMBER
VERIFICATION

FCC Part
EDSD

/69/ This specification defines radio interference level


15(Class A)
DATE:
BY:

ITU-T These specifications define the transmission media


/70/
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

G.652/653/655 characteristics of optical fiber cables


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

(DCC) NO. _____________________

This international standard defines ingress protection IP


/71/ IEC 60529
rating

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


11
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

5.3. Project Specifications & Drawings


ENGG CERT

Ref. Document Number Title


GKR
GKR

5140520-0000-BOD-
/72/ Telecommunication Basis Of Design Package-1
TE-0203

5140520-0000-SOW- Scope of Work – Telecommunication System


/73/
TE-0204 Integrator – Package-1
DESCRIPTION

K94-T-XA-141881.001- Overall Data Network Diagram (RTU, LDS & Tel.


08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

/74/
003 System) – EWG-2 Pipeline

K94-T-XA-141884.001- Logical Data Network Diagram (RTU & LDS


/75/
004 System) – EWG-2 Pipeline

K94-T-XA-141888.001- Voice Connectivity Diagram (Telephone System) –


/76/
004 EWG-2 Pipeline
JO/EWO
BI-10-

BI-10-

K94-T-XA-141893.001-
/77/ Overall FOC Schematic Diagram - EWG-2 Pipeline
004
DATE

Overall Data Network Diagram (RTU, LDS & Tel.


/78/ F99-T-XA-141927.001
System) – RBFG-1 Pipeline
01B
01A
NO.
REV

DISCIPLINE
Logical Data Network Diagram (RTU & LDS
ENGINEER /79/ F99-T-XA-141928.001
GKR System) – RBFG-1 Pipeline
08 APR 19
DATE:
PROJECT
ENGINEER Voice Connectivity Diagram (Telephone System) –
/80/ F99-T-XA-141929.001
DSN RBFG-1 Pipeline
08 APR 19
DATE:
CERTIFIED Overall FOC Schematic Diagram - RBFG-1
DSN /81/ F99-T-XA-141930.001
Pipeline
08 APR 19
DATE:
CONSTRUCTION
AGENCY
MAH
5.4. Conflicts and Deviations
DATE:
Any Conflicts / Deviations, shall be brought by the Equipment / Telecommunication
OPERATIONS
VENDOR to the attention of the COMPANY \ CONTRACTOR at the time of submitting
FAG
quotation and obtain the resolution prior to placing of orders.
DATE:
If any inconsistency or conflict exists between this specification and other COMPANY
CONTROL NUMBER
VERIFICATION

documents, industry standards or drawings, this must be brought to the attention of


EDSD

CONTRACTOR / COMPANY in writing within 60 days of award of Contract.


CONTRACTOR / COMPANY shall resolve the inconsistence / conflict in writing.
DATE:
BY:

Deviation from the standards as listed shall not be permitted unless approved by
COMPANY.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

6. ABBREVIATIONS AND ACRONYMS


(DCC) NO. _____________________

ANSI American National Standards Institute

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


12
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

AWG American Wire Gauge


ENGG CERT

BPFS Black Powder Filtration System


GKR
GKR

BSCFD Billion Standard Cubic Feet per Day


BGCS Booster Gas Compression Station
BICSI Building Industry Consulting Service International
BP Bulk Plant
CAT Category
DESCRIPTION

CDC Computer Data Center


08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

dB Decibels
DC Direct Current
DCC Disaster Control Centre
DCO Digital Central Office
EIA Electronic Industries Alliance
JO/EWO

EW East West
BI-10-

BI-10-

EWG East West Gas


DATE

ETH Ethernet
EWOCC East-West Operations Control Centre
01B
01A
NO.
REV

DISCIPLINE EWPS East West Pumping Station


ENGINEER
GKR E1 European Standard 2Mbps link
08 APR 19
DATE:
PROJECT
FAT Factory Acceptance Test
ENGINEER
DSN FOC Fibre Optic Cable
08 APR 19
DATE:
CERTIFIED
FOPP Fibre Optic Patch Panels
DSN
FXS Foreign eXchange Subscriber
08 APR 19
DATE:
CONSTRUCTION
Gbps Giga Bits Per Second
AGENCY
MAH IEC International Electrotechnical Commission
DATE:
OPERATIONS
IEEE Institute of Electrical and Electronics Engineers
FAG IFAT Integrated Factory Acceptance Test
DATE: IP Internet Protocol
CONTROL NUMBER
VERIFICATION

IS std. Intrinsically Safe Standard


EDSD

IT Information Technology
DATE:
BY:

ITU International telecommunication Union


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

KM Kilometer
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

LAG Line Access Gateway


(DCC) NO. _____________________

LAN Local Area Network

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


13
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

LDS Leak Detection System


ENGG CERT

MAC Media Access Control


GKR
GKR

Mbps Mega Bits Per Second


MGS Master Gas System
MPLS Multi-Protocol Label Switching
MTBF Mean Time Between Failure
MTTR Mean Time To Repair
DESCRIPTION

NEC National Electric Code


08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

NFPA National Fire Protection Association


NRBP North Riyadh Bulk Plant
OCC Operation Coordination Center
OSPAS Oil Supply Planning and Scheduling Dept.
OTN Open Transport Network
JO/EWO

PI/Pi Plant Information


BI-10-

BI-10-

P/L Pipeline
DATE

PSU Power Supply Unit


PVC Poly Vinyl Chloride
01B
01A
NO.
REV

DISCIPLINE RTU Remote Terminal Unit


ENGINEER
GKR SAES Saudi Aramco Engineering Standards
08 APR 19
DATE:
PROJECT
SAEP Saudi Aramco Engineering Procedures
ENGINEER
DSN SAT Site Acceptance Test
08 APR 19
DATE:
CERTIFIED
SAMSS Saudi Aramco Material Systems Specifications
DSN
SC Snap-in Connector
08 APR 19
DATE:
CONSTRUCTION
SCADA Supervisory Control and Data Acquisition
AGENCY
MAH SFP Small Form-Factor Pluggable
DATE:
OPERATIONS
SI International Systems Unit
FAG SM Single Mode
DATE: SRG Shedgum Riyadh Gas
CONTROL NUMBER
VERIFICATION

TDMM Telecoms Distribution Methods Manual


EDSD

TIA Telecommunications Industry Association


DATE:
BY:

UL Underwriters Laboratories
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

UTP Unshielded Twisted Pair


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

VoIP Voice over Internet Protocol


(DCC) NO. _____________________

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


14
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

7. TELEPHONE SYSTEM
ENGG CERT

7.1. General Description


GKR
GKR

The new Analog Telephone system shall be compatible with the Line Access
Gateway (LAG) system which was installed at EWPS-7 & EWPS-11 under BI-10-
00246.
The telephony network provision under this project for the EWG-2 pipeline is to
interface analog telephones to IP main Telephone Controllers located in Dhahran &
ABQAIQ through Line Access Gateway (LAG) in EWPS-7 / EWPS-11 Comms
DESCRIPTION

Building. The LAG shall be interfaced with existing IT MPLS Routers at EWPS-7 and
08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

EWPS-11 Communication buildings, as shown in the drawing XA-141881.001.


Ethernet ports in the existing IT MPLS Routers shall be utilized for this connectivity.
Analog outdoor Telephone sets shall be installed at the RTU shelters along the EWG-
2 pipeline locations, to cater telephone services for operations and maintenance. All
analog telephones shall be industrial-type that operates in harsh environment.
The Analog telephone at each RTU / LDS along the EWG-2 pipeline shall be
interfaced with the new OTN N2021R node. The OTNs in RTU/LDS Shelters shall be
JO/EWO

connected to the IT MPLS routers through LAG located at the Communication


BI-10-

BI-10-

Buildings.
Outdoor Analog Telephone sets shall be supplied for the RBFG-1 pipeline areas & will
DATE

be interfaced to the IP telephone system at Rabigh BP Communications Building WR-


655 and V-62 Comms Shelter through OTN 600 ring network. For interfacing the
01B
01A
NO.
REV

