@ Sta.0+010 - Sta.0+030 Section Detail Elevation Detail Proposed (Grouted Riprap)
@ Sta.0+010 - Sta.0+030 Section Detail Elevation Detail Proposed (Grouted Riprap)
@ Sta.0+010 - Sta.0+030 Section Detail Elevation Detail Proposed (Grouted Riprap)
75mm Ø UPVC
L =20m(VARIES-TO BE VERIFIED DURING CONSTRUCTION) 75mm dia. PVC WEEPHOLES WEEP PIPES Fine Gravel
SPACED STAGGERED @ 1.0M
VERTICAL and 2.0M HORIZONTAL @ 2000 O.C horizontal. & 16mm Ø - 15mm Ø
1000 vertical staggered
H=VARIES
2000 Medium Gravel
150 25mm Ø - 39mm Ø
CUT SLOPE
3
150 SOIL CLASSIFICATIONCUT SLOPE
3000 1
1000 500 2000 COMMON EARTH 1H:3V
300 150
150 Sack Cloth Tied at SOFT ROCK 1H:3V
650 650 the Inner End of Weephole HARD ROCK 1H:6V ROUND SLOPE
650 PHASE II (CE) 1H:1V
580
ELEVATION DETAIL PROPOSED (GROUTED RIPRAP) ROUND SLOPE
2 @ sta.0+010 - sta.0+030 2 SECTION DETAIL HEIGHT OF CUT RADIUS
A 1 SCALE 1:25 METERS A 2 SCALE 1:50 METERS WEEPHOLE DETAILS 0 - 4.5m 1.5m
5
N O T E: A1 > 4.5m 2.5m
NOT TO SCALE
COST OF FINE /MEDIUM GRAVEL, WEEPHOLES,
SACK CLOTH ( BURLAP CLOTH ) USE FOR THE CUT SLOPE
WEEPHOLE SHALL BE CONSIDERED SUBSIDIARY
TO COMPLETION OF PAY ITEM WHERE IT IS
USED.
SLOPE OF WEEPHOLE SHALL LEAVE A SLOPE Existing Road Level Proposed Widening
OF A 0.50%
*ALL UNIT ARE IN MILLIMETER
SELECTED EMBANKMENT
H = V A R I E S (refer to table)
H = V A R I E S (refer to table2)
12
1000 1000
5
H O F S DF MB MT KN/m 2
1000 400 100 400 200 300 300 35
h=600 2000 750 150 450 200 300 300 40
Min. 3000 1000 300 650 300 350 350 50
Depth B = VARIES 4000 1300 400 900 400 500 500 65
of Embedment 1 ELEVATION DETAIL 5000 1500 500 1200 500 700 700 95
A 2 SCALE 1:25 METERS See weephole details CUT FACE
1 SECTION DETAIL
A1 SCALE 1:25 METERS ROCK FILL
NOTE:
H
EMBANKMENT WILL BE CONSTRUCTED ONLY ON A
HEIGHT (m) SECTION (m)
COMPUTED PRESSURE EXERTED BY
STRUCTURE (kPa) FOUNDATION BED SATISFACTORY TO THE ENGINEER.
PROPOSED MASONRY
BREAST WALL NOTE:
H h B b qmax qmin 1. Foundation strata to have a permissible bearing capacity
1.00 0.60 0.50 0.50 58.24 27.40 THE MINIMUM THICKNESS/DIAMETER OF BOULDERS not less than the given maximum bearing pressure.
1.50 0.60 0.80 0.50 66.17 25.10 SHALL NOT BE LESS THAN 150mm.
2.00 0.60 1.00 0.50 70.28 28.70
0.50 73.28 35.28 2. Soft spot under the foundation shall be removed and
2.50 0.60 1.20 THE ALLOWABLE SOIL BEARING CAPACITY SHALL NOT
0.50 89.75 31.53 replaced with concrete Class B.
3.00 0.60 1.50 BE LESS THAN THE VALUES AS SHOWN ABOVE, WHICH IS A
3.50 0.60 1.70 0.50 110.91 24.74 H
VERY FIRM CLAY FOUNDATION BED. 3. Concrete shall comply with Specification Item 405b.
4.00 0.60 2.00 0.50 150.67 6.28 O
ROAD LEVEL
4.50 0.60 2.20 0.50 136.71 25.86
SOIL BORING TEST MUST BE CONDUCTED DURING 4. Stone masonry shall comply with Specification Item 506.
5.00 0.60 2.50 0.50 142.50 32.99
CONSTRUCTION TO VERIFY THE ACTUAL SOIL BEARING 1.0m MIN
5.50 0.60 2.80 0.50 148.77 39.72
CAPACITY. DEPTH OF
6.00 0.60 3.00 0.50 163.95 38.46 5. Any void between the cut face and the stone masonry
EMBEDMENT DF
to be filled with rock fill hand placed in layer.
F MB
1 TYPICAL EMBANKMENT PROTECTION DETAIL (STONE MASONRY) S
FOUNDATION CONCRETE
CLASS B.
SCALE 1:25 METERS
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: CHECKED/REVIEWED : SUBMITTED : RECOMMENDED APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
· TYPICAL DETAIL OF STONE
CORDILLERA ADMINISTRATIVE REGION CONCRETING OF SITIO COCOY TO SITIO ALERDES SHANE G. ANTONIO
MASONRY , BREASTWALL,
IFUGAO FIRST DISTRICT ENGINEERING OFFICE ABABBA, BRGY. TUKUCAN FMR, BRGY.
