PROJECT DAILY MONITORING SHEET

Contractor: MECHATRENDS CONTRACTORS CORPORATION Date: 4 September ‘21 # of Days:


Project : 2018 TK P1 RECONSTRUCTION Location: PSCPC TAGBILARAN BOHOL

Personnel Qty Equipment Qty Weather Chart


1 Chain block 2
Project In-charge Yellow – Sunny Red - Heavy Rain
2 Level block 2 Orange - Light Rain Blue - Lightning storm
Project Supervisor
1 Sling 4
Safety Officer
1 Vertical clamps 2
QA/QC
Shackles 4
Office Staff
3 Tape line 1
Welder
1 Line yarn/guy line 2
Electrician
3 Welding machine 3
Fitter/Fabricator
Grinder 3
Carpenter / Mason
2 Ball hammer 2
Scaffolder
1 Erection jigs
Equipment Tender
Helper 1
TOTAL 16

Activities
1.) Hauling of Scaffold Materials
2.) Erection of Scaffolding for Gin Pole
3.) Fabrication of Roof Frames (lay-out & cutting & bolt hole drilling of Main Rafter and Secondary Rafter)
4.)
5.)

Accomplishment
1.) Hauling of Materials
2.) Erection of Scaffold for Gin Pole (continuous) 45%
3.) Fabrication of Roof Frames (bolt hole drilling of Main Rafter and Secondary Rafter)
4.)
5.)

Remarks
1.)
2.)

Manpower List
Sn Name Designation Sn Name Designation
01 F. DOROMAL FOREMAN 10 A.ENRIQUEZ TENDER/RIGGER

02 M. DUMAHOD JR. FOREMAN 11 E. ORAPA HELPER

03 B. VILLAVER FITTER/FABRICATOR 12 S. ESPERAS SCAFFOLDER

04 M. MAGSAYO FITTER/SCAFFOLDER 13 J. GUINTO QA/QC

05 E. GELLADO FITTER/FABRICATOR 14 S. MAURICIO CEP

06 J.MABOLOC FITTER 15 C. BAGON SO3

07 J. PONTE WELDER 16

08 R. SALARDA WELDER 17

09 J. SALIBAY WELDER 18

Signatories Name Signature Date


Rhannie M. Garcia 4 September 2021
Project Supervisor
Safety Officer
Chito Bagon (SO3) . 
Ace Montehermoso
TPE