MODEL “ASI-X PACKER”

7” x 2.7/8”

OPERATIONAL PROCEDURE

DESCRIPTION

The ACT ASI-X Packer is the most versatile of the mechanically set retrievable packers
and may be used in any production application. Treating, testing, injecting, pumping
wells, flowing wells, deep or shallow, the ASI-X is suited. The packer can be left in
tension or compression, depending on well conditions and the required application. A
large internal by-pass reduces swabbing when running and retrieving. The by-pass
closes when the packer is set and opens prior to releasing the upper slips when
retrieving to allow pressure equalization. The J-slot design allows easy setting and
Releasing; 1/4 turn right-hand set, right-hand release. The standard 7” X 2-7/8” ASI-X
Packer is designed for differential pressures up to 7,000 PSI.

The 7” X 2-7/8” ASI-X is available in a 10K version which can withstand differential
pressures up to 10,000 PSI. This feature allows the packer to be utilized in completions
where high pressure treating operations are performed and it is desirable to leave the
tool in the well for production.

SETTING PROCEDURES

COMPRESSION SET

Run the packer to setting depth. Pick up the tubing to allow for setting stroke (12-13”)
plus desired tubing load. Rotate the tubing 1/4 right-hand turn at the packer, and then
lower the tubing while releasing torque. Slack off on the tubing sufficient weight to set
the packer (14,000 lbs). Pull tension to assure that the upper slips are set. The tubing
can then be left in tension, compression or neutral. If insufficient weight is available to
set the packer with compression, tension can be applied after slack-off to pack off the
elements.

3084 South I-35 W Burleson, Texas 76028 Tel: (817) 790-6608, (817) 783-7727 Fax: (817) 783-8081
Web Site: www.americancompletiontools.com Email: sales@americancompletiontools.com
MODEL “ASI-X PACKER”
7” x 2.7/8”

OPERATIONAL PROCEDURE

TENSION SET

Run to setting depth, pick up on the tubing and rotate 1/4 turn to the right at the packer
then lower the tubing slacking off available weight to set the packer lower slips. Pull
tension to set upper slips and pack off elements (see setting force guide). After setting
the packer, the tubing can be left in compression, tension or neutral.

RELEASING PROCEDURES

The releasing procedures are the same whether the packer has been tension or
compression set. Set down weight on the packer and rotate the tubing 1/4 turn to the
right at the packer and pick up while holding right-hand torque. The internal by-pass will
open, allowing pressure to equalize. After pressure is equalized, continue to pick up to
release the upper slips, relax the elements and release the lower slips thus allowing the
packer to be re-set or removed from the well. In the event, the packer will not release in
the normal manner, hard right-hand torque can be applied (800-1,000 Ft/lbs) which will
break the tack weld on the J-pin ring. Continued rotation of approximately 15 turns will
release the J-pin ring and allow the packer to be pulled. When released in this manner,
the packer will reset when moved down the hole.

CAUTION: High differential pressure below the ASI-X may cause the upper slips to
wedge in tighter, requiring an extra amount of tension to release the upper slips.

EXAMPLE: Consider a 7” x 2-7/8” packer set on 2.875” tubing with the backside loaded
and the tubing swabbed down causing a 3,000 PSI differential on the backside of the
packer. Referring to the pressure affected area guide for a 7” x 2-7/8” packer run on
2.875” tubing, pressure from above acts down on the mandrel across 1.80 in2.
Multiplying the pressure (3,000 PSI) by the area (1.80 in2) results in 5,400 lbs tension at
the packer over tubing weight required to open the by-pass valve.

3084 South I-35 W Burleson, Texas 76028 Tel: (817) 790-6608, (817) 783-7727 Fax: (817) 783-8081
Web Site: www.americancompletiontools.com Email: sales@americancompletiontools.com
MODEL “ASI-X PACKER”
7” x 2.7/8”

OPERATIONAL PROCEDURE

DISASSEMBLY

1) Clamp top sub (1) in vise.

