Eastern Visayas State University Ormoc City Campus: Engineering Department
Eastern Visayas State University Ormoc City Campus: Engineering Department
Eastern Visayas State University Ormoc City Campus: Engineering Department
CAMPUS
ENGINEERING DEPARTMENT
CE 324
CONCRETE
Submitted by:
MARILOU N. PINO
CE-3A
Submitted to:
Instructor
LOCATION
CORNER 1, EVALDEZ AND JUAN STREET, BRGY. DOLORES ORMOC CITY
PERSPECTIVES
ISOMETRIC VIEW
FRONT VIEW
REAR VIEW
BEAM LAYOUT
DEAD LOAD
*SELF WEIGHT OF STRUCTURE
Concrete Weight 23.5 KN/M^3
*ROOF CONSTRUCTION
Light-frame wood roof with wood structural
panel sheathing and ½ inch gypsum board ceiling
0.72 KN/M^2
with asphalt shingle roofing
*FLOOR CONSTRUCTION
Light-frame 2x12 wood floor with ¾ inch 0.47KN/M^2
wood structural panel sheathing and ½ inch gypsum
board ceiling without ½ inch gypsum board, with
carpet, vinyl or similar floor covering
*WALL CONSTRUCTION
Light-frame 2x4 wood wall with ½ inch wood 0.29 KN/M^2
structural panel sheathing and ½ inch gypsum board
finish for 2x6
LIVE LOAD
*ROOF LOAD
Slope ≥ 4:12 0.72 kpa
*FLOOR LOAD
Bedroom Areas 1.44 Kpa
WIND LOAD
SEISMIC LOAD
Minimum uniform live load = 5.28 kpa
V = SDS/(R/Ie) (W)
Where:
W = effective seismic weight of the building, 20% of the roof snow is included where the ground
snow load exceeds 1.44 Kpa
V = 0.12
Given:
pb l = 8m Fy =
= 32mm cc =
40mm
Solution:
Assume beam weight to be 20%
(DL+LL) Beam weight = 20% (94 + 48)
= 28.4 KN/m Wu = 1.2DL + 1.6LL
Wu = 1.2 (94 + 28.4) + 1.6 (48) = 247.2 KN/m
Mu = WuL^2/8
2
Mu = ((247.2) (8 )) / 8 = 1977.6 KN-m
Pb = 0.85 f’c β1/ fy (600/600+fy) =
0.0265 P = ½ pb = ½ (0.0265) =
0.01325
Mu = φbd^2fyp (1-pfy/1.7f’c)
6 2
1977.6 x 10 = (0.90) (450) (d ) (440) (0.01325) (1 – 0.01325(440)/1.7(28))
Use: 450x1050 d =
984mm
2
5867/(π/4) (32 )) = 7.29 or 8 pcs of 32mmφ bars Check for
spacing:
2
(0.003) = 0.0065 > 0.005 φ= 0.90 φ Mn = φ As fy (d-a/2) = 0.90(π/4 (32 ) (8))
(440) (984-264/2) = 2170.7x10^6 KN-m
2170 KN-m >1977.6 KN-m okay!
Wu = 1.2(94) + 1.6(48)
Wu = 189.6 KN/m
@A
2 2
MA = WuLn /14 = 189.6(1.25) /14 = 21.16 KN-m
@B
Ln =1/2(2000-250) (1/1000) = 0.875m
2 2
MB = WuLn /11 = (189.6) (0.875) /11 = 13.19 KN-m
@C
2 2
Mc = WuLn /10 = (189.6) (5.25) /10 = 522.58 KN-m
@F
2 2
MF = WuLn /16 =189.6 (1.75) /16 = 36.29 KN-m
Wu = 1.2DL + 1.6LL
Wu = 1.2(94) + 1.6(48)
Wu = 189.6 KN/m
@A
Ln = ½ (500+3000) (1/1000) = 1.75m
2 2
MA = WuLn /14 = 189.6 (1.75) /14 = 41.48 KN-m
@B
Ln = ½ (3000– 250) (1/1000) = 1.38m
2 2
MB = WuLn /11 = 189.6 (1.38) / 11 = 32.82 KN-m
@C
Ln = ½ (3750 + (4000 – 500)) (1/1000) = 3.625m
2 2
Mc = WuLn /10 = 189.6 (3.625) /10 = 249.146 KN-m
@F
Ln = ½ (4000 – 500) (1/1000) = 1.75m
MF = WuLn2/16 = 189.6 (1.75)²/16 = 36.29 KN –m
SUMMARY
Concrete weight = 23.5 KN/m^3 DLT
= 11.72 KN/m^2
LLT = 6 KN/m^2
WL = 300 kph
SL = 0.12 kpa
Rectangular section design
b = 450mm d = 980mm dT
= 1050mm Ed = 984mm
L = 8m
Cc = 40mm
Fy = 440 Mpa
F’c = 28 Mpa
P = ½ pb
Actual weight of beam = 11.10 KN/m < 28.4 KN/m okay!
8 pcs. of 32mm bars
Spacing = 450 > 224 okay!
Mn = 2170 KN–m > 19776.6 KN-m okay!
Ln (m) M (KN-m)
@A 1.25 21.16
@B 0.875 13.19
@C 5.25 522.58
@F 1.75 36.29
Ln (m) M (KN-m)
@A 1.75 41.48
@B 1.38 32.82
@C 3.625 249.146
@F 1.75 36.29