5140520-0000-SPC-TE-0205 Rev 01B
5140520-0000-SPC-TE-0205 Rev 01B
5140520-0000-SPC-TE-0205 Rev 01B
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
01B
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________ BI-10-
OF THIS DRAWING IS COVERED, FOR ALL
01A 08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION GKR DSN MAH FAG
CONTROL NUMBER
DSN
FAG
GKR
MAH
BI-10-
DSN
APPROVAL/CERTIFICATION REQUIREMENTS, 01B 08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION GKR DSN MAH FAG
AGENCY
BY:
PROJECT
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
DISCIPLINE
CERTIFIED
OPERATIONS
08 APR 19
08 APR 19
CONSTRUCTION
08 APR 19
(DCC) NO. _____________________ DATE:
YANBU
Saudi Aramco 2616-ENG (03/99)
JO:
F99/K94
PACKAGE 1
WESTERN REGION
SAUDI ARABIAN OIL COMPANY
TE-0205
DRAWING NO.
BI-10-01810-0002
T 5140520-0000-SPC-
MASTER GAS SYSTEM EXPANSION
21
OF
ISSUED FOR CONSTRUCTION
SHT.NO.
SPECIFICATION FOR TELEPHONE SYSTEM
REV.NO.
01B
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
TABLE OF CONTENTS
ENGG CERT
1. INTRODUCTION 3
GKR
GKR
3. DEFINITIONS 6
08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION
4. ORDER OF PRECEDENCE 7
5. SPECIFICATIONS, STANDARDS AND CODES 7
5.1. Saudi Aramco Documents 7
5.2. International Codes & Standards 10
5.3. Project Specifications & Drawings 12
5.4. Conflicts and Deviations 12
JO/EWO
BI-10-
BI-10-
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
1. INTRODUCTION
ENGG CERT
Saudi Aramco operates the world’s largest single hydrocarbon network, the Master
Gas System (MGS). The MGS is a gas gathering and processing system built in the
mid-1970s, and has been the backbone of the country's industrial network since the
system’s completion in 1982. The MGS enables Saudi Aramco to use or market
nearly all the gas associated with oil production and all non-associated gas produced
from deep gas reservoirs.
DESCRIPTION
BI-10-
DATE
01B
01A
NO.
REV
DISCIPLINE
ENGINEER
GKR
08 APR 19
DATE:
PROJECT
ENGINEER
DSN
08 APR 19
DATE:
CERTIFIED
DSN
DATE:
OPERATIONS
FAG
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Fig 1.2: Geographical View of West, Central & East Pipeline Facilities
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
The purpose of the expansion facilities is to meet increased demand along the
ENGG CERT
Eastern Region and out to the Central and Western Regions of Saudi Arabia by
providing 9.6 BSCFD of gas by 2016 (3rd Quarter) and then 12.538 BSCFD of gas by
GKR
GKR
2020 (Phase II) through the installation of new pipelines and Booster Gas Compressor
Stations (BGCS). These facilities will be sized to ensure sufficient pipeline capacity
and pressure to maintain the reliability of the MGS by providing an eight-hour survival
time for all sales gas customers
CONSULTANT scope within the Master Gas System Expansion Phase II Pipelines
08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
support as below:
through to handover;
BI-10-
BI-10-
procurement of materials.
2. DOCUMENT OBJECTIVE
01B
01A
NO.
REV
DISCIPLINE
ENGINEER This document defines the Telephone Specification for the Package-1 (Western
GKR
Region) of EPC Phase of the MGS Expansion – Phase II Project.
08 APR 19
DATE:
PROJECT
ENGINEER 2.1. Description of the Facilities
DSN
DATE:
08 APR 19 The communication facilities required under this package are summarize below:
CERTIFIED
DSN EWG-2 Pipeline
08 APR 19
DATE: New 56” diameter externally coated Carbon Steel pipeline, about 422 Km long,
CONSTRUCTION
AGENCY from EWPS#7 to EWPS#11 and shall install a total approx. of 31,500 meters
MAH of 24-core ITU-T G.655E FOC cable to connect various RTUs and LDS to the
DATE: Communication Building for the LDS/SCADA data and telephone systems
OPERATIONS requirements. Final cable quantity shall be as per Telecom Cable Schedule –
FAG Package 1;
DATE:
4 nos. of Scrapper Launcher;
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
2 nos. of New Master server for LDS in EWG-2 P/L, EWPS-7 & EWPS-11;
Communications links between the new field RTUs to be constructed at
different Valve Station sites and Scrapper Launcher/Receivers along the
pipeline and the existing SCADA System at OSPAS OCC/CDC in Dhahran;
Communication integration to existing Saudi Aramco backbone network by
DESCRIPTION
BI-10-
Remote Terminal Units (RTU) in the new and existing pipeline corridors and
from the additional RTUs to be installed by the project;
DATE
The project shall supply power to the new telecommunication equipment from
DISCIPLINE
ENGINEER existing sources. Where power is unavailable for the RTU’s located at the
GKR
Valve Stations, solar power shall be used.
