EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Pipe Supports: 50 mm
A3 AD-036711
Beams: 5 mm
Columns (except pipes): 25 mm
Angles: 25 mm
The minimum required number of concrete test cylinders shall be 1 for 3 AD-036711 &
A4
days of age, 1 for 7 days of age and 2 for 28 days of age. AC-036915
Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
The bolts for the support of shell-and-tube heat exchangers and the area SAES-B-006
A12
within 30mm of the bolts, shall not be fireproofed. Sec. 5.3.4
Wire mesh shall be provided in all fireproofing concrete. The wire mesh
A13 shall be either 4" x 4" - 10 GA. X 10 GA (SAMSS 12-743-625) or 2" x 2" - AD-036711
14GA x 14 GA (SAMSS 12-743-620).
Horizontal beams in contact with a process heater floor or shell shall not
SAES-B-006
A16 be fire-proofed; All beams below the process heater and not in contact
Sec. 5.4.2
with it shall be fireproofed.
Cantilevers, bracing, and dummy supports shall be fireproofed when any SAES-B-006
A18
attached members are fireproofed. Sec. 5.5.5
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-B-006 -- Fireproofing for Plants, 30 June 2003
2- SAES-Q-001 -- Criteria for Design and Construction of Concrete Structures, 29 October 2002
3- AD-036711 -- Concrete Fireproofing for Structural Members, 09 May 1995
4- AC-036915 -- Details: Fireproofing Specifications for Columns and Vessel Skirts, 07 Feb 1999
Page 2 of 2