Analog telephones with the IT MPLS routers in Rabigh BP Communications Building


DISCIPLINE
ENGINEER WR-655 and V-62 Comms Shelter, ports on the existing Line Access Gateways shall
GKR be utilized, as shown on the drawing XA-141927-001.
08 APR 19
DATE:
PROJECT The new Analog Telephone system shall interface with the IT Data Switches and to
ENGINEER
DSN
the IP telephone main controllers at Dhahran B-840 and Abqaiq DCO through the
08 APR 19 Corporate Data Network/ OTNs / LAG.
DATE:
CERTIFIED
DSN The components required to complete a functional telephone system for Package 1
08 APR 19 (WR) shall comprise the following;
DATE:
CONSTRUCTION
AGENCY  Industrial type outdoor Analog telephone sets & indoor analog telephone
MAH
handsets shall be connected to the OTN through 2W / 4W-E&M port for the
DATE: EWG-2& RBFG-1 pipeline. High grade Analog phones shall be used.
OPERATIONS
FAG  Analog Voice Service Unit (Line Access Gateway) - An Analog telephone
DATE:
service unit which connects to the business LAN network and provides a
defined quantity of conventional Analog telephone interfaces (FXS) type ports
CONTROL NUMBER
VERIFICATION

to allow connection of conventional Analog telephone handsets and for


EDSD

interfacing to equipment that requires an Analog interface. The Analog service


unit shall be cabled such that Analog voice ports are presented as standard
DATE:
BY:

patch panel outlets for patching to wall outlets using standard patch cables.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

VENDOR shall provide additional user licenses necessary to upgrade the existing
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

system in Dhahran B-840 and Abqaiq DCO system to support the additional handsets
(DCC) NO. _____________________

being provided as part of this project and shall comply with BI-10-00246.

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


15
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

7.2. Analog Telephone


ENGG CERT

VENDOR Scope of Work for the Analog Telephone System shall include the following
GKR
GKR

but not limited to:


 Supply, Testing, Configuration, FAT, IFAT, Commissioning, SAT of high grade
Analog phones and other telephone system equipment to meet the
requirements of this project and to be installed in each of the locations of
Package 1 (WR).
 Provision of Analog Voice Service Units or Line Access Gateway to allow
DESCRIPTION

conventional Analog telephones to be interfaced to the IP telephone system.


08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

 Coordination with Telephone Switching Area IT group to obtain the required


telephony services
 Testing and commissioning for all conventional analog phones on completion
of the installations in co-ordination with SAUDI ARAMCO/COMPANY IT
Department.
 Analog phones shall be connected to the Line Access Gateway using standard
UTP Cat 6 patch cables.
JO/EWO
BI-10-

BI-10-

For configuration of the existing Huawei IMS Line Access Gateway (LAG), provided
by others under BI-10-00246, Vendor/Contractor shall be responsible to coordinate
DATE

with Huawei vendor to carry out work with SAUDI ARAMCO/COMPANY IT


supervision. All LAG will need to have their MAC addresses registered with the IP
telephony system.
01B
01A
NO.
REV

DISCIPLINE
ENGINEER 7.3. Technical Requirements for Analog Telephones
GKR
08 APR 19
DATE: 7.3.1. Analog Telephone Requirements
PROJECT
ENGINEER
DSN
The Analog telephones shall satisfy the following requirements:
08 APR 19
DATE: Weatherproof Outdoor Analog Telephones:
CERTIFIED
DSN  Handset with associated components shall be industrial strength, weather
DATE:
08 APR 19 proof, corrosion resistant suitable for plant.
CONSTRUCTION
AGENCY  Ingress Protection – IP66
MAH

DATE:  Alphanumerical display


OPERATIONS
 Keypad with ABC lettering for name entries
FAG

DATE:
 Handset hook switch
CONTROL NUMBER
VERIFICATION

 Ringing sound pressure level: Approx 90dB(A) at 1m distance


EDSD

 Listening by loudspeaker
DATE:
BY:

Indoor Analog Telephones:


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

The Indoor Analog telephones shall satisfy the following requirements:


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

(DCC) NO. _____________________

 Wall mountable

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


16
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

 Hands free operation


ENGG CERT

 Telephone number memory - 20


GKR
GKR

 Incoming call LED indicator


 Ringer tone and volume control
 Timed break recall facility
 Single button last number redial facility.
 Secrecy (mute) button
DESCRIPTION