GROUTED RIPRAP AND WIDENING
ENGINEER 1 11
LAGAWE, IFUGAO TUKUCAN, TINOC, IFUGAO PREPARED: FILEMON A. SALVADOR 21
WORKS JANICE MAE C. PULAO CYNTHIA O. DANGO ISAGANI C. CAYME ROMMEL E. FABI CHIEF,REGIONAL AGRICURTURAL ENGINEERING DIVISION
ZAIRON T. WIGAN DATE:
ENGINEER II,HEAD HIGHWAY DESIGN UNIT
DATE:
CHIEF, PLANNING & DESIGN SECTION
DATE:
ASSISTANT DISTRICT ENGINEER
DATE:
DISTRICT ENGINEER "DEPARTMENT OF AGRICULTURE - RFO-CAR"
ENGINEER II DATE:
CT=1000mm
O=2000mm
W=400mm LINKS @ 200 W=400mm LINKS @ 200 W=400mm LINKS @ 200 W=400mm MT=750mm
DBU=300mm
300MM H B K K
WT=300mm
BAR BENDING DIAGRAM
G I J I J I
SELECTED FILL
200 1330 640 200
3640 200 200
h=3500mm
N 50 3350
1600
LINKS @150
A B C D
4340
DBL=300mm
200 50 640 4250 2500
200 50 640
50
650
I J K L
H B K K 250
300MM
250
650
COLUMN INNER
3160
50
300 300
50 FACE
1 1
640
M 650 N
G I J I J I
h=3500mm
LINKS @150
P=1500mm
C F F Provide 50mm
lean concrete @every corner
300mm
BARS @ 150 T & B BARS @ 150 T & B
DF=400mm
D D D
400MM
75mm THICK
LEAN
MB=750mm CONCRETE
A B E E R=250mm
F=700mm
S=3750mm S=3750mm S=3750mm RB=750mm
B=1700mm
3 SECTION 1-1
1 TYPICAL ELEVATION SCALE NTS
SCALE NDTS 2 TYPICAL SECTION
SCALE 1:60
NOTES:
1. THIS DRAWING MAY B E USED ONLY FOR THE PURPOSE INTENDED.
2. FOR THE PURPOSE OF CONSTRUCTION, DRAWING MUST NOT BE SCALED AND ONLY WRITTEN OR CALCULATED
DIMENSIONS USED.
3. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS SHOWN OTHERWISE.
4. FORMED CONCRETE SURFACE FINISH SHALL COMPLY WITH SPECIFICATION ITEM 407.B.12
5. UNIFORMED CONCRETE SURFACE FINISH:
TOP OF FOUNDATION - AS CAST
750mm ALL OTHER SURFACES - FLOAT
6. CONCRETE SHALL COMPLY WITH SPECIFICATION ITEM 405 AND BE OF THE FOLLOWING CLASSES:
300mm
50
SHOWN OTHERWISE 40mm
8. REINFORCEMENT SHALL COMPLY WITH AASHTO SPECIFICATION M31 (ASTM A615) GRADE 60 FOR BARS GREATER
1300mm
THAN 16MM Ø AND GRADE 40 FOR LESS THAN 20MM Ø.
9. FOR REINFORCEMENT SCHEDULE SEE SHEET 2.
10. FOUNDATION STRATA TO HAVE A PERMISSIBLE BEARING CAPACITY NOT LESS THAN THE GIVEN MAXIMUM
400mm
GROUND PRESSURE.
750mm
11. SOFT SPOTS UNDER THE FOUNDATION SHALL BE REMOVED AND REPLACED WITH CONCRETE CLASS B.
12. STONE MASONRY SHALL COMPLY WITH SPECIFICATION ITEM 506.
13. ANY VOIDS BETWEEN THE CUT FACE AND THE STONE MASONRY TO BE FILLED WITH HAND ROCK FILL.
400mm
50
14. THE DEPTH OF PENETRATION SHALL BE MEASURED FROM THE LEVEL OF THE ORIGINAL GROUND SURFACE AND
SHALL NOT INCLUDE TIPPED MATERIALS.
15. (40Db) FOR THE LENGTH OF SPLICE IN MM
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: CHECKED/REVIEWED : SUBMITTED : RECOMMENDED APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CORDILLERA ADMINISTRATIVE REGION CONCRETING OF SITIO COCOY TO SITIO
· TYPICAL DETAIL CRIBWALL
ALERDES SHANE G. ANTONIO
IFUGAO FIRST DISTRICT ENGINEERING OFFICE ABABBA, BRGY. TUKUCAN FMR, BRGY. ENGINEER 1 12
LAGAWE, IFUGAO TUKUCAN, TINOC, IFUGAO PREPARED: FILEMON A. SALVADOR 21
JANICE MAE C. PULAO CYNTHIA O. DANGO ISAGANI C. CAYME ROMMEL E. FABI CHIEF,REGIONAL AGRICURTURAL ENGINEERING DIVISION
ZAIRON T. WIGAN DATE:
ENGINEER II,HEAD HIGHWAY DESIGN UNIT
DATE:
CHIEF, PLANNING & DESIGN SECTION
DATE:
ASSISTANT DISTRICT ENGINEER
DATE:
DISTRICT ENGINEER "DEPARTMENT OF AGRICULTURE - RFO-CAR"
ENGINEER II DATE:
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: CHECKED/REVIEWED : SUBMITTED : RECOMMENDED APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CORDILLERA ADMINISTRATIVE REGION
· CRIBWALL QUANTITIES AND
CONCRETING OF SITIO COCOY TO SITIO ALERDES SHANE G. ANTONIO
SCHEDULE TABLE
IFUGAO FIRST DISTRICT ENGINEERING OFFICE ABABBA, BRGY. TUKUCAN FMR, BRGY. ENGINEER 1 13
LAGAWE, IFUGAO TUKUCAN, TINOC, IFUGAO PREPARED: FILEMON A. SALVADOR 21
JANICE MAE C. PULAO CYNTHIA O. DANGO ISAGANI C. CAYME ROMMEL E. FABI CHIEF,REGIONAL AGRICURTURAL ENGINEERING DIVISION
ZAIRON T. WIGAN DATE:
ENGINEER II,HEAD HIGHWAY DESIGN UNIT
DATE:
CHIEF, PLANNING & DESIGN SECTION
DATE:
ASSISTANT DISTRICT ENGINEER
DATE:
DISTRICT ENGINEER "DEPARTMENT OF AGRICULTURE - RFO-CAR"
ENGINEER II DATE:
H = MAXIMUM OF 5.00mtrs.
see Dowel Bar Detail
6100
650 3050 3050
slope -1.50%
16% slope
slope -1.50%
PROPOSED
MASONRY
see Dowel Bar Detail BREAST WALL
6100
650 3050 3050 100mm (4 inches) THICK AGGREGATE SUB-BASE COURSE
slope -1.50%
16% slope
slope -1.50%
PROPOSED R.C. CANAL (see detail)
VARIES
1m MIN
DEPTH
VARIES
100mm (4 inches) THICK AGGREGATE SUB-BASE COURSE SCALE 1:50 AREA CUT
6.10m
MASONRY BREASTWALL 0.65m PROP. CONCRETE CURB
16% slope 3.05m & GUTTER(see detail)
slope e%
3.05m 0.9m 0.3m 100mm (4 inches) THICK AGGREGATE SUB-BASE COURSE
SCALE 1:50 slope -e% 200mm (8 inches) THICK PORTLAND CEMENT
H = VARIES PROPOSED CONCRETE
CONCRETE PAVEMENT
H = MAXIMUM OF 5.00mtrs.
