Definition:-
“Merupakan SISTEM / KAEDAH PEMBINAAN yang mana komponennya dihasilkan di dalam keadaan TERKAWAL (dikilang atau ditapak bina), DIANGKUT dan
DIPASANG dalam kerja pembinaan dengan menggunakan pekerja di tapak yang minima”
Concrete
Wood
Brick
Steel Bar
ON SITE
Equipments
IBS CONSTRUCTION
Brick
Wood
Frame
Block
Precast
staircase
OFF-SITE ON-SITE
MAIN IBS COMPONENTS
Roof Brace
Column Beam
2 3
4 5
Wood Frame Block Other Innovatif System
1: PRECAST CONCRETE SYSTEM
Timber frames,
pre-fab timber
roof trusses, etc.
5 : BLOCK SYSTEM
Interlocking concrete
masonry unit (CMU),
lightweight concrete blocks,
etc.
6 : NEW INNOVATIVE SYSTEM
DEVELOPMENT IBS IN MALAYSIA
Projek Perintis IBS Roadmap 2003-2010
IBS: Flat
Pekeliling,KL &
Construction Industry Master Plan
Flat Riffle Range,
2006-2015
P.Pinang
Malaysia IBS IBS Malaysia IBS Malaysia IBS
IBS
Strategic Diluluskan International Roadmap International International
oleh Exhibition Review Exhibition Exhibition
Plan 1999
Kabinet ’06 (MIIE06) 2008-2010 ’09 (MIIE09) 2011(MIIE’11)
1999 2001 2003 2004 2005 2006 2007 2008 2009 2010 2011 2015
Manual for IBS
Content Scoring
1966 CIS18 2010:
Diterbitkan
Lack of IBS design Insufficient push factor Lack of people with IBS
knowledge among from the end buyer for Lack of quality control in project management skill
designers IBS properties (except smaller IBS manufacturers which requires more
for GoM sector). Unlike logistics planning &
Proprietary systems make Green Buildings where Lack of local R&D, support coordination with IBS
it hard to be adopted by buyers knows the services, technologies and suppliers (i.e on-time
designer benefits and enjoy tax testing labs delivery)
break for such
buildings Lack of innovative products Additional cost in hiring
that can enhance aesthetic special equipment and
values of buildings machinery in implementing
IBS (i.e heavy duty lifting
crane)
The challenges faced have remain unchanged despite being repeatedly voiced by the industry
stakeholders during surveys, forums and workshops through-out the years…indicates problems need
to be resolved at the root cause level
Steel • Steel
Formwork • Aluminum
• Beam
Steel Frame
• Column
Timber
Industrialised Building System
Frame
• Pre-fab timber
• Masonry Unit
Blockwork
• Lightweight Blocks
Structural Category of IBS
Based on CIDB
Group 1: Pre-cast Concrete Framing, Panel and
Box Systems
Beams
Group 2: Steel Formwork Systems
x. Environmental friendly
• The use of IBS will decrease the using of timber formwork on
construction project
DISADVANTAGES OF IBS
i. High initial capital cost
• The initial capital cost of IBS is usually high. The initial cost
including the cost of constructing the factory, casting beds and
support machinery. The cost effectiveness can only be achieved
when undertaking large projects.
Government Sector
IBS Penetration Private Sector
high%
Fast Track
Policy Driven option for
70% government
scoring for projects
all RM10m
projects
50%
scoring for Policy Driven
all RM10m
projects
Treasury
Treasury Circular
IBS Circular
Strategic 2005
2008
Policy (Private Sector)
Sporadic
developments
Plan – score mean achievement
using IBS of IBS
low Dayabumi
– incentive of IBS
Pekeliling
Flats
58 IBS Projects
Applied for Levi
Exemption Time
1970-s 1999 2005 2008 today 2012 2015 2020
RESTRUCTURING ROADMAP IBS
THE HOUSE OF IBS
Penggunaan Penjanaan
Tenaga Kerja Kewangan
Yang Kurang Berterusan
High Quality Building and Objective
Accurate Completion Time
Development of
Prefer Quality In
Development
Research and
Technology
IBS People
Incentive
A Project
Contract
Green
Main
Component