NOTE: Drag block body and J-body assembly must be free to rotate.

1.1) Slide J-body assembly up and rotate as needed to access set screws (32).
Unscrew and remove set screws (32) from J-pin bottom sub (28).
1.2) Unscrew and remove J-pin bottom sub (28) from inner mandrel (2).

1.2.1) Remove o-ring (35) from J-pin bottom sub (28) .

1.3) Rotate drag block retainer (21) as needed to access set screws (33). Unscrew
and remove set screws (33) from drag block body (18).
1.4) Unscrew and remove J-body (20) and retainer ring (31) from inner mandrel
(2). (NOTE: Left-hand threads).

NOTE: The drag block body (18) and assembly must be free to rotate while
Wrenching on J-body (20).
1.5) Unscrew and remove rubber mandrel cap (19) from rubber mandrel (11).
1.6) Wedge lower slips (17) outward and slide drag block body assembly off of
rubber mandrel (11) and disassemble:

1.6.1) Remove wedges and lower slips (17) and lower slip springs (25) will fall
Out of drag block body (18).
1.6.2) Compress drag blocks (22) and remove drag block retainer (21) from
drag block body (18).

3084 South I-35 W Burleson, Texas 76028 Tel: (817) 790-6608, (817) 783-7727 Fax: (817) 783-8081
Web Site: www.americancompletiontools.com Email: sales@americancompletiontools.com
MODEL “ASI-X PACKER”
7” x 2.7/8”

OPERATIONAL PROCEDURE

1.6.3) Release drag blocks (22) and removes drag blocks (22) and drag block
Springs (3) drag block body (18).
1.7) Unscrew and remove lower cone (16) from rubber retainer (11).
1.8) Unscrew rubber mandrel (11) from center coupling (10).
1.9) Remove rubber mandrel assembly from inner mandrel (2) and disassemble:
1.9.1) Remove gage ring (29), elements (13, 14), rubber spacers (12) and rubber
Retainer (15) from rubber mandrel (11).
1.10) Unscrew and remove center coupling (10) from upper cone (9).
1.10.1) Remove o-ring (36) and seal (24) from center coupling (10).
1.10.1.1) Remove o-ring (34) from seal (24).
1.11) Remove bearing bushing (30) and upper cone (9) from inner mandrel (2).

2) Remove top sub (1) from vise and clamp inner mandrel (2) in vise.

NOTE: Do NOT wrench or clamp on seal surface.


2.1) Unscrew and remove spring cage cap (27) from spring cage (5).

CAUTION: Follower spring (4) is compressed with spring tension against spring cage
assembly.
2.2) Unscrew and remove top sub (1) inner mandrel (2).
2.3) Remove follower spring (4) from inner mandrel (2).
2.4) Unscrew and remove spring cage (5) from upper slip body (6).
2.5) Wedge releasing slip (7) and upper slips (8) outward and slide upper slip body
assembly off of inner mandrel (2) and disassemble:
2.5.1) Remove spring retaining ring (23) from upper slip body (6).
2.5.2) Remove wedges and releasing slip (7), upper slips (8) and upper slip
springs (26) will fall out of spring cage (5).

3) Remove inner mandrel (2) from vise.

ASSEMBLY

NOTE: Install parts in proper order & orientation.

1) Clamp inner mandrel (2) in vise.


NOTE: Do NOT wrench or clamp on seal surface.
1.1) Assemble spring cage assembly:
1.1.1) Install upper slips (8), releasing slip (7) and upper slip springs (26) into
Upper slip body (6).
1.1.2) Wedge releasing slip (7) and upper slips (8) outwards.
3084 South I-35 W Burleson, Texas 76028 Tel: (817) 790-6608, (817) 783-7727 Fax: (817) 783-8081
Web Site: www.americancompletiontools.com Email: sales@americancompletiontools.com
MODEL “ASI-X PACKER”
7” x 2.7/8”

OPERATIONAL PROCEDURE
1.2) Slide upper slip body assembly onto inner mandrel (2) and remove wedges.
1.3) Screw spring cage (5) into upper slip body (6).
1.4) Slide follower spring (4) onto inner mandrel (2).