08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION

 Call transfer button


08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

7.3.2. Line Access Gateway


The LAG shall provide connectivity for analog telephones to the IP telephone
Network. Contractor to ensure availability and reservations of vacant slots in the
existing LAG to install the required analog line cards. If no vacant slots are available,
then this project is responsible to expand the existing LAG systems. The LAG shall
have following features as a minimum:
JO/EWO

 Comprehensive QoS mechanism


BI-10-

BI-10-

 Supports multiple voice codecs


DATE

 Local/Remote/Web based management


 19” rack mount
01B
01A
NO.
REV

DISCIPLINE
ENGINEER
 Redundant power supplies
GKR
08 APR 19
 Analog telephone subscriber cable for connectivity to MDF/IDF
DATE:
PROJECT
ENGINEER
The Line Access Gateway shall support 32 Analog telephone lines as a minimum.
DSN
NOTE: SAPMT to verify the required reservation process, if any.
08 APR 19
DATE:
CERTIFIED 7.3.3. Cable Glands
DSN

08 APR 19
Cable glands shall be of double compression type, nickel plated brass, weatherproof
DATE:
CONSTRUCTION
to IP66, as a minimum.
AGENCY
MAH All cable glands shall be provided with the necessary accessories such as PVC
DATE: shroud, locknut, washer, etc.
OPERATIONS
Cable glands at the Telephony System Cabinet end shall be sealed.
FAG

DATE:
7.3.4. Associated cabling and Ancillary
CONTROL NUMBER

VENDOR shall also provide the associated cabling & ancillary items required to make
VERIFICATION

the system functional.


EDSD

7.3.5. Telephone Equipment Staging


DATE:
BY:

Telephone Equipment shall be staged in a specified staging facility to check the


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

correct functioning of all telephone system equipment prior to shipment to site.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

The equipment shall be tested and configured prior to field installation, and any
(DCC) NO. _____________________

equipment defects shall be coordinated by the CONTRACTOR for replacement. All


testing shall be carried out in accordance with an agreed factory acceptance test
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


17
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

specification and shall be witnessed by SAUDI ARAMCO/COMPANY.


ENGG CERT

Preliminary configuration shall be performed in the staging area with the required
information provided by SAUDI ARAMCO/COMPANY.
GKR
GKR

7.3.6. Numbering Plan


The numbering plan shall be decided by the IMS Administration. The MGS Expansion
Phase II telephone numbers will be assigned by COMPANY, according to assigned
numbers within the East West Pipeline COMPANY numbering plan.
7.3.7. Additional requirements
DESCRIPTION

VENDOR shall procure, supply and install required licenses and hardware associated
08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

with the use of the number of new subscribers added on to the IMS at Dhahran and
Abqaiq.
All associated documentation required for this project shall be provided by VENDOR.
7.3.8. Grounding
VENDOR shall follow grounding system in accordance with COMPANY Standards
and the prime references shall be SAES-T-795, SAES-T-916, NFPA 70 National
Electrical Code (NEC) Article 200, Article 250 and TIA/EIA- 607.
JO/EWO
BI-10-

BI-10-

The size of the equipment grounding conductors shall be in accordance with NEC
Article 250-95.
DATE

All metal enclosures shall be grounded to the plant or building grounding system with
a green insulated copper conductor of minimum No. 6 AWG (16 mm²).
01B
01A
NO.
REV

DISCIPLINE
ENGINEER 8. INSPECTION, TESTING AND COMMISSIONING
GKR

DATE:
08 APR 19
VENDOR/CONTRACTOR shall ensure that materials and standard of workmanship
PROJECT
ENGINEER are inspected at regular stages during the assembly, integration and installation of
DSN equipment.
08 APR 19
DATE:
CERTIFIED The System installation and testing shall be performed by BICSI or equivalent Industry
DSN
qualified personnel. They shall base the installation using the BICSI
08 APR 19
DATE: Telecommunications Distribution Methods Manual (TDMM) and Network Design
CONSTRUCTION
AGENCY Reference Manual (NDRM).
MAH

DATE: An Integrated Factory Acceptance Test (IFAT) shall be included as part of formal
OPERATIONS testing of systems or subsystems. VENDOR shall develop detailed testing criteria
FAG which shall be submitted for SAUDI ARAMCO/COMPANY & CONTRACTOR review.
DATE: Each individual test shall have Pass / Fail criteria listed in the test specification SAT &
IFAT witnessed by a representative of SAUDI ARAMCO/COMPANY or their designee,
CONTROL NUMBER
VERIFICATION

