Quality Gate Inspection Checklist For Truck Body and Equipment - 01!13!23

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

TRUCK BODY AND EQUIPMENT

QUALITY GATE INSPECTION CHECKLIST

CUSTOMER:
ALLEYWAY CONSTRUCTION

VEHICLE TYPE: VW BOOM CRANE TRUCK W/ DROPSIDE UNIT #:


VEHICLE: VOLKSWAGEN TRUCK MODEL: CONSTELLATION 14.190 ROBUST
BODY: DY BOOM CRANE AND DROPSIDE CURRENT MILEAGE:
CONDUCTION NUMBER: UO C449 DATE CHECKED:
CHASSIS NUMBER: 9536E7231NR027931 DATE COMPLETED:
ENGINE NUMBER: 0156085A036085 DATE RELEASED:
TOTAL VEHICLE WEIGHTING: DEPARTMENT: ENGINEERING

COMPONENTS CHECKPOINTS QUANTITY | DESCRIPTION ✓


BODY
1. DROP SIDE BODY
2. DROP SIDE BODY PAINTING
3. BOTTOM FRAME ASSEMBLY
4. HEADBOARD
5. LEFT FOLDING SIDE FENCE
6. RIGHT FOLDING SIDE FENCE
7. REAR FOLDING SIDE FENCE
8. FENCES’ LOCKS
9. FENCES’ HINGES
10. LADDER
11. CLEARANCE LIGHTS
ELECTRICAL HARNESS WITH LOOM
CLEARANCE LIGHTS OPERATION

BABY CHASSIS
1. BABY CHASSIS
2. MOUNTING BRACKET LEFT / RIGHT

EQUIPMENT
1. BOOM CRANE:
MODEL NAME:
SERIAL NUMBER:
CAPACITY:
2. ROTARY COLUMN
3. BASE
4. THROTTLE JOYSTICK CONNECTION
THROTTLE JOYSTICK OPERATION
5. OPERATING MECHANISM
6. HOISTING MECHANISM
7. WIRE ROPE
8. OPERATION SEAT
9. WORK LAMP
WORK LAMP OPERATION
10. LUFFING CYLINDER
11. BOOM
12. LOAD INDICATOR
13. HOOK ASSEMBLY
14. OUTRIGGER ASSEMBLY
15. BOOM CRANE OPERATION

Page 1 of 2
TRUCK BODY AND EQUIPMENT
QUALITY GATE INSPECTION CHECKLIST

MUDGUARDS
1. MUDGUARD LEFT / RIGHT

SIDE RAILINGS
1. SIDE RAILINGS LEFT / RIGHT

BUMPER
1. REAR BUMPER

HYDRAULIC SYSTEM
1. PTO
MODEL:
PART NUMBER:
SERIAL NUMBER:
PTO OPERATION
2. PUMP
BRAND:
PART NUMBER:
SERIAL NUMBER:
PUMP OPERATION
3. OIL TANK
OIL TANK STRAPS WITH RUBBER
AIR FILTER
RETURN FILTER
BALL VALVE
4. TIPPING VALVE
5. HIGH PRESSURE HOSE
6. LOW PRESSURE HOSE
7. AIR TUBE KIT
8. ADAPTORS:
STRAIGHT ADAPTOR
90 DEGREE ADAPTOR
SWIVEL ADAPTOR

ACTIVATING AND CONTROLLING THE HYDRAULIC SYSTEM


1. PTO ROCKER SWITCH
ELECTRICAL HARNESS WITH LOOM
2. FUSE WITH HOLDER
3. SOLENOID VALVE

COMMENTS/REMARKS REWORKS/RECTIFICATIONS FINAL CHECK/STATUS

INSPECTOR: QUALITY GATE HEAD: PROJECT COORDINATOR: MANAGER:

CHARLIE QUINAN RONALD PETINES DAVE GUINTO

Page 2 of 2