Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Structural Design Consultant

Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

PRASHANTZENVERMA@GMAIL.

COM

PRASHANT VERMA
M.E. STRUCTURAL ENGINEER (BITS PILANI), B.tech. CIVIL ENGINEER, IGBC AP Associate,

STRUCTURAL ENGINEERING CONSULTANCY

2023
Company
PRASHANTZENVERMA@GMAIL.COM

ZEN CONSULTANCY

A consultancy firm that deals with solving problems in the


construction industry with the most sustainable and better
representation using the latest techniques resulting in great
outcomes.

WE LOOK FOR COMPASSION, COMMITMENT, AND COLLABORATION


WHEN WE WORK TOGETHER.

2023
Company
PRASHANTZENVERMA@GMAIL.COM

SERVICE WE OFFER

STRUCTURAL DETAILED DRAWINGS SITE SUPERVISION COST ESTIMATION


We provide a detailed structural drawing We ensure that the drawing done on the We provide detailed project cost reports
containing accurate measurements and sheet is properly executed on-site and with cost and quantity estimation at
essential cross-sections of any detailing that the structural stability of the critical stages for pre-preparation in site
needed for accurate construction. building is ensured. and proper workflow

further continued..... further continued..... further continued ...

2023
Company
PRASHANTZENVERMA@GMAIL.COM

RESIDENTIAL PROJECT -1
BUNGALOW WITH TOTAL 4000 sqft
GF - 1BHK
FF - 3BH
SF - UTILITY HALL

A BUNGALOW PROJECT FOR Smt.


MALANI SHARMA BASED ON RAIPUR
(C.G) WITH TOTAL AREA MORE THAN
4000 sqft WAS NEEDED TO PREPARED
FOR CONSTRUCTION PROCESS.

2023
Company
PRASHANTZENVERMA@GMAIL.COM

STRUCTURAL DRAWINGS
WORKFLOW-
1. Architectural plan
2. Confirmation of column positions
3. Confirmation of Beam alignment.
4. Formation of working drawings.

STRUCTURAL DRAWINGS WILL CONTAIN -


1. Column position at various levels.
2. Column & Footing schedule.
3. Column centerline layout plan.
4. Footing positioning and excavation plan.
5. Plinth beam plan.
6. Plinth beam details.
7. Ground floor roof beam & Slab plan.
8. Ground floor roof beam & Slab details.
Similarly, working drawings and detailing will
be provided for any further sections.
2023
Company
PRASHANTZENVERMA@GMAIL.COM

STAGE - 1
COLUMN POSITION AT VARIOUS LEVELS.

Ground Floor First Floor

Column position is the first critical stage and requires concern authority approval for further progress so
that further hindrance in working model and rework can be avoided.
2023
Company
PRASHANTZENVERMA@GMAIL.COM

STAGE-2
COLUMN AND FOOTING SCHEDULE/COLUMN CENTERLINE PLAN

Column and Footing schedule Column Centerline plan


Column and footing schedule containing details of reinforcement, cross-section, and any construction details
required during construction.
Column centerline plan contains accurate positioning column for accurate placement of column while
construction.
2023
Company
PRASHANTZENVERMA@GMAIL.COM

STAGE-3
FOOTING CENTERLINE PLAN / ECCENTRIC AND COMBINE DETAIL SECTION

Footing centerline plan Eccentric and combine Footing detail section


The footing centerline plan contains accurate positioning footing and excavation details for accurate placement of
footing while construction.
Footing details contains cross-section of critical sections which helps the contactor to understand the process in a
more effective manner.
2023
Company
PRASHANTZENVERMA@GMAIL.COM

STAGE-4
PLINTH BEAM PLAN AND DETAILS

Plinth beam plan Plinth beam details

Plinth beam plan and details containing working plan and beam reinforcement details with the critical cross-
section.

2023
Company
PRASHANTZENVERMA@GMAIL.COM

STAGE-4
GROUND BEAM ROOF SLAB PLAN AND DETAILS

Ground floor roof slab beam plan Ground floor roof slab beam details

Ground floor roof slab beam plan and details containing working plan and beam reinforcement details with the
critical cross-section and slab reinforcement.
And so on for further floors...
2023
Company
PRASHANTZENVERMA@GMAIL.COM
WARDIERE INC.

COST ESTIMATION
It will include a detailed quantity as well as a cost estimate of the materials such as-
1. Concrete
2. Steel
3. Finishing works (flooring, plastering, primer, paint)

2023
Company
PRASHANTZENVERMA@GMAIL.COM

CONCRETE QUANTITY

An estimate of the quantity of concrete required for PCC, Footing, Column, Beam, and Slab is calculated. After this, a detailed
report of quantities of sand, cement, and aggregates will be provided along with the rate analysis of the materials as per the
current market rates.
2023
Company
PRASHANTZENVERMA@GMAIL.COM

STEEL QUANTITY

An estimate of the quantity of steel required for the Footing, Column, Beam, and Slab is calculated in a detailed Bar Bending
Schedule (BBS). The BBS contains the total number of bars required, along with the representation of each bar with the
dimensions specified for each bend of the bar.

2023
Company
PRASHANTZENVERMA@GMAIL.COM

FINISHING WORK

Finishing work includes the quantity of materials required for flooring (no. of tiles), Plastering (internal/external plaster),
Brickwork/ AAC blockwork (no. of bricks/ blocks), Painting (putti, primer,paint).

2023
Company
PRASHANTZENVERMA@GMAIL.COM
WARDIERE INC.

SITE VISIT SUPERVISION


We have a technical team with experienced seniors ready to provide any technical guidance
through various stages of construction.
We are open to any modifications that can be convenient depending on the site..

2023
Company
PRASHANTZENVERMA@GMAIL.COM

WAITING FOR COLLABORATIVE ARCHITECTS FOR


NEW-AGE CONSTRUCTION
THANK YOU

P R A S H A N T V E R M A - 8 9 6 6 0 0 2 6 6 4

2023
Company

You might also like