CONTRACTOR and VENDOR. All test equipment required for testing shall be
EDSD

provided by VENDOR.
DATE:

All Test results shall be signed by a certified qualified installer on each sheet and shall
BY:

be witnessed by a SAUDI ARAMCO/COMPANY representative.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

Pre-commissioning and Commissioning of the system shall take place against a


formal Commission Test Specification. The testing shall demonstrate the correct
(DCC) NO. _____________________

operation of the system prior to formal acceptance of the system by SAUDI

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


18
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

ARAMCO/COMPANY and handover to Operations.


ENGG CERT

8.1. Inspection
GKR
GKR

CONTRACTOR shall keep detailed inspection records of equipment and systems


which shall be made available to SAUDI ARAMCO/COMPANY if requested.

8.2. Integrated Factory Acceptance Testing

CONTRACTOR shall carry out a formal Integrated Factory Acceptance Test against
an Acceptance Test Specification that has been agreed by SAUDI
DESCRIPTION

ARAMCO/COMPANY as being suitable for the test. The test specification shall
08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

include details and diagrams of the test set-up, details of the test equipment types to
be used as well as space for test results to be recorded against each test. Interfaces
to all systems and sub-systems shall be simulated during IFAT which shall be signed
off by SAUDI ARAMCO/COMPANY Telecommunications engineer.
Factory Acceptance testing shall take place at either CONTRACTOR’s equipment
integration site or at a VENDOR’s manufacturing site. The testing shall include all
parts of the system being tested including accessories. All test equipment used shall
have in-date calibration certificates, copies of which shall form part of the test records.
JO/EWO
BI-10-

BI-10-

Any issues arising during the tests or drawing mark-ups required shall be recorded on
a punch list and appropriate action agreed with SAUDI ARAMCO/COMPANY. Each
DATE

punch list item shall be rectified and signed off by SAUDI ARAMCO/ COMPANY
before equipment delivery to site, unless on-site rectification of minor punch list items
01B
01A
NO.
REV

is agreed with SAUDI ARAMCO/COMPANY.


DISCIPLINE
ENGINEER
GKR 8.3. Site Acceptance Testing
08 APR 19
DATE:
PROJECT A site acceptance test shall be performed after the equipment has been installed at
ENGINEER
DSN
site. This test is typically a repeat of some or all of the Factory Acceptance Tests and
08 APR 19 is carried out prior to full system commissioning, possibly before integration with other
DATE:
CERTIFIED telecommunications systems on site.
DSN
CONTRACTOR shall carry out a formal Site Acceptance Test against an Acceptance
08 APR 19
DATE: Test Specification that has been agreed by SAUDI ARAMCO/COMPANY as being
CONSTRUCTION
AGENCY suitable for the test. The test specification shall include details and diagrams of the
MAH
test set-up, details of the test equipment types to be used as well as space for test
DATE: results to be recorded against each test.
OPERATIONS
FAG Site Acceptance testing shall take place at the final installation site for the equipment.
The testing shall include all parts of the system, agreed with SAUDI
DATE:
ARAMCO/COMPANY, including accessories. All test equipment used shall have in-
CONTROL NUMBER
VERIFICATION

date calibration certificates, copies of which shall form part of the test records. Any
EDSD

issues arising during the tests or drawing mark-ups required shall be recorded on a
punch list and appropriate action agreed with SAUDI ARAMCO/COMPANY. Each
DATE:

punch list item shall be rectified and signed off by SAUDI ARAMCO/COMPANY
BY:

before final commissioning of the system and formal acceptance, unless otherwise
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

agreed with SAUDI ARAMCO/COMPANY.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

(DCC) NO. _____________________

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


19
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

8.4. Pre-Commissioning and Commissioning


ENGG CERT

These tests shall be witnessed by representatives of SAUDI ARAMCO/COMPANY


GKR
GKR

and usually includes both Project and Operations personnel.


