Daily Progress Report: Infrastructure Development of Qurtaba City, Chakri, Rawalpindi

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 12

Daily Progress Report

Date: Monday, May 3, 2021


Project Title: Infrastructure Development of Qurtaba City, Chakri, Rawalpindi Weather: SUNNY
Site Location: Rawalpindi Contractor: M/s HSSR Consultant: M/s Techno Legal Consultants (Pvt) Ltd.
Yesterday Works Detail
1) Today Activities at site
Location Target Manpower
Total
Sr. # Activity ID Activity Description Planned Units Achieved/N Tentative Time
Zone Section Quantity Skilled Un-Skilled
ot

1 Mixing Sub-base (R/S) 20+00~25+00 MR-2 Achieved 2

2 Steel Fixing (L/S) 12+00~17+00 MR-2 Achieved 4 3

3 Steel Fixing + Formwork (B/S) 82+12~76+00 MR-2 Achieved 4 7


Mixing + Levelling + Compaction Sub- Base
4
2nd Layer
20+00~25+00 MR-2 Achieved 3

5 Dumping + Spreading 4+00~8+00 MR-2 Achieved 2

Yesterday Works Detail


2) Yesterday Activities at site
Location Target Manpower
Total
Sr. # Activity ID Activity Description Planned Units Achieved/N Remarks
Quantity
Zone Section ot Skilled Unskilled

1 Levelling Sub- base 1st Layer 66+00~68+00 Achieved 3

2 Concrete Drain Bed 79+00~82+00 Achieved 3 4

3 Electrical Conduiting Main Gate In Progress 3

4 Excavation of Duct Block- C In Progress 4

5 Curing (Concrete) Main Gate Daily 1

Sr. Project Manager CRE

Page 1 of 12
Daily Progress Report
3) Status of Plant & Equipment

Please attach page separately duly initialled.

4) Status of Manpower

Please attach page separately duly initialled.

5) Bottlenecks / Problems
Sr. # Description Responsibility of Decision
1 Designs of OFC, Gas & Electric works are held up in Block C,D TLC / Consultant
2 Electric Design for Access Road Light pole Requires
3 Location of Mini Gate ( Revision Letter already forwaded)
4

Sr. Project Manager CRE

Page 2 of 12
Daily Progress Report
Date: Monday, May 3, 2021
Project Title: Infrastructure Development of Qurtaba City, Chakri, Rawalpindi Weather: SUNNY
Site Location: Rawalpindi Contractor: M/s HSSR Consultant: M/s Techno Legal Consultants (Pvt) Ltd.
Yesterday Works Detail
1) Today Activities at site
Location Target Manpower
Total
Sr. # Activity ID Activity Description Planned Units Achieved/N Tentative Time
Zone Section Quantity Skilled Un-Skilled
ot

1 Watering of Plants Phase-1 Access Road Daily Basis 2

2 Grass Cutting Phase-1 Access Road Daily Basis 3

3 Plantation Phase-1 Access Road Daily Basis 5

4 Plants Trimming Phase-1 Access Road Daily Basis 2

5 Goddy Phase-1 Access Road Daily Basis 3

Yesterday Works Detail


2) Yesterday Activities at site
Location Target Manpower
Total
Sr. # Activity ID Activity Description Planned Units Achieved/N Remarks
Quantity
Zone Section ot Skilled Unskilled

1 Drain (Center Line) 8+00~20+00 MR-2 Achieved 4

2 Survey + Layout 9+00~29+00 MR-3 Achieved 3

LN-18,ST-
3 NSL Taken 16,17
Block - G Achieved 4

4 Cutting / Filling 13+50~17+00 MR-1 in progress 4

5 Kerb Stone (Filling & Paint) Access Road in Progress 6

Sr. Project Manager CRE

Page 3 of 12
Daily Progress Report
3) Status of Plant & Equipment

Please attach page separately duly initialled.

4) Status of Manpower

Please attach page separately duly initialled.

5) Bottlenecks / Problems
Sr. # Description Responsibility of Decision
1
2
3
4

Sr. Project Manager CRE

Page 4 of 12
Daily Progress Report
Date: Monday, May 3, 2021
Project Title: Infrastructure Development of Qurtaba City, Chakri, Rawalpindi Weather: SUNNY
Site Location: Rawalpindi Contractor: M/s HSSR Consultant: M/s Techno Legal Consultants (Pvt) Ltd.
Yesterday Works Detail
1) Today Activities at site
Location Target Manpower
Total
Sr. # Activity ID Activity Description Planned Units Achieved/N Tentative Time
Zone Section Quantity Skilled Un-Skilled
ot

1 Concrete Curing (Drain) MR-2 1

2 Drain Formwork MR-2 3 2

3 Cutting & Filling LN-56 Block - A In Progress 3

4 Kerb Stone Factory Daily Basis 12

Yesterday Works Detail


2) Yesterday Activities at site
Location Target Manpower
Total
Sr. # Activity ID Activity Description Planned Units Achieved/N Remarks
Quantity
Zone Section ot Skilled Unskilled

1 Sewer Factory Daily Basis 8

2 Cutting & Bending Steel for Drain Daily Basis 6

3 Batching Plant Daily Basis 9

4 Clearing of Site Access Road 3

Sr. Project Manager CRE

Page 5 of 12
Daily Progress Report
3) Status of Plant & Equipment

Please attach page separately duly initialled.

4) Status of Manpower

Please attach page separately duly initialled.

5) Bottlenecks / Problems
Sr. # Description Responsibility of Decision
1
2
3
4

Sr. Project Manager CRE

Page 6 of 12
Daily Progress Report
Date: Monday, May 3, 2021
Project Title: Infrastructure Development of Qurtaba City, Chakri, Rawalpindi Weather: SUNNY
Site Location: Rawalpindi Contractor: M/s HSSR Consultant: M/s Techno Legal Consultants (Pvt) Ltd.
Today Works Detail
1) Today Activities at site
Location Total Executed in Executed Manpower
Sr. # Activity ID Activity Description Units Tentative Time
Zone Section Quantity Period Todate Skilled Un-Skilled

1 Traversing Start Zone - 1 3

2 Cutting NSL Taken Block - A 3

3 Dumping 2nd Layer 66+00~68+00 MR-2 2

4 Dumping 69+50~71+00 MR-2 2

5 Levelling 16+00~20+00 MR-2 2

Today Works Detail


2) Yesterday Activities at site
Location Manpower
Total Executed in Executed
Sr. # Activity ID Activity Description Units Remarks
Quantity Period Todate
Zone Section Skilled Unskilled

1 Bed Concrete 76+00~82+12 MR-2 3 5

2 Duct Excavation Block - C 4

3 Electrical Conduiting Main Gate 3

4 Drain Concrete 75+00~79+00 MR-2 3 5

5 Cutting & Filling MR-1 3

Sr. Project Manager CRE

Page 7 of 12
Daily Progress Report
3) Status of Plant & Equipment

Please attach page separately duly initialled.

4) Status of Manpower

Please attach page separately duly initialled.

5) Bottlenecks / Problems
Sr. # Description Responsibility of Decision
1
2
3
4

Sr. Project Manager CRE

Page 8 of 12
Daily Progress Report
Date: Monday, May 3, 2021
Project Title: Infrastructure Development of Qurtaba City, Chakri, Rawalpindi Weather: SUNNY
Site Location: Rawalpindi Contractor: M/s HSSR Consultant: M/s Techno Legal Consultants (Pvt) Ltd.
Today Works Detail
1) Today Activities at site
Location Total Executed in Executed Manpower
Sr. # Activity ID Activity Description Units Tentative Time
Zone Section Quantity Period Todate Skilled Un-Skilled

1 Cutting & Filling Block G 3

2 formwork Drain Access Road 6

3 Material shifting Kerb Stone Access Road 6

4 Curing Main Gate 1

5 Plaster Work Main Gate 2 3

Today Works Detail


2) Yesterday Activities at site
Location Manpower
Total Executed in Executed
Sr. # Activity ID Activity Description Units Remarks
Quantity Period Todate
Zone Section Skilled Unskilled

Sr. Project Manager CRE

Page 9 of 12
Daily Progress Report
3) Status of Plant & Equipment

Please attach page separately duly initialled.

4) Status of Manpower

Please attach page separately duly initialled.

5) Bottlenecks / Problems
Sr. # Description Responsibility of Decision
1
2
3
4

Sr. Project Manager CRE

Page 10 of 12
DAILY MANPOWER & T/P REPORT

Project: Development of Qurtaba City Chakri


Client: MADINA TUL ILM
Consultant: TLC
Contractor: HSSR

S.No Staff & Labour Qty S.No Equipments / Machinery Qty

1 Senior Project Manager 1 1 Dozer 2

2 Project Manager 2 2 Motor Grader 3


Construction
3 1 3 Sheep Foot Roller 3
Manager / CQS
4 Planning Engineer 1 4 Plain Roller 5

5 SQS 1 5 Excavator 4

6 Site Engineer Civil 2 6 Dump Truck 8

7 Electrical Assistant 2 7 Tractor with Trolley 4

8 Site Supervisor 2 8 Trolley 15

9 Chief Surveyor 1 9 Tractor with Bucket 1

10 Survey Section 6 10 Water Bowser Truck 7

11 Finance Manager 1 11 Water Bowser Tank 5

12 Senior Accountant 1 12 Gen 30 KVA 1

13 Project Superintendent 1 13 Gen 5 KVA 3

14 Foreman (Civil) 5 14 Gen 3 KVA 1

15 Purchaser 1 15 Double Cabin 3

16 Lab Technician 2 16 Shehzore 2

17 Store Supervisor 1 17 Suzuki Pick Up 1

18 Store Keeper 1 18 Suzuki Bolan Van 1

19 Store Assistant 1 19 Motor Cycle CD-125 6

Labour/Masons/others 20 Suzuki Jeep Jamni 1

1 Office Boy 1 21 Mixer Machine 3


2 Forman MT 1 22 Bed Compactor 2

3 Mechanic Section 7 23 Steel Bending Machine 1

4 T&P Operators 41 24 Steel Cutting Machine 1

5 Driver LTV 6 25 Vibrator 3

6 Cook 4 26 Mud Pump 2

7 Cook Helper 2 27 Jumper Compactor 1

8 Security Guard 4 28 Air Compressor 1

9 Batching Plant 22 29 Gate Barrier Complete Set. 2

10 Company Labour 14

11 Block Factory 19

12 Drain MR-2 20

13 Drain MR-2 Other Side 10

14 Cutting & Bending Steel 8

14 Access Road (Drain) 31

Total Manpower 223 Total T&P 92