Industrial Visit at Gujarat Energy Transmission Corporation Limited (GETCO), Navsari
Industrial Visit at Gujarat Energy Transmission Corporation Limited (GETCO), Navsari
Industrial Visit at Gujarat Energy Transmission Corporation Limited (GETCO), Navsari
ACKNOWLEDGEMENT
The first and the most acknowledged is Dr.K.N.Mistry, Principal Sir who was very helpful to
us. As a principal, he has inspired us to arrange industrial visit to Pre final year students. He has
injected us the familiarity and methodology of planning of visit. Not only that as giving the
permission of industrial visit, his academic guidance, fairness and responsiveness to kind of
queries remains him as a role model, there of we are extending our gratitude to Dr.K.N.Mistry,
Principal Sir.
Introduction:
Gujarat Energy Transmission Corporation Limited (GETCO) was set up in May 1999 and is
registered under the Companies Act, 1956. The Company was promoted by erstwhile Gujarat
Electricity Board (GEB) as its wholly owned subsidiary in the context of liberalization and as a
part of efforts towards restructuring of the Power Sector.
As a part of the ongoing reforms process in the state power sector, in the year 2003, the
Government of Gujarat under the provisions of Gujarat Electricity Industry (Re-Organization &
Regulation) Act, 2003 framed the Gujarat Electricity Comprehensive Transfer Scheme, 2003 (the
Transfer Scheme) vide Government Notification No: GHU-2003-58-GEB-3537–K dated the 24th
October, 2003. The Government of Gujarat issued Notification No. GHU-2004–99-GEB-1104-
7318-K dated the 31st December 2004, notifying the Provisional Opening Balance Sheet as on
31st March 2004 of the Six Transferee Companies containing the value of assets and liabilities
transferred from erstwhile Gujarat Electricity Board (GEB) to the Transferee Companies. Assets
of the Board were dis-aggregated into six companies – One each in Generation and
Transmission and Four in Distribution. As a part of the above exercise, all the generation plants
of GEB have been transferred to GSECL, which was a company already, existing since 1993.
Subsequently, the Government of Gujarat vide Notification dated 31st March, 2005 notified
that pursuant to the Transfer Scheme, the effective date for the transfer of assets, liabilities,
proceedings and personnel be further extended to 1st April, 2005. A holding company, Gujarat
Urja Vikas Nigam Limited (GUVNL), has been also been formed. Apart from co-ordination
functions, GUVNL is also handling Trading and Bulk Supply functions.
A Single Line Diagram (SLD) of an electrical system is the line diagram of the concerned
electrical system which includes all the required electrical equipment connection sequence
wise from the point of entrance of power up to the end of the scope of the mentioned work.
lightning arrestor, C.T/P.T unit, isolators, protection and metering P.T. and C.T. circuit breakers,
again isolators and circuit breakers, main power transformer, all protective devices/relays and
other special equipment like CVT, GUARD RINGS, etc. as per design criteria.
A Single Line Diagram (SLD) of an Electrical System is the Line Diagram of the concerned
Electrical System which includes all the required electrical equipment connection sequence
wise from the point of entrance of Power up to the end of the scope of the mentioned Work. As
in the case of 132KV Substation, the SLD shall show Lightening Arrestor, C.T/P.T Unit, Isolators,
Protection and Metering P.T & C.T. Circuit Breakers, again Isolators and circuit Breakers, Main
Power Transformer, all protective devices/relays and other special equipment like CVT, GUARD
RINGS, etc as per design criteria. And the symbols are shown below. There are several feeders
enter into the substation and carrying out the power. As these feeders enter the station they
are to pass through various instruments.
1 FEEDER CERCUIT:
1. Lightening arrestors;
2. CVT;
3. Wave trap;
5. Current transformer;
6. Circuit breaker;
8. BUS;
2 TRANSFORMER CIRCUIT:
i) HV side:
2. Current transformer
3. Circuit breaker
4. Lightning Arrestors
ii) LV side:
1. Lightening arrestors
2. Bus
3. Current transformer
5. Circuit breaker
4. Bus Isolator.
The major stations include a control room from which operations are coordinated. Smaller
distribution substations follow the same principle of receiving power at higher voltage on one
side and sending out a number of distribution feeders at lower voltage on the other, but they
serve a more limited local area and are generally unstaffed.
The central component of the substation is the transformer, as it provides the effective in
enface between the high- and low-voltage parts of the system.
Sr. Name of Taluka Dist Date of No. of BUS Details Max. Power Capacit Max. load (in
No sub- commi. bays load transfor y in MVA)
. station (voltage Volt Type of mer MVA X'mer s/s
class cond. each (Voltage
wise) Bus ratio
(Incl. in wise in
Capacitor MW KV)
, PT, bus
coupler
bays etc.)
Navsari Transmission Division
1 220KV Navsari Navsari 04.04. 220kv-17 220kv Twin 750 220/66kv 50 37.67 146.6
Navsari 67 moose 50 40.78 7
100 71.33
132kv-08 132kv Twin 156 220/132k 100 70.77 173.3
moose v 100 78.00 3
100 77.73
66kv-13 66kv Twin 132 66/11kv 15 11.11 28.19
moose 15 11.56
10 7.22
2 220KV Navsari Navsari 27.03. 220kv-08 220kv Twin 315 220/66kv 100 63.10 93.6
AMBHETA 99 Zebra
(CHIKHLI) 66kv-09 66kv Twin 90 220/66kv 50 30.50
Zebra
66/22kv 5 (Stn.Tra.
)
3 66KV Navsari Navsari 31.03. 66kv-05 66kv Panther 11.1 66/11kv 10 6.10 12.35
MAROLI 90 2
66/11kv 10 6.25
4 66KV Navsari Navsari 15.08. 66kv-06 66kv Panther 13.3 66/11kv 10 7.12 14.86
EROO 72 7
66/11kv 10 7.74
5 66KV Navsari Navsari 12.04. 66kv-06 66kv Zebra 25.9 66/11kv 10 5.75 18.56
CHHAPRA 89 1
66/11kv 10 6.15
66/11kv 10 6.68
6 66kv Navsari Navsari 28.03. 66kv-06 66kv Panther 19.5 66/11kv 10 7.56 14.88
Gandevi 71 0 66/11kv 10 7.32
7 66kv Navsari Navsari 15.08. 66kv-07 66kv Panther 13.9 66/11kv 10 7.85 15.44
9 66kv Navsari Navsari 07.11. 66kv-06 66kv Panther 52.3 66/11kv 10 6.94 13.67
Chikhli 88 66/11kv 10 6.73
10 66kv Navsari Navsari 14.03. 66kv-04 66kv Panther 9.60 66/11kv 10 5.05 10.10
Khergam 94 66/11kv 10 5.05
11 66kv Navsari Navsari 20.08. 66kv-04 66kv Panther 30.1 66/11kv 10 5.84 5.84
Tankal 06
12 66kv Navsari Navsari 06.08. 66kv-06 66kv Panther 27.5 66/11kv 10 6.10 11.99
Anaval 87 66/11kv 10 5.89
13 66kv Vyara Tapi 16.01. 66kv-05 66kv Panther 10.3 66/11kv 10 6.83 11.52
Dolwan 90 7 66/11kv 5 4.69
14 66kv VANSAD Navsari 02.03. 66kv-06 66kv Panther 18.6 66/11kv 5 4.23 10.82
Vansada A 90 5 66/11kv 10 6.60 0
15 66kv AHWA DANG 19.02. 66kv-05 66kv Panther 9.90 66/11kv 5 2.90 5.76
Waghai 66 66/11kv 5 2.86
16 66kv AHWA DANG 27.02. 66kv-04 66kv Panther 4.86 66/11kv 5 2.65 5.40
Ahwa 99 66/11kv 5 2.75
17 66KV CHIKHLI Navsari 02.02. 66kv-04 66kv Panther 16.6 66/11kv 10 5.05 5.05
FADWEL 08
18 66KV Navsari Navsari 09.08. 66kv-04 66kv Moose 9.81 66/11kv 10 5.32 10.90
Navsari 08
CITY 66/11kv 10 5.58
19 66kv Navsari Navsari 23.09. 66kv-03 66kv Zebra 3.01 66/11 10 3.35 3.35
SINGOD 09
20 66Kv AHWA DANG 20.01. 66/11 10 66kv Saputara
SAPUTAR 09 comm. As
A switching s/s as
on 22.01.10, but
11kv feeders load
not taken by
DGVCL
Faculty Detail:
Miss.Dharmishtha T Patel
Student’s details:
Date: 04.02.2017
Venue:
Group Photo of all the students, Faculties of GIDC Degree College, Abrama & Engineers
of GETCO,navsari
Feedbacks:
It is great experience of GECTCO, Navsari Visit involves on field working and live inspections
of Power system switchgears like CT, PT, Breakers, isolators, Transormesrs, PLCC, Bus bar
systems, Earthling Switch. It will help to final year students to understand practical Explorer of
220 kv Receiving substation and it’s working. Also it will good the information about controlling
room, battery room and relay system for different kinds of power system faults and their
control.
4. Student-
5. Student-
Ankur P Desai
Assitant Professor,