CONCRETE PAVEMENT
trs.
PROPOSED
H = MAXIMUM OF 3.00m
GROUTED RIPRAP PROPOSED STONE
(refer to cross-sections) MASONRY VARIES
SELECTED FILL 6100
650 3050 3050 650 0.5m
see TIE Bar Detail VARIES
slope -1.50% slope -1.50%
16% slope 16% slop
e
6.10m
1m MIN
0.8m
DEPTH
0.65m
16% slope 3.05m
0.65m0.3m
see TIE Bar Detail slope e%
SCALE 1:50
SECTION OF PROP. PCCP W/ CONCRETE CURB & GUTTER ON BOTH SIDES AND B = VARIES
GROUTED RIPRAP SECTION OF PROP. PCCP SUPER ELEV. ,
CONCRETE CURB & GUTTER ,STONE MASONRY
H = MAXIMUM OF 5.00mtrs.
H = MAXIMUM OF 3.00mtrs.
AREA CUT
H
VARIES
O
SELECTED FILL
PROPOSED 6100
MASONRY 650 3 see TIE Bar Detail
6100 BREAST WALL
16% slope 3050 PROP. CONCRETE CURB
650 slope e%
650 500 & GUTTER(see detail)
0.3m
16% slope 3050 3050
slope -e%
1 6.10m
slope e%
3050 650 16% s 0.65m 3.05m 3.05m 0.65m
lope slope -1.50%
slope -e% e slope -1.50%
16% slop 16% slop
e
16% s
lope PROPOSED CONCRETE 650
1m MIN
DEPTH
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: CHECKED/REVIEWED : SUBMITTED : RECOMMENDED APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
· SECTION OF PROP. PCCP AND
CORDILLERA ADMINISTRATIVE REGION CONCRETING OF SITIO COCOY TO SITIO ALERDES SHANE G. ANTONIO
SUPERELEVATION WITH
IFUGAO FIRST DISTRICT ENGINEERING OFFICE ABABBA, BRGY. TUKUCAN FMR, BRGY.
PROPOSED STRUCTURES
ENGINEER 1 14
LAGAWE, IFUGAO TUKUCAN, TINOC, IFUGAO PREPARED: FILEMON A. SALVADOR 21
JANICE MAE C. PULAO CYNTHIA O. DANGO ISAGANI C. CAYME ROMMEL E. FABI CHIEF,REGIONAL AGRICURTURAL ENGINEERING DIVISION
ZAIRON T. WIGAN DATE:
ENGINEER II,HEAD HIGHWAY DESIGN UNIT
DATE:
CHIEF, PLANNING & DESIGN SECTION
DATE:
ASSISTANT DISTRICT ENGINEER
DATE:
DISTRICT ENGINEER "DEPARTMENT OF AGRICULTURE - RFO-CAR"
ENGINEER II DATE:
SECTION II
BEG. OF FLARING
16mm Ø x 60cm TIE BARS
D
EDGE OF EXISTING CONC. PAVEMENT
SECTION I
PLAIN DOWEL BAR
300
1000
25mm Ø x 600 @ 300
C
O.C. (200mm) LANE SHOWING TRANSVERSE
300
CONSTRUCTION JOINT AT LOCATION
DEFORMED TIE BAR OF WEAKENED PLANE JOINT
300
300
16mm Ø x 600 @ 600
WIDTH AS SHOWN IN PLANS
A
O.C. (200mm)
300
300
TRANSVERSE CONSTRUCTION JOINT
F G
600
600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600
600
300 300 300 300
600
CONSTRUCTION JOINT AT MIDDLE
THIRD OF NORMAL JOINT INTERVAL 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600
600
VARIABLE
B NOTE:
E
THE EXISTING CONCRETE PAVEMENT SHALL
BE CHIPPED OFF PERPENDICULARLY TO THE
EXISTING BASE ABOUT 300mm WIDE TO A DIS- PLAN (SHOWING FLARING OF EXISTING CONC. PAVEMENT)
SCALE
TANCE WHERE THE FLARE IS LESS THAN 1000mm NOT TO
AND NECESSARY DOWEL BARS SHALL BE PROVIDED
TO CONNECT THE NEW PAVEMENT
4500 4500 1500 (MIN.)
WITH THE EXISTING PAVEMENT.
END OF APPROACH
LONGITUDINAL JOINT
END OF APPROACH
4500 4500 4500 4500 4500 4500
T
SLAB
SLAB
FIRST SLAB
SAWED JOINT SECTION I CONTACT JOINT
(2 LANE PAVING) (LONGITUDINAL JOINT) (HALF LANE PAVING)
DETAIL "A" SEE
SCALE 1:10 M
SEE
SCALE 1:10 M
DETAIL "C" DETAIL "E"
WIDTH
WIDTH
L/2
L/2
LANE
LANE
ROADWAY
ROADWAY
DEFORMED TIE BAR
ABUTMENT A
ABUTMENT B
16mm Ø X 600 SAWED GROOVE WITH POURED
L
C
C
L
L
@ 600 O.C. JOINT FILLER
WIDTH
WIDTH
LANE
LANE
6.0mm CONTRACTION JOINT CONSTRUCTION JOINT
SECTION II
L/2
L/2
5mm
50mm
(TRANSVERSE JOINT)
(minimum) SCALE 1:10 M
T/2
b b
b b
a a
T/2
25
NEW PAVEMENT
50mm
1/3T
2. CONSTRUCTION (CONTACT) JOINTS ARE FORMED WHEN CONCRETE ON ONE SIDE OF THE
150
JOINT IS POURED AHEAD AND ALLOWED TO SET BEFORE POURING ON THE OTHER SIDE.