Commissioning shall include, but is not limited to:
 An audit and inspection of equipment installed that makes up the system
 A review of all punch lists from previous inspection and tests to verify that
rectification / resolution has taken place
DESCRIPTION

 Tests to verify correct functionality of the system when installed and integrated
08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION

in its operational conditions


08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

CONTRACTOR shall carry out formal Commissioning against a Specification that has
been agreed by SAUDI ARAMCO/COMPANY as being suitable for this purpose. The
specification shall include details and diagrams of the test set-up, details of the test
equipment types to be used as well as space for test results to be recorded against
each test.
Any deficiencies or issues noted during the tests shall be punch listed for rectification
or resolution.
JO/EWO
BI-10-

BI-10-

On successful completion of the commissioning work and rectification / resolution of


punch list items, COMPANY shall formally accept system from CONTRACTOR.
DATE

9. MAINTENANCE AND SPARES


01B
01A
NO.
REV

DISCIPLINE 9.1. Maintenance


ENGINEER
GKR
08 APR 19 The Analog Telephone system shall take into account the need for maintenance as
DATE:
PROJECT part of the design. This shall include, but is not limited to:
ENGINEER
DSN  Ensuring that system components are easily accessible avoiding, where
DATE:
08 APR 19
possible, special access provisions such as the need to use scaffolding.
CERTIFIED
DSN  Ensuring that components can be easily removed without having to dismantle
DATE:
08 APR 19 or remove unrelated components.
CONSTRUCTION
AGENCY  Using a modular design so that field replaceable items can be quickly
MAH
exchanged to minimize Mean Time to Repair (MTTR). Where possible ‘Hot
DATE: Swap’ items are preferred.
OPERATIONS
FAG  Use high quality, high reliability components to ensure Mean Time Between
DATE:
Failure (MTBF) is as high as possible, consistent with the need to keep system
cost to an acceptable level.
CONTROL NUMBER
VERIFICATION

 Keeping the number and type of equipment’s to the minimum required for the
EDSD

system, avoiding unnecessary proliferation of equipment and component


DATE:

types.
BY:

 Ensuring that all components used are of a modern current type and not
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

flagged as being ‘End- of-Life’ or ‘End-of-Support’ with the manufacturer.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

(DCC) NO. _____________________

 Ensure ‘In-country’ support by selected Telephone System VENDOR is


available.
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


20
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FAG
FAG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH

 Installation, Operations and Maintenance documentation shall be required as


ENGG CERT

part of the system deliverables.


GKR
GKR

9.2. System Spares

CONTRACTOR / VENDOR shall provide all commissioning and start-up spare parts
and consumables, such as fuses, likely to be required during these project phases as
part of the deliverable systems.
Any replacement parts required during the system Warranty Period shall be provided
at VENDOR’s expense.
DESCRIPTION

08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION

All spare parts supplied shall be packaged and protected for prolonged storage in the
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION

environmental conditions applicable to the Package 1 (Western Region) sites.


CONTRACTOR / VENDOR shall provide a detailed list of recommended Operational
Spares, to cover the first two years of Operation.
CONTRACTOR shall provide a detailed list of tools and test equipment required to
operate and maintain the system.

10. TRAINING
JO/EWO
BI-10-

BI-10-

VENDOR shall identify training requirements for both SAUDI ARAMCO/COMPANY


maintenance staff and how this training can be provided, either via on-site instruction
DATE

by qualified instructors or by external training course or a combination of both.


Details of Training shall be provided to ensure that training can be planned to take
01B
01A
NO.
REV

place before plant start-up and shall be specific to plant cabling system.
DISCIPLINE
ENGINEER
GKR
All training providers shall be both suitably qualified and have familiarity with the
08 APR 19 systems on which they are providing instruction. Training shall be specific to the
DATE:
PROJECT project and shall include a detailed troubleshooting module. Training shall be available
ENGINEER
in English and Arabic.
DSN
08 APR 19
DATE:
CERTIFIED
DSN

08 APR 19
DATE:
CONSTRUCTION
AGENCY
MAH

DATE:
OPERATIONS
FAG

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01B

(DCC) NO. _____________________

SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

PACKAGE - 1 (WESTERN REGION) DOC F99/K94


21
EWG-2 PIPELINE / RBFG-1 PIPELINE
T 5140520-0000-SPC-
TE-0205 OF 01B
YANBU SAUDI ARABIA JO: BI-10-01810-0002 21
5140520-0000-SPC-TE-205 Rev 01B