Orque Rench Anual
Orque Rench Anual
Orque Rench Anual
MANUAL
Gates Closed Gates Open Side View
Benefits
• Extends life of drillpipe
• Eliminates need of manual tongs
• Precise accurate torque with each
connection
• Safer to operate over manual tongs
• Easy to install
DESCRIPTION
Table A
Specifications
English Metric
Weight (including hanger) 2,250 lb 1.219 kg
Size range (tool joint diameter) 2-7/8 thru 8-1/2 in. 73 thru 216 mm
Makeup torque 63,000 ft-lb 83.428 N.m
Breakout torque 75,000 ft-lb 101.700 N.m
Normal operating pressure 2000 psi 13,79 MPa
Hydraulic power requirements 38-45 GPM to 1500 psi and 8,6 to 10,2m3/h to 10,33 MPa and 1,1
(Close center systems) 5-15 GPM from 1500 to 2000 psi to 3,3 m3/h from 10,33 to 13,79 MPa
Vertical positioning system
Stroke (vertical travel) 72 in. 1,83m
Rate of travel 2-in./sec 50 mm/sec
Cycle time (@ 40 GPM)
Clamping both jaws 2.5 sec maz
Clamping upper jaw 1.25 sec max
Torquing 34 degrees 2.0 sec max
English Metric
Power Requirements 38 to 45 GPM to 1500 psi and 5 8, 6-10, 2 m3/h to 10,33 MPa and 1,1 to
Closed-Center Hydraulic System to 15 GPM from 1500 to 2000 psi 3,3 m3/h from 10,33 to 13,79 MPa
Filtration 25 micron 25 micron
Maximum oil temp 180 deg F 82 deg C
Fluid recommendations Petroleum based industrial hydraulic fluid with additives which provide
oxidation inhibition, anti-rust, anti-foam, deaerating and anti-wear properties
are recommended. The fluid viscosity should be 150-225 SSU (SAE 10W) at
100 deg F (37,9 deg C) with a viscosity index of 90 minimum.
Note
Allow clearance for elevator to work with
torque wrench. Adequate space is required
for elevator latching and unlatching.
a. Check the reservoir of the hydraulic power c. Cycle clamping cylinders, torque cylinders,
supply for sufficient fluid, and then start up. and vertical position cylinder several times to
Hydraulic oil must be clean. verify their proper operation and force any
trapped air from the system.
b. Check entire system for leaks, tighten as
required. d. Recheck fluid level of hydraulic power
supply and top up if necessary.
PAGE 9 OF 35
Figure 8 . TW-63000 Installation (con’t.)
Figure 10 . Upper Gate, Lower Gate, and Piston Jaw Assemblies Installation
1. Align two body halves, swing TW-63000 onto 2. Position TW-63000 vertically so that top of box
tool join and close lower gate. centers between upper and lower clamping jaws.
1. After add-on stand is spun in, pull CLAMP 3. Push CLAMP TOP lever to release pin.
TOP and CLAMP BOTTOM handles.
4. Push TORQUE handle in and hold until
2. Pull TORQUE handle out and hold until upper body is in center position.
preset torque is reached, verify by reading
on torque gauge. 5. Push CLAMP BOTTOM lever to release
box.
1. Push CLAMP TOP lever to release upper 5. Push CLAMP TOP lever to release upper
clamp grip on pin. clamp grip on pin.
2. Push TORQUE lever in and hold until upper 6. Push TORQUE lever in and hold until upper
body is in center position. body is in center position.
3. Pull CLAMP TOP lever to clamp on pin. 7. Push CLAMP BTM lever in to release box.
4. Pull TORQUE lever out and hold until
preset torque is reached, verify by reading
on the torque gauge.
1. Swing TW-63000 onto tool joint and close 6. Push TORQUE lever and hold until upper
both gates. body stops rotating.
2. Adjust height as necessary to center joint 7. Push CLAMP TOP lever to release pin.
between upper and lower bodies.
Note
3. Pull CLAMP BOTTOM lever to grip box. Additional untorquing may be required
before spinning out. Repeat steps 4 thru 7 as
4. Pull TORQUE lever and hold until upper
necessary to enable spinout.
body stops rotating.
8. Spinout pin and rack the stand.
5. Pull CLAMP TOP lever to grip pin.
9. Push CLAMP BOTTOM lever to release box.