45°
50 25
FIXED SLIDING
3. AT CONSTRUCTION JOINTS (LONGITUDINAL OR TRANSVERSE) CARE SHOULD BE TAKEN
11
DETAIL "F" THAT NO CONCRETE FROM THE LAST SLAB PLACED OVERHANGS ANY PORTION OF THE
DETAIL "C"
1/3T
SCALE 1:10 M
SCALE 1:10 M
150 FIRST SLAB.
4. THE BARS SHOULD BE DEFORMED STEEL BARS, ALL DOWEL BAR SHALL BE SMOOTH ROUND
11
PLAIN DOWEL BAR
20mm PREMOLDED
HALF OF THE BAR ON THE SIDE OF
STEEL BAR FREE FROM RUST AND OTHER DEFECTS WHICH MIGHT RESTRICT THEIR
25mm Ø x 600 @ 300 ONE
EXPANSION FILLER MOVEMENT.
1/3T
HALF OF THE LENGTH METAL DOWEL CAP SHALL BE PAINTED
SHALL BE PAINTED WITH APPROVED
ADDITIONAL
LANE
2000 2000 ADDITIONAL
WITH RED LEAD AND THEN GREASED 5. TYPE OF WEAKENED JOINT TO BE USED SHALL BE AS SPECIFIED IN THE PLANS AND ONLY
LANE
RED LEAD AND ONE TYPE SHALL BE USED FOR THE WHOLE PROJECT.
FORMED GROOVE WITH
THEN GREASED
POURED JOINT FILLER
EXISTING PCCP 6. MATERIAL FOR THE METAL SIDE FORM SHALL BE BRAND NEW SHEET METAL GAUGE NO. 18
OF BLACK IRON FREE FROM RUST AND LINKS.
12mm DETAIL OF EXPANSION JOINT (DOWELED) AT METAL SIDE FORM
7. AT LEAST SIX (6) SUCCESSIVE DOWELLED BUTT JOINTS AT NORMAL JOINT SPACING SHALL
5mm
25mm
SEE DETAIL "F" SEE DETAIL "F" CERTAIN INTERSECTIONS AND STRUCTURES BE PROVIDE BEFORE OR AFTER AN EXPANSION JOINT.
SCALE 1:10 M 8. THE GROOVE OR CRACK ABOVE JOINTS (LONGITUDINAL OR TRANSVERSE) SHALL BE
25 SEALED WITH 30-50 PENETRATION ASPHALT SEAL OR COLD APPLIED LIQUID RUBBER
PAVEMENT WIDENING COMPOUND AFTER THE
FIRST SLAB ADDITIONAL LANE CONCRETE HAD BEEN CURED AND BEFORE OPENING PAVEMENT TO TRAFFIC.
TRAFFIC DIRECTION
9. ALL TRANSVERSE JOINTS, EXCEPT CONSTRUCTION JOINT, SHALL BE CONTINUOUS FROM
1/3T
SCALE 1:10 M
DETAIL "D" EDGE TO EDGE.
SCALE 1:10 M 10 ALL LONGITUDINAL JOINT SHALL MEET AT INTERSECTIONS WITH NO GAPS OR OFFSET.
11
FORMED GROOVE WITH KEYWAYS 11. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
PLAIN DOWEL BAR FILL WITH HOT POURED JOINT FILLER FORMED GROOVE WITH KEYWAYS
12. AVOID STOPPAGE OF FORMWORKS ALONG CURVES.
1/3T
ROOFING NAIL
25mm Ø X 600 FORMED GROOVE WITH KEYWAYS FILL WITH HOT POURED JOINT FILLER OUTLINE OF CHIPPED OFF
@ 300 FILL WITH POURED JOINT FILLER
12
12 EXTG. CONCRETE PAVEMENT
@ 750mm O.C.
13. TRANSVERSE CONSTRUCTION (CONTACT) JOINT SHALL BE PROVIDE AT THE END OF ANY
RUN WHERE LAYING OF CONCRETE HAS BEEN STOPPED FOR THIRTY (30) MINUTES OR
11
5
25
12
1/Te 1/Te 1/3Te
25
LONGER.
5
25
1/3T
1/3T
NEW PAVEMENT
JOINTS WITH DOWELS. IF JOINT OCCURS IN THE MIDDLE THIRD OF THE WEAKENED JOINT
Tn
PAVEMENT EXISTING
1/3T 1/3T
PAVEMENT
INTERVAL (1500 - 3000mm) IT SHOULD BE KEYED JOINTS WITH THE BARS.
