ENG044-20ERW-000-EL-REQ-0001 - RFQ For Fab Building
ENG044-20ERW-000-EL-REQ-0001 - RFQ For Fab Building
ENG044-20ERW-000-EL-REQ-0001 - RFQ For Fab Building
TITLE
This document is issued pursuant to an Agreement between Petrofac Facilities Management Limited and Zallaf Libya Exploration and Production Oil & Gas
Company which agreement sets forth the entire rights, obligations and liabilities of those parties with respect to the content and use of the report. Reliance by
any other party on the contents of the document shall be at its own risk. Petrofac makes no warranty or representation, expressed or implied, to any other party
with respect to the accuracy, completeness or usefulness of the information contained in this report and assumes no liabilities with respect to any other party’s
use of or damages resulting from such use of any information, conclusions or recommendations disclosed in this document.
PROJECT: PROJECT NO: CLIENT: DOCUMENT NUMBER:
NC-200 ERAWIN FIELD ENG044- ZALLAF ENG044-20ERW-000-EL-REQ-
DEVELOPMENT 20ERW 0001-000
DOCUMENT TITLE: ORIGINATOR: REV: DATE: PAGE NO:
MATERIAL REQUISITION FOR PETROFAC 01 10/06/2021 2 of 12
PREFABRICATED BUILDINGS
HOLDS
Hold No. Section Description
ABBREVIATIONS
Abbreviation Description
INQUIRY PURCHASE REQUISITION
TOTAL
DESCRIPTION
PRICE
Client Zallaf Libya for Exploration and Production of Oil and Gas
(ZLOG)
Project NC-200 Erawin Field Development
Technical Notes:
1. Container Supplier shall refer to ‘Building Works Scope Split Matrix attached with the
Requisition for Engineering, Supply & Installation. The details mentioned in the Matrix are
minimum requirements. It is Supplier’s responsibility to ensure that all the necessary Hardware,
Engineering, Supply & Installation not explicitly mentioned in the Matrix but required to meet
the functionality as per Requisition and its attachments are included in Container Supplier’s
scope.
2. All the electrical and instrument free-issued items shall be shipped to SUPPLIER works during
execution. It is SUPPLIER’s responsibility to store / preserve the received equipment’s in safe
and controlled environment till the time these free issued items are installed on the module.
Installation of the free issued equipment’s inside the pre-fabricated building shall be done at
SUPPLIER’s works.
3. Inter-panel cables running within the container shall be provided by SUPPLIER. Inter panel
cables shall be installed & terminated by SUPPLIER based on interconnection drawings.
4. Cable entries shall be through Fire Rated Multi Cable Transit (MCT). Details of the cables
required for MCT sizing shall be confirmed during detailed engineering by CONTRACTOR.
5. Single point supply will be provided by PURCHASER. All further distribution of power shall be
by SUPPLIER. Distribution boards required such as lighting and small power system, F&G
system, Fire extinguishing control panel, HVAC system etc. shall be by SUPPLIER.
6. Earthing system comprising of earth grid conductors, earth bars, panel earthing, cable system
earthing, for modularized container shall be by SUPPLIER. The earthing grid shall be
connected to 2nos. of earth-bars provided at diagonally opposite corners of the container.
PURCHASER will connect these earth-bars to plant earth grid and/or earth-pit.
7. The external walls of container shall be suitable for 2 hours Fire rating.
8. Design life of Modularized container & all equipment supplied shall be 30 years.
9. Anchor Bolts required on foundation will be supplied by Purchaser. Design and calculation of
Anchor bolts shall be provided by Modularized Container Building supplier.
10. Storage cabinet, key holder box, safety kit, etc. as applicable shall be provided by SUPPLIER
as per Scope Matrix.
11. All antistatic rubber mats of relevant voltage to be laid in front of switchboard panels shall be
included in SUPPLIER’s scope.
12. 3D model of modularized container with equipment shall be provided by supplier.
13. HVAC system complete with DB, Control panel, cables, terminations, etc shall be provided by
supplier.
14. Supplier to provide foundation loading plan, base plate details along with dia and location of
Anchor bolts.
15. Supplier to design the Anchor bolts based on the Anchor bolt standard drawing provided by
PIL (Advance copy is attached). Alternative J type bolt / Anchor fastener can be used upon
approval.
16. SUPPLIER shall furnish drawings and documents after award, which shall include following as
a minimum:
a. Electrical terminations & Interconnection diagram.
b. Construction drawings and details.
c. Equipment list.
d. Electrical / Instrument equipment locations, cable routing & cable ladder layout.
e. Electrical cable schedule, DB Schedules, Utility Schedule (Supplier’s scope)
f. Prepare test & start up documents & procedures
g. Prepare pre-commissioning, commissioning, operation & maintenance manuals.
The following documents and confirmation, as a minimum, shall be submitted along with the offer:
Sr.
Title Check-list
No.
A Inquiry Requisition
Duly filled in inquiry requisition with prices for each Included
A.1
line item Not Included
B Technical Documents
Confirmation that all clauses of the specifications are Complies to Specifications
being complied with. In the event the offer deviates Deviation List Enclosed
from any of the applicable clauses, the relevant
clauses and the specific deviation shall be listed in
B.1 the deviation list.
In the absence of a specific deviation list, it shall be
presumed that the entire technical requirements
specified in this inquiry and other attachments are
being complied with.
Engineering Drawings to be submitted along with the Included
offer: Not Included
a) General Arrangement drawings with
dimensional/ weight details of the offered items
b) Loading data for foundation design including
anchor bolt size/location
c) Type Test reports for the equipment’s supplied
B.2 by Modularized Substation supplier.
d) Sub-supplier List for the equipment’s supplied by
Modularized Substation supplier.
e) List of spare parts for Commissioning/Pre-
commissioning for each equipment per
substation.
f) List of special tools for each equipment per
substation
C Manufacturing Capabilities
REFERENCE DOCUMENTS:
The following drawings and documents shall be referred for preparation of the offer:
Annexure:
Attachments:
Sr. Rev.
Document Number Document Title
No.
A Electrical
A.1 Design Basis
ENG044-20ERW-000-EL-BOD- Amendment to Electrical Design Basis 02
A.1.1
0001-000-02 413060-16086-000-EL-BOD-0001-000
413060-16086-000-EL-BOD-0001- 02
A.1.2 Electrical Design Basis
000-02
ENG044-20ERW-000-EL-SPC- 01
A.1.3 Specification for Prefabricated Buildings
0011-000
A.1.4 Internal document Building Scope Matrix 01
A.2 Layout
ENG044-20ERW-002-EL-DAL- Electrical Substation Layout for 00
A.2.1
0001-000 NC-115 Metering Area
A.3 Feeder List
A.3.1 - Feeder List LV Switchboard
A.3.2 - AC UPS Load List
A.4 Single Line Diagram
Sr. Rev.
Document Number Document Title
No.
413060-16086-000-EL-DST-0001- Single Line Diagram - Legend & Electrical 02
A.4.1
000 Symbols
ENG044-20ERW-002-EL-DSL- Key single line diagrams for NC-115 00
A.4.2
0001-001 metering area
413060-16086-000-EL-DSL-0005- 02
A.4.3 Single Line Diagram for Lighting DB(Typical)
001
ENG044-20ERW-002-EL-DSL- Protection and Metering diagram for 6.6kV 02
A.4.4
0004-000 (LATER) breaker panel (NC-115B area)
Protection and Metering diagram for LV 02
ENG044-20ERW-002-EL-DSL-
A.4.5 Switchgear for NC-115 Tag No. NC200-002-
0005-000(LATER)
10-ESW-001 (NC-115B area)
413060-16086-002-EL-DSL-0001- 02
A.4.6 Single Line Diagram 230V AC UPS NC-115
001 to 002
413060-16086-000-EL-DSL-0006- Single Line Diagram for Emergency Lighting 02
A.4.7
005 DB (Typical)
413060-16086-000-EL-DSL-0007- Single Line Diagram for Indoor Lighting & 02
A.4.8
001 Small Power DB (Typical)
413060-16086-000-EL-DSL-0006- Single Line Diagram for Power DB Type-1 02
A.4.9
001 (Typical)
413060-16086-000-EL-DSL-0006- Single Line Diagram for Power DB Type-2 02
A.4.10
002 (Typical)
413060-16086-000-EL-DSL-0006- Single Line Diagram for Power DB Type-3 02
A.4.11
003 (Typical)
413060-16086-000-EL-DSL-0006- Single Line Diagram for Power DB Type-4 02
A.4.12
004 (Typical)
A.5 Specification
413060-16086-000-EL-SPC-0002- 02
A.5.1 Specification for LV Switchboard
000
413060-16086-000-EL-SPC-0009- 02
A.5.2 Specification for LV Distribution Board
000
413060-16086-000-EL-SPC-0011- 02
A.5.3 Specification for MV & LV Cable
000
413060-16086-000-EL-SPC-0015- Specification for Electrical Protection, 02
A.5.4
000 Metering and Interlocking System
413060-16086-000-EL-SPC-0001- Specification for MV Switchboard and MV 02
A.5.5
000 Ring Main Unit
413060-16086-002-EL-SPC-0001- 02
A.5.6 Specification for AC UPS
000
A.6 Data Sheet
413060-16086-000-EL-DAS-0005- 02
A.6.1 Data Sheet for AC UPS System
000
413060-16086-000-EL-DAS-0003- 01
A.6.2 Data Sheet for LV Switchboard
000
413060-16086-000-EL-DAS-0011- 02
A.6.3 Data Sheet for Distribution Board
000
Sr. Rev.
Document Number Document Title
No.
ENG044-20ERW-000-EL-DAS- 00
A.6.4 Data Sheet for HV Switchboard
0003-000
B Instrument
413060-16086-000-IC-BOD-0001- 02
B.1 Control and Automation Design Basis
000
Amendment to Control and Automation
ENG044-20ERW-000-IC-BOD-
B.2 Design Basis 413060-16086-000-IC-BOD-
0001-000
0001-000
413060-16086-000-IC-SPC-0010- 02
B.3 Specification for Fire & Gas Instruments
000
ENG044-20ERW-000-IC-DBD- 00
B.4 Overall Control System Block Diagram
0001-000
413060-16086-002-IC-DAS-0003- 02
B.5 Data Sheets for Fire & Gas Instruments
000
B.6 ENG044-20ERW-002-IC-DAL- Metering Control Room (MCR) 00
0001-000
C Safety & Risk
413060-16086-000-SR-PHL-0001- HSE Design & Loss Prevention Philosophy
C.1
000-03 413060-16086-000-SR-PHL-0001-000-03
ENG044-20ERW-000-SR-PHL- Amendment to HSE Design & Loss 02
C.2
0001-000 Prevention Philosophy
413060-16086-000-SR-PHL-0002- 02
C.3 Fire & Gas Detection and Alarm Philosophy
000
Amendment to Fire & Gas Detection and
ENG044-20ERW-000-SR-PHL-
C.4 Alarm Philosophy 413060-16086-000-SR-
0003-000
PHL-0002-000
413060-16086-000-SR-PHL-0003- 03
C.5 Active & Passive Fire Protection Philosophy
000
Amendment to Active & Passive Fire
ENG044-20ERW-000-SR-PHL-
C.6 Protection Philosophy 413060-16086-000-
0002-000
SR-PHL-0003-000
General Engineering Specification 00
C.7 GES H.01
Fire and Gas Alarm Systems
General Engineering Specification 00
C.8 GES J.24
Fire and Gas Instrumentation
D HVAC
413060-16086-000-ME-SPC- 02
D.1 Specification for HVAC System
0004-000
E CIVIL
413060-16086-000-CI-BOD-0001- 02
E.1 Civil Design Basis
000
ENG044-20ERW-000-CI-BOD- Amendment to Civil Design Basis 413060- -
E.2
0001-000 16086-000-CI-BOD-0001-000
Sr. Rev.
Document Number Document Title
No.
413060-16086-000-CI-SPC-0001- 02
E.3 Civil Specifications
000
XXYYY-ZZZZZ-000-ST-DTE- General Notes, Abbreviations and Legends 00
E.4
0001-001 for Structural steel works
XXYYY-ZZZZZ-000-ST-DST- 00
E.5 Standard Details of Anchor Bolt Assemblies
0001-001
General Engineering Specification 00
E.6 Q.14 (for Reference only)
Design Loads for Structures
F Metallurgy
413060-16086-000-ML-SPC-0001- 02
F.1 Painting and Coating Specification
000
G Telecom
413060-16086-000-TE-PHL-0001- 02
G.1 Telecom Philosophy
000
ENG044-20ERW-000-TE-PHL- Amendment to Telecom Philosophy 413060-
G.2
0001-000 16086-000-TE-PHL-0001-000
413060-16086-006-TE-DBD-0001- 02
G.3 Telecom Overall Block Diagram
000
Amendment to Telecom Overall Block
ENG044-20ERW-000-TE-DBD-
G.4 Diagram 413060-16086-006-TE-DBD-0001-
0001-000
001