08 APR 19
DATE:
PROJECT
ENGINEER
Any other facilities to meet the Overall project objective.
DSN
RBFG-1 Pipeline
08 APR 19
DATE:
CERTIFIED New 24” diameter pipeline about 6.8 km long (KM 134 of EWRBG-1 to Petro-
DSN
Rabigh / LIP) and shall install a total approx. of 7,500 meters of 48-core ITU-T
DATE:
08 APR 19
G.655E FOC cable to connect the RTUs and LDS to Communication Building
CONSTRUCTION
AGENCY
for the LDS/SCADA data and telephone systems requirements. Final cable
MAH quantity shall be as per Telecom Cable Schedule – Package-1
DATE:
OPERATIONS
1 no. of Scrapper Launcher;
FAG 1 no. of Scrapper Receiver
DATE:
1 no. new cold vent at BPFS skid top;
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION
2.2. Locations
JO/EWO
BI-10-
BI-10-
The EWG-2 & RBFG-1 pipelines are located in the Western Region pipeline corridor.
The current scope of work for the Package 1 (Western Region) as shown in Fig. 1.1
DATE
3. DEFINITIONS
DISCIPLINE
ENGINEER
GKR COMPANY : SAUDI ARAMCO organization (ARAMCO Services
DATE:
08 APR 19 COMPANY, ARAMCO Overseas COMPANY, SAUDI
PROJECT
ENGINEER
ARAMCO)
DSN
08 APR 19 CONTRACTOR : Saudi KAD
DATE:
CERTIFIED
DSN Operating Facilities : The equipment within an operational area
08 APR 19
DATE:
CONSTRUCTION Project : Master Gas System Expansion Project Phase II
AGENCY
MAH
TSI (Telecom : Means the Party (Parties) which manufactures and/or
DATE: System Integrator) supplies materials, equipment, technical documents or
OPERATIONS
drawings and/or services to perform the duties specified
FAG
by the COMPANY/CONTRACTOR.
DATE:
CONTROL NUMBER
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
The Job Specification contains language which could imply that certain standards,
ENGG CERT
specifications and practices are discretionary. Where the words such as "will", "may"
or "should" appear in the Job Specification, these shall mean and be interpreted as
GKR
GKR
shall" by VENDOR.
4. ORDER OF PRECEDENCE
The design should be performed in compliance with Saudi Aramco Desktop
Standards unless appropriate waivers obtained. Current Industry and regulatory
bodies’ standards should be used in the absence of applicable Saudi Aramco
Standards. In all cases, such usage shall be subject to prior approval by Saudi
DESCRIPTION
Aramco.
08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION
In case of conflict between the documents provided by Company, the conflict will be
resolved in accordance with the following order of precedence.
i. Project Scope of Work / Material Requisition / Bid Documents;
ii. Other Project Drawings and Documents;
iii. COMPANY-provided Waivers;
iv. SAUDI ARAMCO Engineering Standards (SAES);
JO/EWO
BI-10-
BI-10-
DATE:
08 APR 19 5. SPECIFICATIONS, STANDARDS AND CODES
CONSTRUCTION
AGENCY The following key specifications and standards are applicable. Refer to the Project
MAH
Specifications for detailed specification, drawing, code and standard requirements.