1.5) Screw top sub (1) onto inner mandrel (2).

CAUTION: Follower spring (4) will be compressed with spring tension against spring
cage assembly.

1.6) Screw spring cage cap (27) onto spring cage (5).

2) Remove inner mandrel (2) from vise and clamp top sub (1) in vise.
2.1) Slide upper cone (9) and bearing bushing (30) onto inner mandrel (2).
2.2) Install o-ring (34) into groove in seal (24), and install seal (24) into center
coupling (10).

CAUTION: Do not rip or tear o-ring during installation.

2.3) Install o-ring (36) into center coupling (10), and then screw center coupling (10)
onto upper cone (9).
2.4) Assemble rubber mandrel assembly:
2.4.1) Slide rubber retainer (15), elements (13, 14), rubber spacers (12), and gage
ring (29) onto rubber mandrel (11).
2.5) Slide rubber mandrel assembly onto inner mandrel (2) and screw rubber mandrel
(11) into center coupling (10).

CAUTION: Do not rip or tear o-ring during installation.

2.6) Screw lower cone (16) into rubber retainer (15).


2.7) Assemble drag block body assembly:
2.7.1) Install lower slips (17) and lower slip springs (25) into drag block body (18).
Wedge lower slips (17) outward
2.7.2) Install drag blocks (22) and drag block springs (3) into drag block body (18).
2.7.3) Compress drag blocks (22).
2.7.4) Install drag block retainer (21) capturing ends of drag blocks (22). Align holes
with threaded holes in drag block body (18), then release drag blocks (22).
2.8) Slide drag block body assembly onto rubber mandrel (11).
2.9) Screw rubber mandrel cap (19) onto rubber mandrel (11).
2.10) Slide retainer ring (31) in place, and screw J-body (20) into drag block body (18)

(NOTE: Left-hand threads).

NOTE: The drag block body (18) and assembly must be free to rotate while wrenching
on J-body (20).
3084 South I-35 W Burleson, Texas 76028 Tel: (817) 790-6608, (817) 783-7727 Fax: (817) 783-8081
Web Site: www.americancompletiontools.com Email: sales@americancompletiontools.com
MODEL “ASI-X PACKER”
7” x 2.7/8”

OPERATIONAL PROCEDURE

2.11) Screw set screws (33) into J-body (20).


2.12) Install o-ring (35) into groove in J-pin bottom sub (28), then screw J-pin bottom
Sub (28) onto inner mandrel (2).

CAUTION: Do not rip or tear o-ring during installation.

2.13) Slide J-body assembly up and rotate as needed to access threaded holes. Screw
set screws (32) into J-pin bottom sub (28) .
2.14) Remove wedges from lower slips (17).

3) Remove top sub (1) from vise.

3084 South I-35 W Burleson, Texas 76028 Tel: (817) 790-6608, (817) 783-7727 Fax: (817) 783-8081
Web Site: www.americancompletiontools.com Email: sales@americancompletiontools.com
MODEL “ASI-X PACKER”
7” x 2.7/8”

OPERATIONAL PROCEDURE

3084 South I-35 W Burleson, Texas 76028 Tel: (817) 790-6608, (817) 783-7727 Fax: (817) 783-8081
Web Site: www.americancompletiontools.com Email: sales@americancompletiontools.com
MODEL “ASI-X PACKER”
7” x 2.7/8”

OPERATIONAL PROCEDURE

3084 South I-35 W Burleson, Texas 76028 Tel: (817) 790-6608, (817) 783-7727 Fax: (817) 783-8081
Web Site: www.americancompletiontools.com Email: sales@americancompletiontools.com

You might also like