T
Tn-Te
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: CHECKED/REVIEWED : SUBMITTED : RECOMMENDED APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CORDILLERA ADMINISTRATIVE REGION CONCRETING OF SITIO COCOY TO SITIO · TYPICAL PCCP DETAIL
ALERDES SHANE G. ANTONIO
IFUGAO FIRST DISTRICT ENGINEERING OFFICE ABABBA, BRGY. TUKUCAN FMR, BRGY. ENGINEER 1 15
LAGAWE, IFUGAO TUKUCAN, TINOC, IFUGAO PREPARED: FILEMON A. SALVADOR 21
JANICE MAE C. PULAO CYNTHIA O. DANGO ISAGANI C. CAYME ROMMEL E. FABI CHIEF,REGIONAL AGRICURTURAL ENGINEERING DIVISION
ZAIRON T. WIGAN DATE:
ENGINEER II,HEAD HIGHWAY DESIGN UNIT
DATE:
CHIEF, PLANNING & DESIGN SECTION
DATE:
ASSISTANT DISTRICT ENGINEER
DATE:
DISTRICT ENGINEER "DEPARTMENT OF AGRICULTURE - RFO-CAR"
ENGINEER II DATE:
FORMULA :
PI T = R ( TAN I/2 )
I
Lc = ( π/180 )*I*R
D = 1145.916/R
E = T ( TAN I/4 )
T
LEGEND :
T
PI - POINT OF HORIZONTAL INTERSECTION PI
I - EXTERNAL ANGLE
20
M
LC T - LENGTH OF TANGENT
ET
ER
R - HORIZONTAL RADIUS
S
A
Lc - LENGTH OF CIRCULAR CURVE
RC
PT D - DEGREE OF CURVE (ARC DEFINITION)
PC
1
I PC- POINT OF CURVATURE
D
1 3L
o 3L
R o
R PT- POINT OF TANGENCY
E - EXTERNAL DISTANCE
2
o 3L
2 3L o
1 HORIZONTAL CURVE (CIRCULAR) PC PT
SCALE NTS
Lw
LEGEND :
PVI - POINT OF VERTICAL INTERSECTION
W
PVI PVC - POINT OF VERTICAL CURVATURE
X
PVT - POINT OF VERTICAL TANGENCY
Wn
LVC, LVC1, LVC2 - LENGTH OF VERTICAL CURVES Ln Lo Lo
g - GRADE IN PERCENT
MO
W
IN ANY SYMMETRICAL VERTICAL PARABOLIC CURVE
LVC/2 LVC/2 MO = A*LVC / 800 Ln
Y = ( X²*MO ) / ( LVC/2 )²
LVC FORMULA :
LVC = KA
FORMULA :
LEGEND : Wn = WLn/Lo
A - ALGEBRAIC DIFFERENCE OF GRADIENTS (%)
2 SYMMETRICAL VERTICAL PARABOLIC CURVE
SCALE NTS K - RATE OF VERTICAL CURVATURE (m)
LEGEND :
W = WIDENING WIDTH
X1 Lo = LENGTH OF SUPERELEVATION RUN-OFF
PVI
X2 IN ANY UNSYMMETRICAL VERTICAL PARABOLIC CURVE Lw = LENGTH OF FULL WIDENING WIDTH
-g%
MO = ( LVC1*LVC2*A ) / 200LVC Ln = LENGTH FROM THE BEGINNING OF RUN-OFF
MO
Y1 = MO ( X1 )² / ( LVC1 )²
WITH A WIDENING OF Wn
Y2
Y2 = MO ( X2 )² / ( LVC2 )²
Y1
+g
% PVT Wn = WIDENING OF LENGTH Ln
FORMULA :
LVC = KA
PVC LEGEND :
A - ALGEBRAIC DIFFERENCE OF GRADIENTS (%)
LVC1 LVC2 K - RATE OF VERTICAL CURVATURE (m)
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: CHECKED/REVIEWED : SUBMITTED : RECOMMENDED APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CORDILLERA ADMINISTRATIVE REGION CONCRETING OF SITIO COCOY TO SITIO · GEOMETRIC DESIGN STANDARD
(HORIZONTAL AND VERTICAL)
ALERDES SHANE G. ANTONIO
IFUGAO FIRST DISTRICT ENGINEERING OFFICE ABABBA, BRGY. TUKUCAN FMR, BRGY. ENGINEER 1 16
LAGAWE, IFUGAO TUKUCAN, TINOC, IFUGAO PREPARED: FILEMON A. SALVADOR 21
JANICE MAE C. PULAO CYNTHIA O. DANGO ISAGANI C. CAYME ROMMEL E. FABI CHIEF,REGIONAL AGRICURTURAL ENGINEERING DIVISION
ZAIRON T. WIGAN DATE:
ENGINEER II,HEAD HIGHWAY DESIGN UNIT
DATE:
CHIEF, PLANNING & DESIGN SECTION
DATE:
ASSISTANT DISTRICT ENGINEER
DATE:
DISTRICT ENGINEER "DEPARTMENT OF AGRICULTURE - RFO-CAR"
ENGINEER II DATE:
e2
x
2%
ma
ROADWAY ℄
2%
ma
e1
x
SUPERELEVATION RUN OFF (Lo1) SUPERELEVATION RUN OFF (Lo2)
1 Lo1 2 2 1 Lo2
3 3 Lo1 3 Lo2 3
7 58~41 103~71 160~116 231~170 2. e = e max. CAN BE TAKEN FROM TABLE OF DESIGN VALUE FOR SUPERELEVATION.
8 BELOW ~41 BELOW ~71 BELOW ~116 BELOW ~170 3. THE SLOPE OF SHOULDER SHALL ALWAYS FALL IN THE DIRECTION OF THE
OUTSIDE EDGE OF THE TRAVELED WAY.
e1
e2
2%
2%
ROADWAY ℄
ma
ma
x
x
4. WHEN THE SUPERELEVATION IS GREATER THAN 3% THEN THE SLOPE OF
SUPERELEVATION RUN OFF (Lo1) SUPERELEVATION RUN OFF (Lo2) LOWER SHOULDER SHALL BE THE SAME AS FOR THE TRAVELED WAY.
1 2 2 1
3 Lo1 3 Lo1 3 Lo2 3 Lo2
NOTE : IN MOUNTAINOUS SECTIONS AND AT BRIDGE APPROACHES THE DESIGN SPEED OF
5. WHEN THE SUPERELEVATION IS 4% OR LESSER, THEN THE LOWER SHOULDER
INNER EDGE INNER EDGE
30 Km/h AND THE MAXIMUM SUPERELEVATION OF 4% INSTEAD OF 8% WILL BE
SHALL HAVE A SLOPE OF 3%.
OF PAVEMENT OF PAVEMENT ADOPTED WHEN NECESSARY.
ΔS ≥ 0.30 %
6. IF THE SUPERELEVATION IS 5%, THEN THE CROSS SLOPE OF THE HIGHER SHOULDER
AXIS OF ROTATION % ΔS ≥ 0.30 AXIS OF ROTATION
we we IS 2%. BUT FOR A MAXIMUM SUPERELEVATION OF 8%, THE SLOPE OF THE HIGHER
en=NORMAL CROSSFALL
ROADWAY ℄ SHOULDER WILL BE 1%.
we we
% ΔS ≥ 0.30
ΔS ≥ 0.30 %
7. SUPERELEVATION SHOWN ON THE PROFILE ARE BASED ON CONSTANT 6.70m.
OUTER EDGE OUTER EDGE
RECOMMENDED SLOPE OF SUPERELEVATION PAVEMENT WIDTH AND NOT ON VARYING PAVEMENT WIDTH DUE TO WIDENING.