DATE:
OPERATIONS 5.1. Saudi Aramco Documents
FAG
DATE:
Ref. Document Number Title
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
BI-10-
/12/ SAES-Z-020
Process Control Networks
DATE
DATE:
08 APR 19
Saudi Aramco Engineering Procedures
CONSTRUCTION
AGENCY
MAH /17/ SAEP-99 Process Automation Networks & Systems Security
DATE:
OPERATIONS /18/ SAEP-127 Security & Control of Saudi Aramco Engineering Data
FAG
APPROVAL/CERTIFICATION REQUIREMENTS,
/21/ SAEP-302
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
/22/ SAEP-334
Engineering and VENDOR Drawings
BI-10-
08 APR 19
DATE:
CONSTRUCTION
/35/ SAER-1972 Saudi Aramco Materials Inspection and Testing
AGENCY
MAH
DATE:
/36/ SAER-6123 Process Automation Networks Firewall Evaluation Criteria
OPERATIONS
FAG Saudi Aramco Materials System Specifications
DATE:
CONTROL NUMBER
/37/ 18-SAMSS-625
mode & Multimode)
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
GKR
GKR
BI-10-
DISCIPLINE
ENGINEER Administrative Standard for the Telecommunications
/45/ EIA/TIA-606
GKR
Infrastructure of Commercial Buildings
08 APR 19
DATE:
PROJECT
ENGINEER Commercial Building Grounding and Bonding
/46/ EIA/TIA-607
DSN Requirements for Telecommunications
08 APR 19
DATE:
CERTIFIED
Customer-Owned Outside Plant Telecommunications
DSN /47/ EIA/TIA-758
Standard
08 APR 19
DATE:
CONSTRUCTION
AGENCY /48/ IEC 60079 Electrical Apparatus for explosive gas atmosphere
MAH
DATE:
OPERATIONS /49/ IEC 60529 Degrees of protection Provided by Enclosures (IP Code)
FAG
DATE:
/50/ IEC 60617 Graphical Symbols for Diagrams
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
BI-10-
08 APR 19
DATE: /66/ IEEE 802.3z Gigabit Ethernet (fiber-based)
CONSTRUCTION
AGENCY
MAH
Gigabit Ethernet (copper-based; unshielded twisted pair
/67/ IEEE 802.3ab
DATE: category 6 cabling)
OPERATIONS
FAG
EN 61000-6-2 & - This specification defines electromagnetic characteristics
/68/
DATE: 4 for interference immunity
CONTROL NUMBER
VERIFICATION
FCC Part
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
5140520-0000-BOD-
/72/ Telecommunication Basis Of Design Package-1
TE-0203
/74/
003 System) – EWG-2 Pipeline
BI-10-
K94-T-XA-141893.001-
/77/ Overall FOC Schematic Diagram - EWG-2 Pipeline
004
DATE
DISCIPLINE
Logical Data Network Diagram (RTU & LDS
ENGINEER /79/ F99-T-XA-141928.001
GKR System) – RBFG-1 Pipeline
08 APR 19
DATE:
PROJECT
ENGINEER Voice Connectivity Diagram (Telephone System) –
/80/ F99-T-XA-141929.001
DSN RBFG-1 Pipeline
08 APR 19
DATE:
CERTIFIED Overall FOC Schematic Diagram - RBFG-1
DSN /81/ F99-T-XA-141930.001
Pipeline
08 APR 19
DATE:
CONSTRUCTION
AGENCY
MAH
5.4. Conflicts and Deviations
DATE:
Any Conflicts / Deviations, shall be brought by the Equipment / Telecommunication
OPERATIONS
VENDOR to the attention of the COMPANY \ CONTRACTOR at the time of submitting
FAG
quotation and obtain the resolution prior to placing of orders.
DATE:
If any inconsistency or conflict exists between this specification and other COMPANY
CONTROL NUMBER
VERIFICATION
Deviation from the standards as listed shall not be permitted unless approved by
COMPANY.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
dB Decibels
DC Direct Current
DCC Disaster Control Centre
DCO Digital Central Office
EIA Electronic Industries Alliance
JO/EWO
EW East West
BI-10-
BI-10-
ETH Ethernet
EWOCC East-West Operations Control Centre
01B
01A
NO.
REV
IT Information Technology
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
KM Kilometer
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
BI-10-
P/L Pipeline
DATE
UL Underwriters Laboratories
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
7. TELEPHONE SYSTEM
ENGG CERT
The new Analog Telephone system shall be compatible with the Line Access
Gateway (LAG) system which was installed at EWPS-7 & EWPS-11 under BI-10-
00246.
