13044-QSH-PP-023 Testing Precommissioning Rev.55
13044-QSH-PP-023 Testing Precommissioning Rev.55
13044-QSH-PP-023 Testing Precommissioning Rev.55
Method Statement
13044-QSH-PP-023
5 20/09/2017 Test sections TJ and filling point are changed BVLI � RALD
4 14/07/2017 Details of cock valves, equipment and filh"ng are added BVLI DDS/'1 RALD
3 24/05/2017 Revision of test pressures and test set up BVLI DDS/'1 RALD
2 26/01/2017 Alternative structure for PS1 and VVTP to fill the pipe BVLI DDS/'1 DDS/'1
1 12/12/2016 Changed Test pressures - added information about counter pressure BVL/ DDS/'1 DDS/'1
STATUS (Concept/Final/Deleted):
Distribution:
□ENVS
Project 13044 - FIPAG - Maputo
Reference 13044-QSH-PP-023
Testing & Precommissioning Revision ROS
The Contractor is responsible for providing all material and equipment required fo,- pipeline pressure
tests, including pumping equipment and its set-up.
Test sections T2
Section From To DP (bar) TP {bar) L (mtr)
1 Blind Flange (KP 0) SV 2.1 (KP 7.01) 5,8 9,4 7011
2 SV 2.1 (KP 7.01) Blind Flange (KP 10.93) 4,2 7,6 3828
Test sections T3
Section From To DP (bar) TP (bar) L (mtr)
1 Blind Flange (l<P 0) SV 3.1 (KP 3.50) 13,2 15 3500
2 SV 3.1 (KP 3.50) SV 3.2 (KP 14.635) 12,8 15,6 11130
3 SV 3.2 (KP 14.635) AV 3.28 (KP 26+386) 8,9 14,2 11751
4 AV 3.28 (KP 26+386) lncomati River (KP 34+329) 7,4 11,1 7943
5 SV3.3 (KP 33+647) SV 3.4 (KP 41+486) 7,4 10 7839
6 SV 3.4 (KP 41+486) SV 3.5 (KP 46+978) 5,2 7,9 5492
4
DENYS
Project 13044 - FIPAG - Maputo
Reference 13044-QSH-PP-023
Testing & Precommissioning Revision ROS
Missing Construction
c:,. ---·-
l �l�-
Figure 1: Drawing 40089-GEN-A-007 - General Flow diagram with marked items: Green: part 1 of the Contract, Red: part 2
of the Contract, for detail see appendix.
Since at this stage the Contractor of Part 2 has not yet started, the pump station and the water
treatment plant are not ready.
Filling Stretch T2
At the pumping station area, a basin will be used as a buffer for the pump. A container will be placed
in the grnund and directly connected to the valve on the reduction fiange at the end of T1. A 1 O"
pump will be used to pump the water to Stretch T2, see Figure 2. Ductile iron pipe or HDPE pipe
will be used to connect the outlet of the pump to the start of Stretch T2.
6
Project 13044- FIPAG - Maputo
DENYS Reference 13044-QSH-PP-023
Testing & Precommissioning Revision ROS
6. Process
Test preparation
Repair the
Pipe lilling
main
YES
Pressurize
find the
fault(s)
NEGATIVE
10