Water Supply BOQ
Water Supply BOQ
Water Supply BOQ
Stage 01
Network Pipes (HDPE)
Supply and install HDPE (PE 100 SDR 11 ) pipes for water networks, pressure class 16.00 bars, including all fittings laid in tre
200 mm dn
Air valve Chamber for Main Network
Reinforced Concrete Air valve chamber on nominal bore : 75 mm, including excavation, concrete works, valves, associated pi
cover, backfilling etc. complete in all respects and in accordance to schedule of Project requirements, particular specification
concept drawings.
on 200 mm dn main pipe
Wash valve Chamber for Main Network
Supply, construct, and equip, Washout Valve Chamber, complete with all valves, fittings and accessories; including excavati
material, reinforced concrete chamber with all structural works, stairs, covers and frames, backfilling using suitable material
removal of excess materials, connection to main pipe, etc.; as specified and detailed on drawings.
Reinforced Concrete Isolation valve chamber : including excavation, concrete works, valves, associated pipe fittings, chamb
etc. complete in all respects and in accordance to schedule of Project requirements, particular specifications and as shown o
150mm dn
Air valve Chamber for Main Network
Reinforced Concrete Air valve chamber on nominal bore : 75 mm, including excavation, concrete works, valves, associated pi
cover, backfilling etc. complete in all respects and in accordance to schedule of Project requirements, particular specification
concept drawings.
on 200 mm dn main pipe
Wash valve Chamber for Main Network
Supply, construct, and equip, Washout Valve Chamber, complete with all valves, fittings and accessories; including excavati
material, reinforced concrete chamber with all structural works, stairs, covers and frames, backfilling using suitable material
removal of excess materials, connection to main pipe, etc.; as specified and detailed on drawings.
Nr 1
Nr 1
Nr 1
Nr 23
Nr 1
ding excavation in any kind of
ble materials, compaction, and
rawings.
Nr 2
Nr 1
Nr 1
Nr 1