Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

BALANCE MANHOUR FOR ELECTRICAL

NOTE:- a- Main contractor issue, c- clearance available, aec-manpower+material issue


Total Manhours (balance)
Time Needed for One Manpower Required in Total Manhours Required Manhours Required
Sl. No Area Description of Balance work Qty Units Total qty Installed Balance Qty (A) No.of People (B) Clearance Status Balance Qty Required in hours = Remarks
Number of set in Mins C Mins (B*C) in hours = {A*(B*C)}/60 in mins {A*(B*C)}/60

1 Cable Pulling (50 sq.mm,35 sq.mm & 25 sq.mm) 17390 Mtrs 17,320.00 70.00 8 40 320 92746.6666666667 AEC 70.00 320.00 373.333333333333 MRN 2361

2 BASEMENT-1 Cable termination 820 Nos 800.00 20.00 5 60 300 4100 AEC 20.00 300.00 100 MRN 2361

3 Garbage chute works as per VO received from B1 to roof 0.00 0 VO 0.00 0.00 0 Variation order

1 Light Fixtures Installation 435 Nos 17.00 418.00 3 60 180 1305 A 418.00 180.00 1254

2 Strip light Installation 560 Mtrs 60.00 500.00 2 30 60 560 A 500.00 60.00 500

3 Driver installation and looping 60 Nos 0.00 60.00 2 60 120 120 A 60.00 120.00 120

4 Ceiling rose and heat resistant cable installation 550 Nos 380.00 170.00 2 40 80 733.333333333333 A 170.00 80.00 226.666666666667

5 Lighting control system installation 16 Nos 0.00 16.00 2 30 60 16 A 16.00 60.00 16

6 Emergency Light Fixtures installation 98 Nos 3.00 95.00 2 60 120 196 A 95.00 120.00 190

7 Fire Alarm points 102 Nos 1.00 101.00 2 30 60 102 A 101.00 60.00 101

8 CCTV points 59 Nos 3.00 56.00 2 30 60 59 A 56.00 60.00 56 Sub Contractor

9 Access Control Points 17 Nos 2.00 15.00 2 45 90 25.5 A 15.00 90.00 22.5 Sub Contractor

10 GROUND FLOOR Socket installation 342 Nos 2.00 340.00 2 20 40 228 A 340.00 40.00 226.666666666667

11 Switch Installation 51 Nos 1.00 50.00 2 20 40 34 A 50.00 40.00 33.3333333333333

12 Isolator lnstallation 10 Nos 9.00 1.00 2 120 240 40 A 1.00 240.00 4

13 Containment and Wiring for Gate Barrier 2 0 A 0.00 0.00

14 Installation of CCTV & Access control Rack 2 0 A 0.00 0.00 Sub Contractor

15 Installation of work station (CCTV & Access) 2 0 A 0.00 0.00 Sub Contractor

16 Installation of Monitor for CCTV 2 0 A 0.00 0.00 Sub Contractor

17 Containment and Wiring for light points in GF entrance 2 0 A 0.00 0.00

18 Wiring for light points in boundary wall & tent Light 2 0 A 0.00 0.00

19 Installation of boundary wall light fixtures & Tent Light 2 0 A 0.00 0.00 Material required by ABC

1 Light Fixtures Installation 391 Nos 62.00 329.00 3 60 180 1173 A 329.00 180.00 987 Paritial clearance

2 Strip light Installation 1060 Mtrs 0.00 1,060.00 2 30 60 1060 A 1,060.00 60.00 1060

3 Driver installation and looping 80 Nos 0.00 80.00 2 60 120 160 A 80.00 120.00 160

4 Lighting control system installation 20 Nos 2.00 18.00 2 30 60 20 A 18.00 60.00 18

5 Emergency Light Fixtures installation 102 Nos 12.00 90.00 2 60 120 204 A 90.00 120.00 180

6 Fire Alarm points 99 Nos 13.00 86.00 2 30 60 99 A 86.00 60.00 86

7 DRS Call station 3 Nos 0.00 3.00 2 30 60 3 A 3.00 60.00 3


FIRST FLOOR
8 CCTV points 15 Nos 3.00 12.00 2 30 60 15 A 12.00 60.00 12 Sub Contractor

9 Access Control Points 17 Nos 0.00 17.00 2 45 90 25.5 A 17.00 90.00 25.5 Sub contractor

10 Socket installation 298 Nos 25.00 273.00 2 20 40 198.666666666667 A 273.00 40.00 182

11 Switch Installation 55 Nos 10.00 45.00 2 20 40 36.6666666666667 A 45.00 40.00 30

12 Power wiring 85 Mtrs 0.00 85.00 2 30 60 85 C 85.00 60.00 85

13 Additional works for CCTV & Archive room 0.00 0.00 2 60 120 0 C 0.00 120.00 0

17 UPS Installation 1 Nos 3 180 540 9 C 0.00 540.00 0

1 Light Fixtures Installation 255 Nos 225.00 30.00 3 60 180 765 A 30.00 180.00 90 Paritial clearance

2 Strip light Installation 1861 Mtrs 1,820.00 41.00 2 30 60 1861 A 41.00 60.00 41 Paritial clearance

3 Driver installation and looping 120 Nos 117.00 3.00 2 60 120 240 A 3.00 120.00 6

4 Lighting control system installation 20 Nos 10.00 10.00 2 30 60 20 A 10.00 60.00 10

5 Emergency Light Fixtures installation 111 Nos 90.00 21.00 2 60 120 222 A 21.00 120.00 42 Paritial clearance

6 SECOND FLOOR Fire Alarm points 115 Nos 95.00 20.00 2 30 60 115 A 20.00 60.00 20

7 DRS Call station 3 Nos 2.00 1.00 2 30 60 3 A 1.00 60.00 1

8 CCTV points 18 Nos 4.00 14.00 2 45 90 27 A 14.00 90.00 21 Sub Contractor

9 Access Control Points 15 Nos 13.00 2.00 2 45 90 22.5 A 2.00 90.00 3 Sub Contractor

10 Socket installation 269 Nos 230.00 39.00 2 20 40 179.333333333333 A 39.00 40.00 26


NOTE:- a- Main contractor issue, c- clearance available, aec-manpower+material issue

