Laverna - Master Plan
Laverna - Master Plan
Laverna - Master Plan
1 4
2
T1 T2 5
1 2 3 4 5 6 T1 T2
Chainage (km) 5.00 4.82 4.25 3.25 1.27 0.00 0.95 0.00 Drainage Area =5.97km2
Basic Design Flood
42 42 65 79 108 141 11 22
Discharge (m3/s)
63
La Verna Area
La Verna Area
On-going Project
1) Dredging of existing channel
2) Replacement of cross drains
3) Installation of pumping stations (2m3/s)
4) Retarding Basin (V=65,000m3) (Partial)
5) Underground pipe (D=3m, L =300m)
6) Channel improvement downstream of outlet of underground pipe
Additional Measures:
1) Retarding Basin (V=65,000m3) (Remaining)
2) Retarding Basin (V=20,000m3)
1 2 3 4 5 6
64
La Verna Area Improvement
La Verna area
Replacement of
cross drains