Raksh Intern.2
Raksh Intern.2
Raksh Intern.2
V Sangha’s
BASAVESHWAR ENGINEERING COLLEGE
BAGALKOTE – 587102
(Government Aided Institution and permanently affiliated to Visveshvaraya Technological
University,
Belagavi accredited by NAAC with ‘A’ grade from 2019-2023)
Submitted By
RAKSHITA SARANGMATH 2BA19CV059
B.V.V Sangha’s
Shri BASAVESHWAR ENGINEERING COLLEGE
BAGALKOT – 587102
(Government Aided Institution and permanently affiliated to Visvesvaraya Technological
University,
Belagavi accredited by NAAC with ‘A’ grade from 2019-2023)
CERTIFICATE
This is to certify that RAKSHITA SARANGMATH(2BA19CV059)
has satisfactorily completed the INTERNSHIP on “RESIDENTIAL
BUIDLING AND QUARTERS” for partial fulfillment of course in
Civil Engineering Prescribed by Basaveshwar Engineering College,
Bagalkot during the year 2022-2023.
1.___________________ 1.___________________
2.___________________ 2.___________________
3.___________________ 3.___________________
INTERNSHIP REPORT
DECLARATION
I RAKSHITA SARANGMATH bearing USN: 2BA19CV059 student of
“BASAVESHWAR ENGINEERING COLLEGE” Bagalkot, hear by declare that the
Internship titled “RESIDENTIAL BUIDLING AND QUARTERS”.
I also declare that this Internship work is towards the partial fulfilment of the university
regulations for the award of degree of Bachelors in Engineering by Visvesvaraya
Technological University, Belgaum.
This report is personally prepared and compiled by me, and that the contents contained
within this report have not been duplicated or published anywhere or submitted to any
university for any degree program by a student or any other person.
I have personally compiled it based on the experience and training I had with “E I
TECHNOLOGIES PVT.LTD” company, Bangalore.
ACKNOWLEDGMENT
The internship opportunity I had with “E I Technologies Pvt. Ltd” was a great
chance for learning and professional development. Therefore, I consider myself as a very
lucky individual as I was provided with an opportunity to be a part of it. I am also grateful
for having a chance to meet so many wonderful people and professionals who led me
though this internship period.
I perceive this opportunity as a big milestone in my career development. I will strive
to use the skills and knowledge gained, in the best possible way and I will continue to
work on their improvement, in order to attain my desired career objectives.
First of all, I express my sincere thanks,
For permitting me to undertake this venture. I express my deepest gratitude to
Engineer Mr. Vijay Patagunde and Mr. Paveen for their guidance and unflagging support
and patience at the firm.he has arranged all facilities to make our internship programme
more meaningful.
I would also express my gratitude to Dr.P.G.Rakaraddi Head of Civil Engineering
Department and Prof.G.H. Bandihal internship co-ordinator Department of Civil
Engineering, Basaveshwar Engineering College Bagalkote.
I would also like to extend special thanks to the entire staff for their full cooperation,
guidance and support during my internship.
Finally, I would like to extend my deep gratitude towards my family and my friends for
their support in carrying out this work successfully.
In all Sincerity,
INDEX
PHASE-1:
ABSTRACT
1.1 INTRODUCTION ABOUT INTERNSHIP
1.2 ABOUT THE FIRM
1.3 ABOUT THE WORK FIELD
PHASE-2:
STUDY AREA
2.1 TECHNICAL REASONS FOR SELECTION OF PARTICULAR
AREA
2.2 STUDY AREA DISCRIPTION AND LOCATION (MAP)
2.3 BRIEF DISCRIPTION OF WORK
2.4 OUTCOMES
PHASE-3:
RESIDENTIAL BUILDING CONSTRUCTION
3.1 EARTHWORK EXCAVATION
3.2 PCC (PLAIN CEMENT CONCRETE)
3.3 FOOTING
3.4 CLOUMN
3.4.1 CALCULATION OF STEEL QUANTITY
3.4.2 CALCULATION OF CONCRETE QUANTITY UPTO PLINTH LEVEL
PHASE-4:
PLINTH
4.1 LINE MARKING FOR PLINTH BEAM
4.2 CONSTRUCTION OF STONE MANSORY UPTO PLINTH LEVEL
PHASE-5:
5.1 SITE VISIT PHOTOGRAPHS
5.2 CONCLUSION
INTRODUCTION:
The internship program is designed to provide students engaged in a field experience with
an opportunity to share their insights, to explore the links between students' academic
preparation and their field work, and to assist participants in developing and carrying out
the major research project which will serve to culminate their internship experience.
Internship is an integral part of academic curriculum. Is an initiative to bridge the gap
between knowledge and its application through a series of interventions that will enable
students to gain insight and exposure to industry.
An internship is a learning situation where a student has the opportunity to gain practical
experience. When placed in this situation, student expand their concepts of different
organizational structures and different working relationships within the workplace.
During an internship, we work on real projects, get acquainted with the current market
trends, sharpen your technical skills, and learn in demand technical skills. The value of
the internship really shines through when given the opportunity to work in the field and
experience what the job is really like. Internship is an excellent way to build those all
important connections that are invaluable in developing and maintaining a strong
professional network for the future.
OBJECTIVE OF THE INTERNSHIP:
To get a benefit of career exploration and increase chances of permanent
employment.
To give you the opportunity for college students to utilize theoretical knowledge
To sharpen domain knowledge and provide cross functional skills.
To explain students towards degree of corporate traditions and also get familiar
these individuals with corporate code of behaviour.
MISSION:
Provide professional design and project management consultancy services.
Emerge as a preferred technology partner for small, medium and large enterprises.
Consistently deliver quality and value.
Build talented and skilled professionals in all relevant fields.
Eliminate all forms of discriminations and, promote tolerance and mutual respect for each
other.
Create value for all stakeholders.
ABOUT THE WORK FIELD:
At EIT, they work to offer innovative business solutions. They provide effective options
that address the delivery and management of technological and holistic solutions in
specific fields of engineering covering natural and build environment, and Information
Technology. EIT leverage our core expertise and that of our associates to provide
innovative, sustainable and affordable consultancy and design services.
They shall consistently endeavor to fulfill our interested parties’ requirements and
strive to meet their expectations at all times through dedication, commitment,
anticipation, flexibility and maintain excellent relationship.
They shall constantly adapt, innovate and refine our approach and methodology in
every aspect of work, in line with national and international standards, practices and,
maintain transparency, credibility and leadership in what we do.
They shall practice equality and diversity, and commit ourselves to be transparent,
fair and honest in all our actions.
They shall be aware of our responsibilities, hold ourselves accountable and, abide by
all statutory and legal regulations.
They shall strive to continually improve our Quality Management System by
adapting a risk based thinking approach.
focused on the target that was to get a complete overview of Residential building
construction works (Civil) under E I Technologies Pvt Ltd Bangalore
Whereas building construction activities were carried out at site and learned
about;
7. Procedure for Ground beam and Plinth beam line out marking for excavation.
8. Checked out the measurements of work done in the site according to the
specifications and estimation. And also looked at the construction steps and being
explained the site engineer.
OUTCOMES:
5. Management of the cost at site and making it most economical as much as possible.
6. Identify the specific design, process and decision to reduce or eliminate the potential for
failure.
7. Learn from the others experience to avoid the pitfalls and minimizing the repetition of
erosion work.
10. An ability to use the techniques, skills, and modern engineering tools necessary for
engineering practice.
Excavation is the process of moving earth, rock or other materials with tools, equipment or
explosives. It also includes trenching, wall shafts, tunneling and underground. It is the
preliminary activity of the construction project.
levelled surface and to avoid laying concrete on soil directly so as to avoid mixing/ with
soil and also to prevent soil extracting water from PCC thereby weakening it.
FOOTING:
A structure essentially consists of two parts, namely the superstructure which is above the
plinth level and the substructure which is below the plinth level.
Substructure is otherwise known as the foundation and this forms the base for any
structure. Generally, about 30% of the total construction cost is spent on the foundation.
The soil on which the foundation rests is called the “Foundation Soil”.
OBJECTIVES OF FOOTING:
ISOLATED FOOTING:
Isolated footings (also known as Pad or Spread footings) are commonly used for shallow
foundations in order to carry and spread concentrated loads, caused for example by
columns or pillars. Isolated footing can consist either of reinforced or non-reinforced
material.
The isolated footing should only be used when it is absolutely certain, that no varying
settlements will occur under entire building.
Pad Footing
Stepped Footing
Sloped Spread Footing
COMBINED FOOTING:
Combined footing is used while construction of two or more columns when they are close
to each other and their foundations overlap. The main purpose of using combined footing
is to distribute uniform pressure under the footing Hence, this is done so that the center of
the gravity of the footing area should be equal to center of gravity of the two columns.
It is useful when the soil bearing capacity is slow when causes overlapping of adjacent
isolated footings. It is also useful when the proximity of a building line or existing
building or sewer is adjacent to a building column.
COLUMN:
RCC column is a vertical structural member which transfers loads from beam and slab
directly to the underneath soil. That means an entire building stands on columns. Most of
the building failure occurs not only for design fault but also for poor construction
practices.
Therefore, it is essential to know the construction procedure of RCC column
appropriately.
RCC Column Construction Process:
RCC columns are mainly constructed in four different stages, which are
PLINTH:
Plinth is the part of the superstructure between the top of the tie beam at the
finished ground level.(The top level of the soil surrounding the structure that
has been prepared and levelled prior toConstruction) and the floor level of the
building (the ground floor level inside the building).
PLINTH LEVEL:
It is also called ground floor level. It is the level where you actually starts
columns rising from the floor. As well as its first level the of beams from
where superstructure starts. Plinth is used to describe column bases. Beam
which braces the plinth level is called plinth beam. The Plinth is technically
from where the superstructure starts after the foundation.
PLINTH HEIGHT:
APPLICATIONS OF PLINTH:
SITE IMAGE:
CONCLUSION:
Under the guidelines of Mr. Vijay Patagunde as a mentor, we have got opportunity to
understand the technical and managerial aspect of residential project. The main aim of
studies within the project was to investigate how a structure is constructed within its
desired properties. We got to know about the basic and advanced techniques of building
construction as well as saw the challenges which a civil engineer have to face during
construction i.e. labor problems, cost management, environmental challenges etc. We
cleared our many doubts regarding building construction. Over all it must be said that the
construction methods and quality control on a residential project needs a very good
coordination and large quantities of man power, equipment and funds. During the period
of 4 weeks all the site staff helped us a lot to provide all the information about any query.
So we are grateful to E I Technologies for giving us the opportunity to learn and grow.