This checklist outlines standards for demolition and alteration projects. It includes checking for proper permits, safety precautions, protecting utilities and reusable materials, fully demolishing structures, obtaining approvals, inspecting existing conditions, and providing warranties. The checklist is to be completed by the site supervisor and reviewed by the officer in charge to verify compliance with 11 categories covering general requirements, demolition, and alterations.
This checklist outlines standards for demolition and alteration projects. It includes checking for proper permits, safety precautions, protecting utilities and reusable materials, fully demolishing structures, obtaining approvals, inspecting existing conditions, and providing warranties. The checklist is to be completed by the site supervisor and reviewed by the officer in charge to verify compliance with 11 categories covering general requirements, demolition, and alterations.
This checklist outlines standards for demolition and alteration projects. It includes checking for proper permits, safety precautions, protecting utilities and reusable materials, fully demolishing structures, obtaining approvals, inspecting existing conditions, and providing warranties. The checklist is to be completed by the site supervisor and reviewed by the officer in charge to verify compliance with 11 categories covering general requirements, demolition, and alterations.
This checklist outlines standards for demolition and alteration projects. It includes checking for proper permits, safety precautions, protecting utilities and reusable materials, fully demolishing structures, obtaining approvals, inspecting existing conditions, and providing warranties. The checklist is to be completed by the site supervisor and reviewed by the officer in charge to verify compliance with 11 categories covering general requirements, demolition, and alterations.
A GENERAL 1 Obtained permit to demolish Y N NA 2 Approved the demolition sequence and methodology Y N NA 3 Liaise with relevant authority to occupy the place continuously Y N NA 4 Adequate precautions provided to protect all services Y N NA 5 Provided all necessary and adequate dust sheet and shoots Y N NA 6 Provided precautions to prevent nuisance Y N NA 7 Obtained OIC's permission for retaining/removing any material Y N NA salvaged from the demolition 8 Reported bench marks found on buildings to OIC Y N NA 9 No tree is fallen or removed without OIC's approval Y N NA 10 Reusable materials are protected from damage, cleaned and Y N NA overhauled for re-use 11 All demolition debris and rubbish cleared and removed Y N NA B DEMOLITION 1 Liaised with electricity, gas, water supply and telecommunication Y N NA authorities for proper disconnection 2 Provided adequate support/shoring/strutting & protection at Y N NA each stage and inspected by OIC 3 Existing building & structure are completely pulled down to the Y N NA level of the adjacent ground or paving or to the underside of the lowest floor or paving whichever is the lowest C ALTERATION 1 Obtained permission from the occupants or OIC Y N NA 2 Turned off all existing services Y N NA 3 Floors, walls and furniture are covered up Y N NA 4 Furniture, fittings, furnishing and all contents of existing building Y N NA are carefully removed and stored 5 Provided all necessary temporary coverings to existing buildings Y N NA or works exposed to weather 6 Provided temporary barriers blocking up all openings and/or Y N NA necessary watching and security measures 7 Existing premises not used for storage/canteen/sanitary or other Y N NA purposes (unless so specified or permitted by OIC) 8 Reported to OIC the defects discovered in existing building Y N NA 9 Carried out thorough examination of the existing roof, slab and Y N NA the condition of existing finishes 10 Waterproofing water installed in accordance with specification Y N NA and manufacturer's product instruction 11 10 years warranty provided for roofing and waterproofing Y N NA product and workmanship Name of SS: Name of OIC: Checked & Signed: Reviewed Non-compliance: Verified & Signed: Reviewed Non-compliance: