REFERENCES
INTRODUCTION
Proserv has been manufacturing control systems in the UK since 1976 and has considerable
experience in subsea production system engineering and subsea control system design.
As the industry technology has advanced into locating much of the production equipment on the
seabed so Proserv has developed control, monitoring and safety shutdown systems which are able to
operate in this equipment either from the surface, or the subsea environment.
Early involvement in the Subsea arena began for Proserv in the 1980’s with the design and prototype
manufacture of our own subsea control module, using our in-house spool-type control valves. These
whilst initially adapted and evaluated for subsea use did not show the degree of durability of the
carbide shear seal type valves used in our subsea control systems today.
A number of subsea hydraulic systems for short step-outs and SSIV controls were made, but it was
the development of our Wellcon multiplexed electronic programmable control modules employing
shear-seal valves that established Proserv presence in the subsea market.
In 1992 our first complete multiplexed Electro-Hydraulic subsea control system was developed and
the first full system deployed the following year.
In 1999 the Artemis subsea control system was developed adding deep water ROV deployment to
the product line.
The inclusion of the Sicom OCC modem technology in 2007 enabled open and high performance
subsea network availability.
In 2014 Proserv launch the latest generation subsea electronics Artemis 2G (A2G) which provides
operators with a reliable, more accessible and flexible system with increase data and power
performance and full compliance with latest SIIS, IWIS, ISO and API specifications
With much more reliance on oil and gas field life extension and brownfield expansion of older field the
Artemis and A2G technology from Proserv now provides an alternative to using the original
Equipment Manufacture with the Augmented Controls Technology (ACT) provided by Proserv subsea
controls technology.
In 2017 the latest OCX modem from Proserv provides greater communication processing, extended
bandwidth and inbuilt configuration tools to provide our solutions with up to 4Mbps data speeds over
distance on powerline copper for use with MPFM instrumentation and subsea video on installations.
PROJECT PROFILES
From
Platform
500 VAC
Power cable
EDU II
Power 12 V DC
supply
5 V DC
1 atm N2
Oil
System A
System B
230 V AC
230 V AC
230 V AC DCM
Project CNR Lyell
Client Framo Engineering / CNR
Completion Date Delivered 2012
Water Depth 200 m
Step out Distance 8.5 km
No. of OCH’s 1
System OCC communication on power line
Intervention Method Diver Installation
Booster Pump Supplier Framo Engineering
Control Method Multiplexed Electro-Hydraulic
Location North Sea – British sector
Open Communication HUB for 1 Subsea Multiplexer system
with Power Line modem Communication, for interfacing of
Scope of Supply process transmitters and control of direct control valves on
the Lyell Subsea Multiphase Booster Pump. Non-redundant
system, topside TPCU rack.
OCH – version with 1 input power and communication and 2
Comments
output/inputs with interfaces to the booster pump.
Project EnQuest Knightsbridge Ardmore
Client EnQuest
Completion Date Currently In Commissioning
Water Depth 90 m
Step out Distance 4 km
No. of SCMs 10
System Artemis
Intervention Method Diver Installation
Xmas Tree Supplier FMC
Control Method Multiplexed Electro-Hydraulic
Location Central North Sea
9 well control system over two umbilicals from the Usi Gorm
Scope of Supply
FPSO
The subsea control system is designed for control and
Comments monitoring on the manifold and Production Xmas Trees
using tree mounted SCMs
Project Valiant Causeway
Client Valiant Petroleum
Completion Date Installed 2012
Water Depth 150 m
Step out Distance 16 km
No. of SCMs 3
System Artemis
Intervention Method Diver Installation
Xmas Tree Supplier Vetco
Control Method Multiplexed Electro-Hydraulic
Location Central North Sea
3 well control system over two umbilicals from the Cormorant
Scope of Supply
Platform
Production wells include ESP in well. Both umbilicals are
installed with 3.5kV power cables in with the controls cables.