The telephony network provision under this project for the EWG-2 pipeline is to
interface analog telephones to IP main Telephone Controllers located in Dhahran &
ABQAIQ through Line Access Gateway (LAG) in EWPS-7 / EWPS-11 Comms
DESCRIPTION
Building. The LAG shall be interfaced with existing IT MPLS Routers at EWPS-7 and
08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION
BI-10-
Buildings.
Outdoor Analog Telephone sets shall be supplied for the RBFG-1 pipeline areas & will
DATE
patch panel outlets for patching to wall outlets using standard patch cables.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
VENDOR shall provide additional user licenses necessary to upgrade the existing
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
system in Dhahran B-840 and Abqaiq DCO system to support the additional handsets
(DCC) NO. _____________________
being provided as part of this project and shall comply with BI-10-00246.
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
VENDOR Scope of Work for the Analog Telephone System shall include the following
GKR
GKR
BI-10-
For configuration of the existing Huawei IMS Line Access Gateway (LAG), provided
by others under BI-10-00246, Vendor/Contractor shall be responsible to coordinate
DATE
DISCIPLINE
ENGINEER 7.3. Technical Requirements for Analog Telephones
GKR
08 APR 19
DATE: 7.3.1. Analog Telephone Requirements
PROJECT
ENGINEER
DSN
The Analog telephones shall satisfy the following requirements:
08 APR 19
DATE: Weatherproof Outdoor Analog Telephones:
CERTIFIED
DSN Handset with associated components shall be industrial strength, weather
DATE:
08 APR 19 proof, corrosion resistant suitable for plant.
CONSTRUCTION
AGENCY Ingress Protection – IP66
MAH
DATE:
Handset hook switch
CONTROL NUMBER
VERIFICATION
Listening by loudspeaker
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Wall mountable
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
BI-10-
DISCIPLINE
ENGINEER
Redundant power supplies
GKR
08 APR 19
Analog telephone subscriber cable for connectivity to MDF/IDF
DATE:
PROJECT
ENGINEER
The Line Access Gateway shall support 32 Analog telephone lines as a minimum.
DSN
NOTE: SAPMT to verify the required reservation process, if any.
08 APR 19
DATE:
CERTIFIED 7.3.3. Cable Glands
DSN
08 APR 19
Cable glands shall be of double compression type, nickel plated brass, weatherproof
DATE:
CONSTRUCTION
to IP66, as a minimum.
AGENCY
MAH All cable glands shall be provided with the necessary accessories such as PVC
DATE: shroud, locknut, washer, etc.
OPERATIONS
Cable glands at the Telephony System Cabinet end shall be sealed.
FAG
DATE:
7.3.4. Associated cabling and Ancillary
CONTROL NUMBER
VENDOR shall also provide the associated cabling & ancillary items required to make
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
The equipment shall be tested and configured prior to field installation, and any
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
Preliminary configuration shall be performed in the staging area with the required
information provided by SAUDI ARAMCO/COMPANY.
GKR
GKR
VENDOR shall procure, supply and install required licenses and hardware associated
08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION
with the use of the number of new subscribers added on to the IMS at Dhahran and
Abqaiq.
All associated documentation required for this project shall be provided by VENDOR.
7.3.8. Grounding
VENDOR shall follow grounding system in accordance with COMPANY Standards
and the prime references shall be SAES-T-795, SAES-T-916, NFPA 70 National
Electrical Code (NEC) Article 200, Article 250 and TIA/EIA- 607.
JO/EWO
BI-10-
BI-10-
The size of the equipment grounding conductors shall be in accordance with NEC
Article 250-95.
DATE
All metal enclosures shall be grounded to the plant or building grounding system with
a green insulated copper conductor of minimum No. 6 AWG (16 mm²).
01B
01A
NO.
REV
DISCIPLINE
ENGINEER 8. INSPECTION, TESTING AND COMMISSIONING
GKR
DATE:
08 APR 19
VENDOR/CONTRACTOR shall ensure that materials and standard of workmanship
PROJECT
ENGINEER are inspected at regular stages during the assembly, integration and installation of
DSN equipment.
08 APR 19
DATE:
CERTIFIED The System installation and testing shall be performed by BICSI or equivalent Industry
DSN
qualified personnel. They shall base the installation using the BICSI
08 APR 19
DATE: Telecommunications Distribution Methods Manual (TDMM) and Network Design
CONSTRUCTION
AGENCY Reference Manual (NDRM).
