Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Laverna - Master Plan

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Basic Design Discharge

Existing retarding basins

1 4
2

T1 T2 5

1 2 3 4 5 6 T1 T2

Chainage (km) 5.00 4.82 4.25 3.25 1.27 0.00 0.95 0.00 Drainage Area =5.97km2
Basic Design Flood
42 42 65 79 108 141 11 22
Discharge (m3/s)

63
La Verna Area

La Verna Area
On-going Project
1) Dredging of existing channel
2) Replacement of cross drains
3) Installation of pumping stations (2m3/s)
4) Retarding Basin (V=65,000m3) (Partial)
5) Underground pipe (D=3m, L =300m)
6) Channel improvement downstream of outlet of underground pipe

Additional Measures:
1) Retarding Basin (V=65,000m3) (Remaining)
2) Retarding Basin (V=20,000m3)

1 2 3 4 5 6

Chainage (km) 5.00 4.82 4.25 3.25 1.27 0.00

Basic Design Flood


42 42 65 79 108 141
Discharge (m3/s)
Design Flood
42 6 16 12 51 86
Discharge (m3/s)

64
La Verna Area Improvement
La Verna area

Pump Underground pipe

Replacement of
cross drains

On-going Project Additional Measures


1) Dredging of existing channel : 550m 1) Retarding Basin① (Remaining)
2) Replacement of cross drains : 3m x 3m x 110m, D3m x 130m V=65,000m3, A=13,000m2, D=5m)
3) Installation of pumping stations (2m3/s) 2) Retarding Basin②
4) Part of Retarding Basin① (V=65,000m3, A=13,000m2, D=5m) V=20,000m3, A=5,000m2, D=4.0m
5) Underground pipe (D=3m, L =300m)
6) Channel improvement downstream of outlet of underground pipe
(L=650m) 65

You might also like