This document is a checklist for commissioning a Neutral Earthing Resistor (NER) for a National Grid substation. The two-page checklist outlines 11 items to inspect and test, including visual checks, verifying nameplate data matches specifications, checking earth connections and resistances, insulation resistance testing, and cleaning before energization. Upon completing the checks, the checklist is to be signed by representatives from National Grid's Construction and Support Division, the contractor, and the Testing and Commissioning contractor.
This document is a checklist for commissioning a Neutral Earthing Resistor (NER) for a National Grid substation. The two-page checklist outlines 11 items to inspect and test, including visual checks, verifying nameplate data matches specifications, checking earth connections and resistances, insulation resistance testing, and cleaning before energization. Upon completing the checks, the checklist is to be signed by representatives from National Grid's Construction and Support Division, the contractor, and the Testing and Commissioning contractor.
This document is a checklist for commissioning a Neutral Earthing Resistor (NER) for a National Grid substation. The two-page checklist outlines 11 items to inspect and test, including visual checks, verifying nameplate data matches specifications, checking earth connections and resistances, insulation resistance testing, and cleaning before energization. Upon completing the checks, the checklist is to be signed by representatives from National Grid's Construction and Support Division, the contractor, and the Testing and Commissioning contractor.
This document is a checklist for commissioning a Neutral Earthing Resistor (NER) for a National Grid substation. The two-page checklist outlines 11 items to inspect and test, including visual checks, verifying nameplate data matches specifications, checking earth connections and resistances, insulation resistance testing, and cleaning before energization. Upon completing the checks, the checklist is to be signed by representatives from National Grid's Construction and Support Division, the contractor, and the Testing and Commissioning contractor.
Download as DOC, PDF, TXT or read online from Scribd
Download as doc, pdf, or txt
You are on page 1of 2
NATIONAL GRID
Title: Index Number:
CL-NG-6460-002-022 Check List of Neutral Earthing Resistor (NER) Commissioning Page Number: 1 of 2
1.0 Equipment General Data and Information
Substation NATIONAL GRID
Bay/Panel NATIONAL GRID Equipment NATIONAL GRID Serial No NATIONAL GRID 2.0 Check List of NER Commissioning and Testing
Item Description Done Remarks
1. Visual inspection for any insulator broken.
2. Check nameplate and data. Check the value of resistance and current ratings against 3. the specifications. Checks that the earthing with solderless connectors and suitable for termination of copper conductor of size 240 mm2 for 40 kA and below. 4. Check the grounding resistance of the enclosure earth terminal and resistor earth terminal. Confirm the continuity and tightness of the Bolt & Nut.
Check the resistor rated for 5 Seconds unless specified in
5. data schedule.
6. Test associated NCT & power cable.
Main circuits Resistance measurement test at ambient temperature. The resistor provided in the NER panel/box 7. shall be measured (after disconnecting the leads) and it should match with the name plate. 8. Insulation resistance measurement test at 5kV DC
Cleaning of all internal as well as external to NER before
9. energization.
Check that the enclosure earth terminal and resistor earth
10. terminal are separate to allow the possibility of disconnection during testing.
Archiving System Website: http://AMAS
NATIONAL GRID
Title: Index Number:
CL-NG-6460-002-018 Checklist for Commissioning of Oil-Immersed Power Transformer Page Number: 2 of 2
Check if heater circuit is provided, it cutoff automatically,
11. when Transformer is in service and cut in automatically, when transformer is taken out of service.