OF PAVEMENT
PT PC
OF PAVEMENT RUN-OFF RELATED TO DESIGN SPEED
ROADWAY ℄ 8. THE CROSS SLOPE OF SUBBASE IS ALWAYS FALLING IN THE SAME DIRECTION
(CONSIDERING WIDENING OF PAVEMENT) AS THE ROADWAY.
R1 R2
DESIGN SPEED (Km/h) 30 40 50 60
9. ALGEBRAIC DIFFERENCE OF CROSSOVER SHOULD NOT EXCEED 7%.
MAX. RELATIVE SLOPE
IB TRANSITION : CIRCULAR CURVE-STRAIGHT-CIRCULAR CURVE CASE 2 (%) 0.75 0.70 0.65 0.60 10. FOR e>7% SHOULDERS SHOULD BE PAVED.
SCALE NTS
em
2%
e2
x
ROADWAY ℄
ma
ROADWAY ℄
ax
ma
e1
x
SUPERELEVATION RUN OFF (Lo) SUPERELEVATION RUN OFF (Lo1) SUPERELEVATION RUN OFF (Lo2)
2 1
3 Lo 3 Lo
L1
INNER EDGE OUTER EDGE INNER EDGE
OF PAVEMENT OF PAVEMENT OF PAVEMENT
ΔS < 0.30%
% ΔS ≥ 0.30
0.30 AXIS OF ROTATION % ΔS ≥ 0.30
% AXIS OF ROTATION
ΔS = ΔS ≥ 0.30
% we we we
ROADWAY ℄ ROADWAY ℄
we we we
ΔS ≥ 0.30 % ΔS ≥ 0.30
NORMAL CROSSFALL
% ΔS ≥ 0.30 %
PT
OUTER EDGE INNER EDGE R1 PC OUTER EDGE
OF PAVEMENT OF PAVEMENT OF PAVEMENT
ROADWAY ℄ ROADWAY ℄
PC PT
R2
IA TRANSITION : STRAIGHT-CIRCULAR CURVE CASE 1 IC TRANSITION : CIRCULAR CURVE-MINIMUM STRAIGHT-CIRCULAR CURVE CASE 3
SCALE NTS SCALE NTS
1 SUPERELEVATION
SCALE NTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: CHECKED/REVIEWED : SUBMITTED : RECOMMENDED APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CORDILLERA ADMINISTRATIVE REGION CONCRETING OF SITIO COCOY TO SITIO · GEOMETRIC DESIGN STANDARD
(SUPERELEVATION)
ALERDES SHANE G. ANTONIO
IFUGAO FIRST DISTRICT ENGINEERING OFFICE ABABBA, BRGY. TUKUCAN FMR, BRGY. ENGINEER 1 17
LAGAWE, IFUGAO TUKUCAN, TINOC, IFUGAO PREPARED: FILEMON A. SALVADOR 21
JANICE MAE C. PULAO CYNTHIA O. DANGO ISAGANI C. CAYME ROMMEL E. FABI CHIEF,REGIONAL AGRICURTURAL ENGINEERING DIVISION
ZAIRON T. WIGAN DATE:
ENGINEER II,HEAD HIGHWAY DESIGN UNIT
DATE:
CHIEF, PLANNING & DESIGN SECTION
DATE:
ASSISTANT DISTRICT ENGINEER
DATE:
DISTRICT ENGINEER "DEPARTMENT OF AGRICULTURE - RFO-CAR"
ENGINEER II DATE:
C:\Users\User\Desktop\sinages\3.jpg
C:\Users\ZAi\Desktop\FILES PER MONTH\SEPTEMBER\fuji rd slip\New folder\3.jpg
C:\Users\User\Desktop\sinages\4.jpg
C:\Users\ZAi\Desktop\FILES PER MONTH\SEPTEMBER\fuji rd slip\New folder\4.jpg
C:\Users\User\Desktop\sinages\1.jpg
C:\Users\ZAi\Desktop\FILES PER MONTH\SEPTEMBER\fuji rd slip\New folder\1.jpg
C:\Users\User\Desktop\sinages\2.jpg
C:\Users\ZAi\Desktop\FILES PER MONTH\SEPTEMBER\fuji rd slip\New folder\2.jpg
Note:
Applicable for Signages of Size: Note:
1800 x 600 Applicable for Signages of Size:
Framing for Road Construction Safety Signage 450 x 450
SCALE NTS 1800 x 900 Framing for Road Construction Safety Signage
SCALE NTS
NOTES:
1. THIS GUIDELINES IS WITH REGARDS TO DEPARTMENT ORDER NO. 125 OR
THE STRICT COMPLIANCE TO ROAD WORKS SAFETY & TRAFFIC MANAGEMENT
AND CONSTRUCTION SAFETY & HEALTH REQUIREMENTS DURING CONSTRUCTION
AND MAINTENANCE OF ROADS AND BRIDGES.
2. SPEED CONSIDERATIONS:
· LOW SPEED ROAD - TRAFFIC APPROACH SPEED IS LESS THAN 60 KPH.
· HIGH SPEED ROAD - TRAFFIC APPROACH SPEED IS BETWEEN 60 KPH AND 80 KPH.
· VERY HIGH SPEED ROAD - TRAFFIC APPROACH GREATER THAN 80 KPH.
3. INSTALLATION OF SIGNS MUST BE SECURELY MOUNTED ON POSTS SO THEY ARE NOT
AFFECTED BY WEATHER, VANDALS OR TRAFFIC.
· FOR RURAL AREAS, THE HEIGHT OF SIGN MUST BE 1.5 METERS FROM THE TOP OF
THE ROADWAY TO THE UNDERSIDE OF THE SIGN.
WORKSITE 4. T RANSITION AREA (TAPER) -AN AREA WHERE DRIVERS ARE REDIRECTED OUTSIDE
OF THEIR NORMAL PATH.