MAH
DATE: An Integrated Factory Acceptance Test (IFAT) shall be included as part of formal
OPERATIONS testing of systems or subsystems. VENDOR shall develop detailed testing criteria
FAG which shall be submitted for SAUDI ARAMCO/COMPANY & CONTRACTOR review.
DATE: Each individual test shall have Pass / Fail criteria listed in the test specification SAT &
IFAT witnessed by a representative of SAUDI ARAMCO/COMPANY or their designee,
CONTROL NUMBER
VERIFICATION
CONTRACTOR and VENDOR. All test equipment required for testing shall be
EDSD
provided by VENDOR.
DATE:
All Test results shall be signed by a certified qualified installer on each sheet and shall
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
8.1. Inspection
GKR
GKR
CONTRACTOR shall carry out a formal Integrated Factory Acceptance Test against
an Acceptance Test Specification that has been agreed by SAUDI
DESCRIPTION
ARAMCO/COMPANY as being suitable for the test. The test specification shall
08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION
include details and diagrams of the test set-up, details of the test equipment types to
be used as well as space for test results to be recorded against each test. Interfaces
to all systems and sub-systems shall be simulated during IFAT which shall be signed
off by SAUDI ARAMCO/COMPANY Telecommunications engineer.
Factory Acceptance testing shall take place at either CONTRACTOR’s equipment
integration site or at a VENDOR’s manufacturing site. The testing shall include all
parts of the system being tested including accessories. All test equipment used shall
have in-date calibration certificates, copies of which shall form part of the test records.
JO/EWO
BI-10-
BI-10-
Any issues arising during the tests or drawing mark-ups required shall be recorded on
a punch list and appropriate action agreed with SAUDI ARAMCO/COMPANY. Each
DATE
punch list item shall be rectified and signed off by SAUDI ARAMCO/ COMPANY
before equipment delivery to site, unless on-site rectification of minor punch list items
01B
01A
NO.
REV
date calibration certificates, copies of which shall form part of the test records. Any
EDSD
issues arising during the tests or drawing mark-ups required shall be recorded on a
punch list and appropriate action agreed with SAUDI ARAMCO/COMPANY. Each
DATE:
punch list item shall be rectified and signed off by SAUDI ARAMCO/COMPANY
BY:
before final commissioning of the system and formal acceptance, unless otherwise
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
Tests to verify correct functionality of the system when installed and integrated
08 APR 19 01810-0002 ISSUED FOR CONSTRUCTION
CONTRACTOR shall carry out formal Commissioning against a Specification that has
been agreed by SAUDI ARAMCO/COMPANY as being suitable for this purpose. The
specification shall include details and diagrams of the test set-up, details of the test
equipment types to be used as well as space for test results to be recorded against
each test.
Any deficiencies or issues noted during the tests shall be punch listed for rectification
or resolution.
JO/EWO
BI-10-
BI-10-
Keeping the number and type of equipment’s to the minimum required for the
EDSD
types.
BY:
Ensuring that all components used are of a modern current type and not
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DSN MAH
DSN MAH
CONTRACTOR / VENDOR shall provide all commissioning and start-up spare parts
and consumables, such as fuses, likely to be required during these project phases as
part of the deliverable systems.
Any replacement parts required during the system Warranty Period shall be provided
at VENDOR’s expense.
DESCRIPTION
All spare parts supplied shall be packaged and protected for prolonged storage in the
08 MAY 18 01810-0002 ISUED FOR CONSTRUCTION
10. TRAINING
JO/EWO
BI-10-
BI-10-
place before plant start-up and shall be specific to plant cabling system.
DISCIPLINE
ENGINEER
GKR
All training providers shall be both suitably qualified and have familiarity with the
08 APR 19 systems on which they are providing instruction. Training shall be specific to the
DATE:
PROJECT project and shall include a detailed troubleshooting module. Training shall be available
ENGINEER
in English and Arabic.
DSN
08 APR 19
DATE:
CERTIFIED
DSN
08 APR 19
DATE:
CONSTRUCTION
AGENCY
MAH
DATE:
OPERATIONS
FAG
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SPECIFICATION FOR TELEPHONE SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION