Project Daily Monitoring Sheet: Equipment Qty
Project Daily Monitoring Sheet: Equipment Qty
Project Daily Monitoring Sheet: Equipment Qty
Activities
1.) Hauling of Scaffold Materials
2.) Erection of Scaffolding for Gin Pole
3.) Fabrication of Roof Frames (lay-out & cutting & bolt hole drilling of Main Rafter and Secondary Rafter)
4.)
5.)
Accomplishment
1.) Hauling of Materials
2.) Erection of Scaffold for Gin Pole (continuous) 45%
3.) Fabrication of Roof Frames (bolt hole drilling of Main Rafter and Secondary Rafter)
4.)
5.)
Remarks
1.)
2.)
Manpower List
Sn Name Designation Sn Name Designation
01 F. DOROMAL FOREMAN 10 A.ENRIQUEZ TENDER/RIGGER
07 J. PONTE WELDER 16
08 R. SALARDA WELDER 17
09 J. SALIBAY WELDER 18