· DEVICES USED FOR FORMING THE TAPER MAY BE TEMPORARY HAZARD
MARKERS, TRAFFIC CONES OR TEMPORARY BOLLARDS.
Bollards · THE SPACING FOR TRAFFIC CONES OR BOLLARDS TO CREATE A TAPER SHOULD BE
2 to 5meters apart 5 TO 10 METERS.
· NORMALLY EQUAL TO "D", HOWEVER WHEN WITH TRAFFIC CONTROLLER IT IS 30 METERS.
5. SPACING DISTANCE - "D"
· A BASIC SYSTEM FOR REMEMBERING THE SPACING OF SIGNS AND TAPER LENGTHS.
· A DISTANCE EXPRESSED IN METER EQUAL TO THE APPROACH SPEED OF TRAFFIC IN
KILOMETERS PER HOUR.
6. THE FIRST ADVANCED WARNING SIGN SEEN BY DRIVERS IS GENERALLY "WORK AHEAD"
· FIRST SIGN IS LOCATED 2D METERS BEFORE THE WORKS OR START OF TAPER - E.G. FOR
60 KPH APPROACH SPEED, THE DISTANCE IS 120 METERS PRIOR TO THE TAPER OR WORK AREA.
7. ADJACENT CLEARANCE AREA FOR WORKERS OR CLEARANCE BETWEEN TAPERS
AND THE WORK AREA.
· IT IS A LATERAL SAFETY BUFFER BESIDE THE WORK AREA THAT INCREASES PROTECTION
AND SAFETY FOR WORKERS.
· IN SLOW SPEED AREA IT WOULD GENERALLY BE A MINIMUM OF 1.2 METERS.
· IN HIGH SPEED AREAS A LARGER ADJACENT CLEARANCE IS DESIRABLE OR CONSIDERATION
GIVEN TO PROVIDING SPEED LIMIT.
8. A TRAFFIC CONTROLLER IS A PERSON WHOSE DUTY IS TO CONTROL TRAFFIC AT ROADWORK SITES
· THE TRAFFIC CONTROLLER MUST HAVE A 'WORKMAN SYMBOLIC SIGN' AND
A 'PREPARE TO STOP' SIGN.
Layout 1- Part Lane Closure, Road Working Area - 2 Lane, 2 Way Road, Low speed
SCALE NTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: CHECKED/REVIEWED : SUBMITTED : RECOMMENDED APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CORDILLERA ADMINISTRATIVE REGION CONCRETING OF SITIO COCOY TO SITIO · TRAFFIC MANAGEMENT
ALERDES SHANE G. ANTONIO
IFUGAO FIRST DISTRICT ENGINEERING OFFICE ABABBA, BRGY. TUKUCAN FMR, BRGY. ENGINEER I 18
LAGAWE, IFUGAO TUKUCAN, TINOC, IFUGAO PREPARED: FILEMON A. SALVADOR 21
JANICE MAE C. PULAO CYNTHIA O. DANGO ISAGANI C. CAYME ROMMEL E. FABI CHIEF,REGIONAL AGRICURTURAL ENGINEERING DIVISION
ZAIRON T. WIGAN DATE:
ENGINEER II,HEAD HIGHWAY DESIGN UNIT
DATE:
CHIEF, PLANNING & DESIGN SECTION
DATE:
ASSISTANT DISTRICT ENGINEER
DATE:
DISTRICT ENGINEER "DEPARTMENT OF AGRICULTURE - RFO-CAR"
ENGINEER II DATE:
50 X 50 HORIZONTAL 50 X 50 HORIZONTAL 50 X 50 HORIZONTAL
COCO LUMBER COCO LUMBER COCO LUMBER
DISPLAY AREA
(1200 X 2400 X 12 DISPLAY AREA BILLBOARD
1.2 m DISPLAY AREA 1.2 m (TARPAULIN ON 1200 X 2400 X 5 1.2 m
MARINE PYLWOOD) MARINE PLYWOOD)
EDGE OF ROAD
50 X 75 VERTICAL 50 X 75 VERTICAL 50 X 75 VERTICAL
1.0 m 1.0 m 1.0 m
COCO LUMBER COCO LUMBER COCO LUMBER
50 X 50 WOODEN STAKE GROUND LEVEL GROUND LEVEL GROUND LEVEL TRAFFIC DIRECTION
0.50 m 0.50 m 0.50 m
ROAD
1.0 m 2.4 m 2.4 m
BILLBOARD FRAME
SCALE NTS
2438mm
37mm
60mm WHITE BACKGROUND
CONSTRUCTION OF (Name of Project and Location) 90mm
30mm
CONSTRUCTION OF (Name of Project and Location)
90mm
CONTRACTOR : 26mm
55mm CONTRACTOR :
DATE STARTED : 23mm
55mm DATE STARTED :(Effectivity of contract)
CONTRACT COMPLETION DATE : 23mm
55mm CONTRACT COMPLETION DATE : BLACK TEXT
CONTRACT COST : 23mm
55mm CONTRACT COST :
1219mm
CONSTRUCTION CONSULTANT : 23mm
55mm CONSTRUCTION CONSULTANT :
IMPLEMENTING OFFICE : 23mm
55mm IMPLEMENTING OFFICE :(DPWH Office)
SOURCE OF FUND : 23mm
55mm SOURCE OF FUND :(Name of Fund with (Name of ODA)
23mm
DISPLAY AREA
DISPLAY AREA
(1200 X 2400 X 12 (TARPAULIN ON 1200 X 2400 X 5
1.2 m 1.2 m 1.2 m
MARINE PYLWOOD) MARINE PLYWOOD)
50 X 50 HORIZONTAL 50 X 50 HORIZONTAL 50 X 50 HORIZONTAL
COCO LUMBER COCO LUMBER
WHITE BACKGROUND COCO LUMBER
Name of Agency Name of Agency 2.4 m 2.4 m 2.4 m
Business Address Business Address
8 ft. X 8 ft. TARPULIN DISPLAY AREA
DISPLAY AREA
DISPLAY AREA
(1200 X 2400 X 12
1.2 m 1.2 m (TARPAULIN ON 1200 X 2400 X 5 1.2 m
MARINE PYLWOOD) MARINE PLYWOOD)
Duration Started Target Date of Percentage As of Cost Date Remarks Duration Started Target Date of Percentage As of Cost Date Remarks
Completion of of Incurred Completed Completion of of Incurred Completed