Time Needed for One Manpower Required in Total Manhours Required Manhours Required Total Manhours (balance)
Sl. No Area Description of Balance work Qty Units Total qty Installed Balance Qty (A) No.of People (B) Clearance Status Balance Qty Required in hours = Remarks
Number of set in Mins C Mins (B*C) in hours = {A*(B*C)}/60 in mins {A*(B*C)}/60

11 Switch Installation 38 Nos 30.00 8.00 2 20 40 25.3333333333333 A 8.00 40.00 5.33333333333333

12 UPS Installation 1 Nos 3 180 540 9 C 0.00 540.00 0

1 Light Fixtures Installation 281 Nos 231.00 50.00 3 60 180 843 A 50.00 180.00 150 Paritial clearance

2 Strip light Installation(m) 1500 Mtrs 1,320.00 180.00 2 30 60 1500 A 180.00 60.00 180 Paritial clearance

3 Driver installation and looping 120 Nos 80.00 40.00 2 60 120 240 A 40.00 120.00 80

4 Lighting control system installation 20 Nos 10.00 10.00 2 30 60 20 A 10.00 60.00 10

5 Emergency Light Fixtures installation 119 Nos 72.00 47.00 2 60 120 238 A 47.00 120.00 94 Paritial clearance

6 Fire Alarm points 119 Nos 74.00 45.00 2 30 60 119 A 45.00 60.00 45

7 THIRD FLOOR DRS Call station 3 Nos 2.00 1.00 2 30 60 3 A 1.00 60.00 1

8 CCTV points 19 Nos 3.00 16.00 2 30 60 19 A 16.00 60.00 16 Sub Contractor

9 Access Control Points 19 Nos 15.00 4.00 2 45 90 28.5 A 4.00 90.00 6 Sub Contractor

10 Socket installation 318 Nos 220.00 98.00 2 20 40 212 A 98.00 40.00 65.3333333333333

11 Switch Installation 46 Nos 35.00 11.00 2 20 40 30.6666666666667 A 11.00 40.00 7.33333333333333

12 LED screen socket installation 30 Nos 0.00 30.00 2 35 70 35 A 30.00 70.00 35

13 UPS Installation 1 Nos 1.00 0.00 3 180 540 9 C 0.00 540.00 0

1 Light Fixtures Installation 312 Nos 0.00 312.00 3 60 180 936 A 312.00 180.00 936 Paritial clearance

2 Strip light Installation 2910 Mtrs 0.00 2,910.00 2 30 60 2910 A 2,910.00 60.00 2910

3 Driver installation and looping 300 Nos 0.00 300.00 2 60 120 600 A 300.00 120.00 600

4 Lighting control system installation 21 Nos 0.00 21.00 2 30 60 21 A 21.00 60.00 21

5 Emergency Light Fixtures installation 122 Nos 8.00 114.00 22 60 1320 2684 A 114.00 1,320.00 2508

6 Fire Alarm points 140 Nos 24.00 116.00 2 30 60 140 A 116.00 60.00 116

7 DRS Call station 3 Nos 0.00 3.00 2 30 60 3 A 3.00 60.00 3


FOURTH FLOOR
8 CCTV points 19 Nos 3.00 16.00 2 30 60 19 A 16.00 60.00 16 Sub Contractor

9 Access Control Points 13 Nos 2.00 11.00 2 45 90 19.5 A 11.00 90.00 16.5 Sub Contractor

10 Socket installation 487 Nos 10.00 477.00 2 20 40 324.666666666667 A 477.00 40.00 318

11 Switch Installation 73 Nos 8.00 65.00 2 20 40 48.6666666666667 A 65.00 40.00 43.3333333333333

12 Accessories inside floor box in all floors 84 Nos 30.00 54.00 2 30 60 84 A 54.00 60.00 54

13 UPS Installation 1 Nos 0.00 1.00 3 180 540 9 A 1.00 540.00 9

20 Containment for AV/IICT 65 Mtrs 0.00 65.00 2 35 70 75.8333333333333 C 65.00 70.00 75.8333333333333

1 CCTV points 4 Nos 2.00 2.00 2 35 70 4.66666666666667 A 2.00 70.00 2.33333333333333 Sub Contractor

2 Access Control Points 2 Nos 0.00 2.00 2 40 80 2.66666666666667 A 2.00 80.00 2.66666666666667
ROOF FLOOR
3 Installation of Copper tape for lightning protection 180 Mtrs 0.00 180.00 2 30 60 180 A 180.00 60.00 180 Material required by ABC

4 Installation of air terminal for lightning protection 1 Nos 0.00 1.00 2 120 240 4 A 1.00 240.00 4
118206.666666667 14822.6666666667
NOTE: 74.11 For 25 man power (days)
Dates can be provided based on the civil clearance to do the final fix
1 376.83 Sub Contractor
and the delivery of the ordered materials
2 Any additional works to be done which has been notified to main contractor, but reply not received not included. 14,445.83
3 T&C not included. 72.23 For 25 man power (days)

You might also like