Risk Cooling Tower
Risk Cooling Tower
Risk Cooling Tower
Loading &
Work Activity Location: All Assessment Team: Safety Team & Construction Team Approved by Project Mangers
Transportation
RISK RATING
TASK HAZARD CONTROLS Risk Rating After Control
Likely hood
Likely hood
Severity
Severity
Person in Danger Controls Measures and/or Recovery Measures
Risk
Risk
Risk Level
Step Hazard Description & Effect
Description of Task Step Low
No: Medium
High
Low: 1&2, Medium: 3&4, High: 6&9, Risk Rating: Severity X Likely Hood Page 1 /2
Loading &
Work Activity Location: All Assessment Team: Safety Team & Construction Team Approved by Project Mangers
Transportation
RISK RATING
TASK HAZARD CONTROLS Risk Rating After Control
Likely hood
Likely hood
Severity
Severity
Person in Danger Controls Measures and/or Recovery Measures
Risk
Risk
Risk Level
Step Hazard Description & Effect
Description of Task Step Low
No: Medium
High
4 vertigo while Dizziness and fall Personnel 2 2 4 Confirm non – attack of vertigo in 1 2 2 Low
working at height injury / fatality the past before allowing to work at
heights
Low: 1&2, Medium: 3&4, High: 6&9, Risk Rating: Severity X Likely Hood Page 2 /2
Loading &
Work Activity Location: All Assessment Team: Safety Team & Construction Team Approved by Project Mangers
Transportation
RISK RATING
TASK HAZARD CONTROLS Risk Rating After Control
Likely hood
Likely hood
Severity
Severity
Person in Danger Controls Measures and/or Recovery Measures
Risk
Risk
Risk Level
Step Hazard Description & Effect
Description of Task Step Low
No: Medium
High
6 Heavy wind speed Fall of person, fall of Personnel Avoid working in the wind speed
at height material, deviation of more than 20 km/hr. at any time of
material and working day.
platform Take adequate precaution to hold
the material from flying.
Hard barricading and use of safety
harness with double lanyard.
Use of adequate equipment catering
for average wind speed.
Faulty mounting of Injury by trip / slip and Personnel Provide ladder on firm footing at
7 the ladder fall appropriate inclination and fasten
on top
Low: 1&2, Medium: 3&4, High: 6&9, Risk Rating: Severity X Likely Hood Page 3 /2
Loading &
Work Activity Location: All Assessment Team: Safety Team & Construction Team Approved by Project Mangers
Transportation
RISK RATING
TASK HAZARD CONTROLS Risk Rating After Control
Likely hood
Likely hood
Severity
Severity
Person in Danger Controls Measures and/or Recovery Measures
Risk
Risk
Risk Level
Step Hazard Description & Effect
Description of Task Step Low
No: Medium
High
General Notes:
1. Safety is everyone’s responsibility, PM, CM, Safety Team and Site Engineer are to ensure all control measures are in place before any activity can
commence.
2. All hazards identified in this RISK ASSESMENT must be communicated to all personnel involved in the activities through Toolbox Talks.
3. This Risk Assessment must be reviewed and revised if necessary every six months or change of site or change of work procedure
4. In case of any Emergency follow our emergency evacuation procedure.