Completion (Date) to Date Completion (Date) to Date
BILLBOARD FRAME
SCALE NTS
For particular or complaints about this project, please contact the Regional Office or Cluster For particular or complaints about this project, please contact the Regional Office or Cluster
which has audit jurisdiction on this project: which has audit jurisdiction on this project:
COA Regional Office No./Cluster: ________________ COA Regional Office No./Cluster: ________________
Address: ____________________________________ Address: ____________________________________ BILLBOARD
Contact No. : __________ or Text COA Citizen's Desk at 0915-5391957 Contact No. : __________ or Text COA Citizen's Desk at 0915-5391957 EDGE OF ROAD
NOTE:
FONT SIZE: MAIN INFORMATION - 3"
COA PROJECT BILLBOARD SUB-INFORMATION - 1"
FONT COLOR: BLACK ROAD
ORIENTATION
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: CHECKED/REVIEWED : SUBMITTED : RECOMMENDED APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CORDILLERA ADMINISTRATIVE REGION CONCRETING OF SITIO COCOY TO SITIO · DPWH STANDARD PROJECT BILLBOARD
ALERDES SHANE G. ANTONIO
IFUGAO FIRST DISTRICT ENGINEERING OFFICE ABABBA, BRGY. TUKUCAN FMR, BRGY. · COA STANDARD PROJECT BILLBOARD ENGINEER I 19
LAGAWE, IFUGAO TUKUCAN, TINOC, IFUGAO PREPARED: FILEMON A. SALVADOR 21
JANICE MAE C. PULAO CYNTHIA O. DANGO ISAGANI C. CAYME ROMMEL E. FABI CHIEF,REGIONAL AGRICURTURAL ENGINEERING DIVISION
ZAIRON T. WIGAN DATE:
ENGINEER II,HEAD HIGHWAY DESIGN UNIT
DATE:
CHIEF, PLANNING & DESIGN SECTION
DATE:
ASSISTANT DISTRICT ENGINEER
DATE:
DISTRICT ENGINEER "DEPARTMENT OF AGRICULTURE - RFO-CAR"
ENGINEER II DATE:
YELLOW PAINTED POST
50mm
67mm 67mm 67mm 67mm
75mm 2021 50mm
F 115mm 75mm
2021 50mm
FMR 50mm
675mm
R ENGRAVED LETTER WITH REFLECTORIZED PAINT 575mm
0.208
KM
50mm
D 50mm
150mm
DETAILED OF REAR
DETAILED OF FRONT VIEW OF MARKER VIEW OF MARKER
FARM-TO-MARKET-ROAD MARKER
PERSPECTIVE VIEW OF PROPOSED PCCP W/ FMR MARKER
N T S
250mm 250mm
200mm 200mm
TYPICAL DETAIL OF PROPOSED PCCP W/ FMR MARKER TYPICAL DETAIL OF FARM TO MARKET ROADMARKER
SCALE 1:300m. SCALE 1:500m.
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: CHECKED/REVIEWED : SUBMITTED : RECOMMENDED APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CORDILLERA ADMINISTRATIVE REGION CONCRETING OF SITIO COCOY TO SITIO · FMR ROAD MARKER
ALERDES SHANE G. ANTONIO
IFUGAO FIRST DISTRICT ENGINEERING OFFICE ABABBA, BRGY. TUKUCAN FMR, BRGY. ENGINEER I 20
LAGAWE, IFUGAO TUKUCAN, TINOC, IFUGAO PREPARED: FILEMON A. SALVADOR 20
JANICE MAE C. PULAO CYNTHIA O. DANGO ISAGANI C. CAYME ROMMEL E. FABI CHIEF,REGIONAL AGRICURTURAL ENGINEERING DIVISION
ZAIRON T. WIGAN DATE:
ENGINEER II,HEAD HIGHWAY DESIGN UNIT
DATE:
CHIEF, PLANNING & DESIGN SECTION
DATE:
ASSISTANT DISTRICT ENGINEER
DATE:
DISTRICT ENGINEER "DEPARTMENT OF AGRICULTURE - RFO-CAR"
ENGINEER II DATE:
Proposed Curb & Gutter Proposed Stone Masonry
@Sta. 0+000 - Sta. 0+2
15 @Sta. 0+030 - Sta. 0+112
L=215 m (LEFT SIDE) L=82 m, H=3.0m
LEGENDS:
PROPOSED PCCP
EXISTING PCCP
* NOTE: LENGTH OF PROPOSED PCCP IS EQUAL TO 0.430 LANE Km./ 0.215 Km
PROPOSED STONE MASONRY
PROPOSED BREASTWALL
PROPOSED CRIBWALL
PROPOSED C&G
PROPOSED RCPC
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: CHECKED/REVIEWED : SUBMITTED : RECOMMENDED APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CORDILLERA ADMINISTRATIVE REGION CONCRETING OF SITIO COCOY TO SITIO · STRAIGHT LINE DIAGRAM
ALERDES SHANE G. ANTONIO
IFUGAO FIRST DISTRICT ENGINEERING OFFICE ABABBA, BRGY. TUKUCAN FMR, BRGY. ENGINEER I 21
LAGAWE, IFUGAO TUKUCAN, TINOC, IFUGAO PREPARED: FILEMON A. SALVADOR 21
JANICE MAE C. PULAO CYNTHIA O. DANGO ISAGANI C. CAYME ROMMEL E. FABI CHIEF,REGIONAL AGRICURTURAL ENGINEERING DIVISION
ZAIRON T. WIGAN DATE:
ENGINEER II,HEAD HIGHWAY DESIGN UNIT
DATE:
CHIEF, PLANNING & DESIGN SECTION
DATE:
ASSISTANT DISTRICT ENGINEER
DATE:
DISTRICT ENGINEER "DEPARTMENT OF AGRICULTURE - RFO-CAR"
ENGINEER II DATE: