1 Outdoor Substation Calculation
1 Outdoor Substation Calculation
1 Outdoor Substation Calculation
ITEM NO
I
A
E
F
G
II
A. Equipment
1.0
3.0
4.0
5.0
C. Testing
1.0
2.0
III
A. Equipment
1.0
2.0
3.0
4.0
5.0
IV
A. Equipment
1.0
2.0
3.0
4.0
5.0
6.0
7.0
V
A. Equipment
1.0
2.0
3.0
4.0
5.0
6.0
4.0
7.0
8.0
VI
A. Equipment
1.0
2.0
3.0
4.0
5.0
6.0
7.0
VII
A. Equipment
1.0
2.0
3.0
4.0
5.0
6.0
VIII
A. Equipment
1.0
2.0
3.0
4.0
5.0
6.0
IX
A. LOW VOLTAGE SIDE
1.0
2.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
B. HIGH VOLTAGE SIDE
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
X
A. Digging, Cable Layout, Backfilling, Termnation and Pre-commissioning Test
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
XI
A. Digging, Cable Layout, Backfilling, Termnation and Pre-commissioning Test
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
6.0
7.0
8.0
9.0
10.0
11.0
GENERAL REQUIREMENTS
Project Documentations, Including Shop Drawings, Construction Drawings, lot
Bar Chart & Detailed Project Installation Methodology, Detailed Manpower
& Equipment to be used for the duration of the works
Terminal Lugs, bolts, nuts, washers, and other consumable materials lot
Automatic Circuit Recloser, 14.4kV, 3Phase, Oil Free, Gas Free, Vaccum lot
Type
Hot Dipped Galvanized Steel Structure lot
Termination and Pre-commissioning testing lot
Equipment Groundings lot
Miscellaneous Consumable Materials lot
Sub-Total III
INSTALLATION OF 14.4 kV LOAD BREAK SWITCH 1
Load Break Switch, 15 kV, 3P, Outdoor Type, group operated pcs
Load Break Switch, 15 kV, 3P, Outdoor Type, group operated pcs
ACB 8000AT, 3P, 60Hz, 400V, Fixed Type in Nema3R Free Standing lot
Enclosure
Lifting Hauling, positioning and installation of Station Service Dry Type lot
Transformer
Station Service Panel and Enclosure lot
Equipment Groundings lot
Termination and Pre-commissioning testing lot
Miscellaneous Consumable Materials lot
Sub-Total VIII
INSTALLATION OF SECONDARY AND PRIMARY WIRES AND CONNECTORS
TAGE SIDE
250mm2 THHN, Cu Wires mtr
Cable Trays and mounting Support pcs
Terminal Lugs pcs
Extension Busbar, 4000Amp set
Machine Bolt, 1/2 x 3" pcs
Cable Ties lot
PVC Elbow, long, 4" pcs
PVC Pipe, 4" pcs
PVC Endbell, 4" pcs
TAGE SIDE
100mm2 XLPE Power Cable, 15kV mtr
100mm2 Bare Copper Wire mtr
Termination Kit, #4/0 AWG, 15kV sets
Terminal Connectors pcs
Cable Trays and mounting Support pcs
PVC Elbow, long, 4" pcs
PVC Pipe, 4" pcs
PVC Endbell, 4" pcs
Cable Ties lot
Miscellaneous Consumable Materials lot
Sub-Total IX
INSTALLATION SUBSTATION GRID BUS GROUNDING SYSTEM
able Layout, Backfilling, Termnation and Pre-commissioning Test
Digging & Backfilling lm
Grounding conductors, 100mm2 Bare copper mts
Ground Rod Copper Clad, 5/8" x 10 Ft pcs
Cross Type Thermal Connector, 100x100mm2 pcs
Tee Type Thermal Connector, 100x100mm2 pcs
Ground Rod to 100mm2 Thermal Connector pcs
Terminal Lugs, long barrel 1 hole, 100mm2 pcs
Test pit pcs
Cross Type Thermal Molding pcs
Tee Type Thermal Molding pcs
Ground Rod to 100mm2 Thermal Molding pcs
Igniter pcs
Grounding Clamp pcs
Termination and Pre-commissioning testing lot
Other materials to complete the system lot
Sub-Total X
NT FOUNDATION WORKS
Concrete Foundation for 2.5MVA Transformer lot
Concrete Foundation for 15kV Recloser lot
Concrete Foundation for 15kV Load Break Switch lot
Concrete Foundation for LV Switchgear lot
Secondary and Primary Stubouts lot
1.00 - - 260,000.00
PHP
E
TOTAL EXTENDED
REMARKS
PRICE ( A X D)
53,352.00
88,920.00
133,380.00
260,000.00
53,352.00
53,352.00
44,460.00
686,816.00
3,461,040.00
30,688.00
10,670.40
7,825.20
11,559.60
8,892.00
540,360.00
62,244.00
4,133,279.20
998,982.00
80,028.00
165,870.00
6,224.40
3,556.80
1,254,661.20
707,940.00
80,028.00
66,348.00
9,336.60
42,681.60
8,892.00
3,556.80
918,783.00
124,488.00
49,795.20
35,568.00
3,738.00
14,227.20
10,670.40
18,673.20
40,903.20
3,556.80
301,620.00
226,540.80
235,980.00
106,704.00
44,460.00
91,245.60
112,039.20
3,556.80
820,526.40
707,940.00
66,348.00
9,336.60
21,340.80
8,892.00
3,556.80
817,414.20
1,046,964.60
266,760.00
213,408.00
9,336.60
181,020.60
8,892.00
1,726,381.80
909,783.00
21,340.80
32,013.00
355,680.00
1,071.00
3,557.00
56,910.00
16,006.00
2,846.00
85,365.00
46,032.00
64,022.40
80,028.00
21,340.80
22,764.00
6,402.40
1,138.40
711.40
8,892.00
1,735,903.20
80,028.00
207,144.00
48,016.80
41,082.30
35,213.40
21,519.30
23,476.20
21,340.80
23,119.20
23,119.20
11,559.60
1,778.75
6,670.00
62,244.00
8,892.00
615,203.55
24,453.00
56,908.80
2,846.40
12,455.00
16,008.00
9,885.00
13,000.75
3,557.50
7,113.60
8,892.00
155,120.05
177,840.00
71,136.00
71,136.00
71,136.00
10,670.40
284,544.00
13,338.00
266.80
889.20
80,028.00
62,244.00
843,228.40
113,817.60
29,904.00
48,372.60
22,585.75
16,005.60
2,490.00
1,974.60
13,338.00
9,070.20
8,536.50
266,094.85
14,275,031.85
1 2500 MVA TRANSFORMER SP
CAPACITY
Primary Voltage
Secondary Voltage
Impedance Voltage
INSULATION WITHSTAND
H.V
L.V.
Frequency
Short Apparent Power
STANDARD
DESIGN ANALYSIS
Primary
Current
2
2
to 6%)
4
ltage >600V):
nt or next lower standard size. 5
load current or next lower standard size.
ry Voltage <=600V):
Sec. Full Load Current or Next higher Standard size.
ry Voltage >600V):
urrent or Next Lower Standard size.
0% of Sec. Full Load Current or Next Lower Standard s
6
7
2500 MVA TRANSFORMER SPECIFICATION
PROTECTIVE RELAYING
HV Winding
Relay Current = 1.5 (109) / 80 = 2.04 A
Time Limit Range = 0.5 - 4 A
Relay Tap to be used = 2A
VOLTAGE TRANSFORMER
Primary voltage: 34.5 kV 34.5 kV
Secondary voltage: 115 V 115 V
Voltage Transformation Ratio 300:1 VTR
BIL 95 kV
Standard IEC
NOTE
A W PF WH