Comments Communications is copper rather than fibre based with
signals having to work with the noise generated by the ESP
power cables
Project Statoil Heidrun
Client Statoil
Completion Date October 2011
Water Depth 360 m
Step out Distance 6.2 km
No. of OCH’s 1
No. of SeaHawk’s 2
Open Communication Hub (OCH) with SeaHawk subsea
System
video camera’s connected on the subsea template
Intervention Method ROV Installation
Xmas Tree Supplier FMC Kongsberg Subsea
Control Method Multiplexed Electro-Hydraulic
Location North Sea – Norwegian sector
Provide communication from topside system to the subsea
via broadband DSL communication to an OCH. The OCH
has 4 open power and communication outputs with DSL and
Scope of Supply Ethernet communication, 240 VAC and 24 VDC power.
Delivery of 2 subsea cameras for observation of possible
leakage on template. Special monitoring leak during gas lift
operation.
Comments Achieved bandwidth approx. upto 10 Mb/sec
Project Ithaca Athena
Client Ithaca Energy UK Ltd
Completion Date 2011
Water Depth 132 m
Step out Distance 2 km
No. of SCMs 6
System Artemis
Intervention Method Diver Installation
Xmas Tree Supplier Vetco
Control Method Multiplexed Electro-Hydraulic
Location Central North Sea
Up to 8 well subsea control system with 5 wells developed in
Scope of Supply
the first phase.
Manifold includes a multiphase flowmeter tied back through
Comments the SCS. Compact FPSO turret requires bespoke topside
equipment designs
Project Statoil Åsgard
Client Statoil
Completion Date 2011
Water Depth 280 m
Step out Distance Installed on several templates (5-20 km)
No. of SeaHawk’s 1
SeaHawk subsea video camera connected on the subsea
System
template
Intervention Method ROV Installation
Xmas Tree Supplier FMC Kongsberg Subsea
Control Method Multiplexed Electro-Hydraulic
Location North Sea – Norwegian sector
Provide communication from topside system to the subsea
via broadband DSL communication direct to a SeaHawk
Scope of Supply
subsea camera unit for observation of possible leakage on
template.
Comments Achieved bandwidth approx. up to 15 Mb/sec
Common
SeaHawk™
server
Project Chevron Jack & St. Malo
Client MPM / Cameron / Chevron
Completion Date 2011
Water Depth 3050 m
Step out Distance 27 km
No. of OCH’s 4
Open Communication Hub (OCH) with fiber optic and power
System
line communication
Intervention Method ROV Installation
Xmas Tree Supplier Cameron
Control Method Multiplexed Electro-Hydraulic
Location GoM
4 off Subsea Meter Interface module (SMIM) for connection
to 4 MPFM Flowmeters.
4 topside cabinets for power and communication to up to 40
Scope of Supply
MPM flowmeters.
TCS – redundant Topside Controller Station for storage and
data handoff to PAS.
Comm. interface – MPFM:
Ethernet (Modbus over TCP/IP)
Comments Typical comm. Speed on 27 km umbilical:
100 Mbps (fiber) or 40 kbps – modulated on power-
line
Project BG Gaupe
Client BG Group
Completion Date 2011
Water Depth 100 m
Step out Distance 8 km
No. of SCMs 2
System Artemis
Intervention Method ROV Installation
Xmas Tree Supplier Cameron
Control Method Multiplexed Electro-Hydraulic
Location Central North Sea
2 wells in Norwegian waters tied back to a UK platform with
Scope of Supply
subsea distribution and manifolding at it’s base.
Wells include NORSOK standard designs with smart in hole
Comments
multi-zone completions operated from the well SCM
Project GDF Juliet
Client GDF Suez
Completion Date 2011
Water Depth 60 m
Step out Distance 28 km
No. of SCMs 4
System Artemis
Intervention Method Diver Installation
Xmas Tree Supplier Dril-Quip
Control Method Multiplexed Electro-Hydraulic
Location Southern North Sea
Scope of Supply Upgrade EPU and SCM with SUTU and jumpers
Project BG Maria
Client BG International
Completion Date 2006
Water Depth
Step out Distance 12 km
No. of SCMs 3
System Artemis
Intervention Method ROV Guide Wire Running Tool Installation and Intervention
Xmas Tree Supplier Cameron
Control Method Multiplexed Electro-Hydraulic
Location Central North Sea
Topside EPU, HPU Modifications to NW Seymour, TUTU
Subsea Hydraulic and Electrical Jumpers, SCM, SCMMB, SDU,
Subsea Instrumentation
Project includes integration of Framo Multiphase Flow
Comments
Meter.
