Checklist1402 - Water Storage Tank

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Water Storage Tank CHECKLIST 1402

Project

NO. STANDARD CHECK REMARKS


A GENERAL
1 Submitted detail information (type, make, material etc.) of the Y N NA
proposed water storage tank to and approved by OIC and DWS
2 Submitted the name of authorised local supplier, specialist (listing Y N NA
name) and the contractor to OIC prior to any installation work
3 Submitted the shop drawings inclusive of proposed water Y N NA
pumping system to and approved by OIC and DWS
4 Tanks are tested for strength and water tightness as required by Y N NA
DWS
5 Provided enough working space, access door, ladder and lights at Y N NA
water tank area for any future repair and maintenance
B INSTALLATION
1 All water tanks are installed strictly in accordance with Y N NA
manufacturer's instructions and requirements
2 For water tanks installed in the ceiling void, warning pipes and Y N NA
drip trays with proper discharge are provided to prevent water
from damaging the ceiling board and other services
3 For water tank installed outside the building, overhead shelters Y N NA
and security fencing are provided
4 Individual water storage tank is provided and installed for each Y N NA
unit within the flat
5 Bypass system of pipe works with control valves, a non return Y N NA
valve and a vent pipe is provided at the discharge pipe of the
storage tank to prevent air lock
6 Installed warning pipe and drain pipe (to discharge water Y N NA
properly to nearby drain)
7 All support structures for the water tank are installed as per Y N NA
manufacturer's instructions and requirements
8 Water tank's level indicator installed Y N NA
9 Separate water storage tank is provided for fire hose reel Y N NA
10 Min. of 1 metre spacing is provided between each water tank Y N NA
11 All the plumbing installation works are carried out as per Y N NA
construction drawing
C COMPLETION
1 Completed installation is checked to ensure compliance with Y N NA
contract requirements, specifications etc.
2 Cleaned and sterilised the water storage tank before use Y N NA
3 Submitted minimum 5 years warranty against the quality of water Y N NA
tank to OIC
4 The volume of the water storage tank is: Y N NA
____________ cu.m.

Name of SS: Name of OIC:


Checked & Signed: Reviewed Non-compliance: Verified & Signed: Reviewed Non-compliance:

Date: Date: Date: Date: