Saic Q 1039

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.

Rev. 2018.03.00 31-Mar-18


SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Sub-grades, Elevation and Surface Preparation Inspection SAIC-Q-1039 14-May-18 CIVIL -
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SATIP-Q-006-02
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Where existing sub-grade materials have a CBR of 5 or less, a sub-


base with a minimum CBR of 15 shall be provided with a minimum
thickness of 20 cm. (CBR shall be as determined by ASTM D1883 at SAES-Q-006
A1
95% compaction according to ASTM D1557 or AASHTO T180.) Such Sec. 4.3
subbase cannot be considered an MOT Subbase Class A or B unless it
meets the requirements defined in Tables 4, 5 and 6.

Conventional Pavements shall comply with the following layer


thicknesses:
Min. Thickness of Combined Asphalt
Base Course and Wearing Course
SAES-Q-006
A2 Min. Thickness of With Aggregate With Aggregate Sec. 4.5
Pavement
Aggregate Base Base Course Base Course Class Table 4
Category
Course Class A/B Class B A

Residential Streets 15 CM 8 CM 5 CM
Access Roadways 15 CM 9 CM 6 CM
Pavements including a Foamed Asphalt Stabilized Base Course shall
comply with the following layer thicknesses:
Pavement Min. Thickness of Foamed Thickness of Asphalt
SAES-Q-006
A3 Category Asphalt Stabilized Base Wearing Course Sec. A.1.2
Table A.2
Residential Streets 10 CM 4 CM
Access Roadways 15 CM 4 CM

The sub-grade shall be restored by removing all vegetation, filling all SAES-Q-006
A4
depressions and leveling the surface. Sec. 5.1

Soft and unstable material that will not compact when rolled or tamped
SAES-Q-006
A5 shall be removed and replaced with material approved by the Saudi
Sec. 5.1
Aramco representative.
The entire sub-grade shall be compacted to not less than 95% of the
maximum dry density per (ASTM D1557 or AASHTO T180) while within
SAES-Q-006
A6 1.5% of the optimum moisture content (for cohesive soils) or to 85% of
Sec. 5.1
relative density (ASTM D4253 and ASTM D4254) (for cohesionless
soils).
SAES-Q-006
A7 All holes, ruts, soft places and other defects shall be corrected.
Sec. 5.1
In no case shall the sub-base or base course be placed on soft or SAES-Q-006
A8
unstable material, or over areas that are not drained. Sec. 5.1

If the sub-grade is dusty or muddy, operations shall be delayed until it SAES-Q-006


A9
is in a condition satisfactory to the Saudi Aramco representative. Sec. 5.1

The subgrade shall be constructed so that after being compacted it will


conform to the alignment, grade, and cross-section shown on the
SAES-Q-006
A10 plans, which shall not vary by more than +6 mm as measured with a 3
Sec. 5.1
m straight edge, and as required by the Project construction
specification.

Saudi Aramco: Company General Use


Where rolling of the sub-grade is required, areas which are
SAES-Q-006
A11 inaccessible to a roller shall be compacted either by a mechanical or
Sec. 5.1
hand tamper meeting the approval of the Saudi Aramco representative.

The sub-grade shall be checked and approved by the Saudi Aramco


SAES-Q-006
A12 representative prior to starting construction of the sub-base or base
Sec. 5.1
course on any portion of the work.

The sub-grade shall be kept drained during the placing and compaction SAES-Q-006
A13
of the base course or sub-base surface. Sec. 5.1

The finished sub-grade shall be maintained in a smooth and compacted


SAES-Q-006
A14 condition until the sub-base, base course and surface course are
Sec. 5.1
placed.

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-Q-006 -- Asphalt and Sulfur Extended Asphalt Concrete Paving,18 February 2018

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
Saudi Aramco: Company General Use