Project CNR Banff Phase II
DSND later completed by PGS
Client
Operator later changed to CNR
Completion Date 1997 and then extended 2001, and 2004
Water Depth 90 metres
Step Out Distance 2-3 km
No. of SCMs 7
System Wellcon
Intervention Method Diver Installation and Intervention
Xmas Tree Supplier Dril-Quip and FMC
Control Method Multiplexed Electro-Hydraulic
Location North Sea
Hydraulic Power Unit Master Control Station Electronic
Power Unit Test Stands and Test Hydraulic Power Unit
Scope of Supply
Subsea Electro-Hydraulic Distribution Subsea Control
Modules Electro-Hydraulic Jumpers
Extensively extended the Ramform Banff system now has
increased services and the addition of the Kyle control
Comments system. With 24 hydraulic functions for Production and
Injection Well Control the SCMs are the most populated
Wellcon SCM produced
Project Addax Okwori
Client Subsea 7
Completion Date 2006
Water Depth 150 m
Step out Distance 4 km
No. of SCMs 2
System Artemis
Intervention Method Diver Installation and Intervention
Xmas Tree Supplier Vetco
Control Method Multiplexed Electro-Hydraulic
Location West Africa - Nigeria
Topside MCS, EPU, HPU Modifications, TUTU
Hydraulic and Electrical Jumpers, SCM, Subsea Mud Mat
Subsea
and Protective Frame
Comments Each SCM operates two production wells
Project Water Oil Ewing Bank
Client Walter Oil
Completion Date 2005
Water Depth 750 m
Step out Distance 30 km
No. of SCMs 1
System Artemis
Intervention Method ‘Fly to Place’ ROV Guided Installation and Intervention
Xmas Tree Supplier Dril-Quip
Control Method Multiplexed Electro-Hydraulic
Location Gulf of Mexico
Topside MCS, EPU
Subsea SCM, SCMMB
Comments System operates simplex hydraulics and electrical supplies
Project BP Faragon
Client Vetco
Completion Date 2005
Water Depth N/A
Step out Distance N/A
No. of SCMs -
System -
Intervention Method N/A
Control Method N/A
Location Central North Sea
Topside Hydraulic Power Unit
Subsea -
Proserv supply of compact split HPU for location in limited
Comments
footprint on Andrew platform
Project BG North West Seymour
Client BG International
Completion Date 2005
Water Depth
Step out Distance 10 km
No. of SCMs 2
System Artemis
Intervention Method ROV Guide Wire Running Tool Installation and Intervention
Xmas Tree Supplier Cameron
Control Method Multiplexed Electro-Hydraulic
Location Central North Sea
Topside MCS, EPU, HPU, TUTU
Hydraulic and Electrical Jumpers, SUTU, SCM, SCMMB,
Subsea
SDU, Subsea Instrumentation
Later expanded to include Maria system and SCM modified
Comments
for compatibility across systems.
Project DONG Stine
Client DONG
Completion Date 2004
Water Depth
Step out Distance 9.4 km
No. of SCMs 3
System Artemis
Intervention Method Diver Installation and Intervention
Xmas Tree Supplier Cameron
Control Method Multiplexed Electro-Hydraulic
Location Danish Sector North Sea
Topside MCS, EPU, HPU, TUTU
Hydraulic and Electrical Jumpers, SUTU, SCM, SCMMB,
Subsea
SDU, Subsea Instrumentation
ROV intervention on SUTU for installation of jumpers,
Comments
however SCM is diver installed.
Project Talisman Duart
Client Talisman
Completion Date 2006
Water Depth
Step out Distance 9 km
No. of SCMs 1
System Wellcon
Intervention Method Diver Installation and Intervention
Xmas Tree Supplier FMC
Control Method Multiplexed Electro-Hydraulic
Location Central North Sea
Topside MCS Hardware and Software Modifications
Subsea Hydraulic and Electrical Jumpers, SCM
Comments SCM kept compatible across Duart, TNT and Ross fields