OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
Index
01 INTRODUCTION 03
02 CONTRACTUAL AND LEGAL INFORMATION 04
03 SCOPE OF WORKS 05
04 EQUIPMENT SCHEDULE & ASSET REGISTER 06
05 OPERATING INSTRUCTIONS & PROCEDURES 09
06 MAINTENANCE PROCEDURES 11
07 SPARE & REPLACEMENT PARTS 15
08 HSE & DISPOSAL INSTRUCTIONS 16
09 TESTING & COMMISSIONING REPORTS 18
10 MODIFICATIONS 19
11 AS BUILT DRAWING LISTS 20
12 PRODUCT WARRANTIES AND GUARANTIES 21
13 MANUFACTURER & SUPPLIER LITERATURE 22
Page 2 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
SECTION - 1
INTRODUCTION
This O&M Manual features all of the information needed to effectively and efficiently operate
and maintain the respective system covered by the manual. Personnel should ensure that they
thoroughly familiarize with the content of this manual in order that the system can be operated
and maintained with the minimum downtime.
Section 2
Provides Details about the Project, including contact details and Emergency Contact details.
Section 3
Provides brief description of the system related to the Manual.
Section 4
Identifies the equipment data and details about Manufacture/Supplier details used in project.
Section 5
Refers to the operating instruction for the smooth functioning of the system.
Section 6
Covers the Maintenance procedures to be followed in the project.
Section 7
Gives details about spare & replacement parts (if applicable).
Section 8 list
Details about HSE & Safe disposal instruction.
Section 9
Covers the Testing and Commissioning details.
Section 10
Refers to any modification to the system carried out during the life cycle of the item.
Section 11
Provides listings of all final installation drawings relevant to the system.
Section 12
Give details about the product warranty.
Section 13
Page 3 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
Covers details about the manufacturers literature regarding the items used in the project.
Annexure A
Approval details of the lights.
SECTION - 2
Page 4 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
SECTION - 3
Scope of Work
1) The scope of work in this project is supply and installation of Splash pad Pump ,
terminations wherever necessary, Control panels, SMDB’s ,Metering panels. lifting station
for Drainage system with testing and commissioning of entire system.
2) This O & M manual includes details of Splash pad Pump operation and its maintenance to
use the system in longer run.
There are Splash pad Pump Station fixtures installed in this project for illuminating structures,
Café’s,Pathways, Toilet Block 01&02 . The Splash pad & Control panel installed in this project
are as described below.
AQUA
2 FILTRATION PUMP WINNER50
ASTRAL
3 HEAT/COOL PUMP AHP080
ASTRAL
4 SAND MEDIA FILLTER 66239CL96
SAFETY
5 CONTROL PANEL ELECTRICAL -
AQUADROLICS
6 TUMBLER (PE4) 1109620
Page 5 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
AQUADROLICS
GROUND WATER SPRAY
7 141098557
(PE5)
AQUADROLICS
8 BLUE WHALE (PE6) 11359388
AQUADROLICS
11109819
9 WATER GUN (PE7)
AQUADROLICS
10 MINI CURVE (PE8) 1109870
AQUADROLICS
11 QUESTION MARK (PE9) 11109871
AQUADROLICS
12 MINI ARCH (PE10) 11109869
Page 6 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
SECTION - 4
ASTRAL/66239CL96 NOS
4 SAND MEDIA FILLTER 2
AQUADROLICS/110962 NOS
6 TUMBLER (PE4) 0 2
AQUADROLICS/111098 NOS
9 WATER GUN (PE7) 19 3
AQUADROLICS/110987 NOS
10 MINI CURVE (PE8) 0 2
AQUADROLICS/111098 NOS
11 QUESTION MARK (PE9) 71 2
AQUADROLICS/111098 NOS
12 MINI ARCH (PE10) 69 1
Page 7 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
The table below will give the contact details of the Manufacturer/Supplier of the items used as
a part of the system/discipline.
Page 8 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
Page 9 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
SECTION - 5
Main power from SMDB-01 located near will fed in Splash Pad control Panel from substation
through Metering Panel. All the Circulation pump are connected to the control panels.
Operation of control panels are as follows.
Hand Mode
In this mode the all Circulation pump’s connected to the control panel will be on manually.
Off Mode
In this mode the Circulation pump’s connected to the control panel will be off.
Auto Mode
In this mode the Circulation pump’s connected to the control panel will be on and off
automatically as per the settings in the timer.
The notes given are guidelines only, and do not suggest a work task sheet. This should not be
taken as exclusive or mandatory. It must be borne in mind that the system operates 24Hrs. a
day, throughout the year. A shut down of any item for repair or checks must be fully coordinated
with those responsible for the building and the users. Advice regarding this cannot be included
in this manual.
Page 10 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
Do not try to grasp any running machine or try to lift heavy components.
Do not rush to complete jobs under pressure or take risky short cuts.
The following are a few notes on the use of tools and equipment:
a) Hand tools:
i) Only use each tool for purpose of which it was designated.
ii) Never leave tools lying about. Collect them when finished and return them to correct
location.
iii) Ensure that all electrical tools are properly earthed.
Page 11 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
SECTION - 6
MAINTENANCE PROCEDURES
The Float valves in the Water storage tanks should be inspected to ensure the proper
functioning.
For the Maintenance of Circulation pump set, following instructions to be followed.
For safety reasons make sure before carrying out any maintenance activity that there
is no pressure in the water system and power supply is switched off.
The Pressure vessel must be checked every 4-6 (six) months making sure that the pre-
charge value corresponds to the factory setting or customer setting (depending on the
system working parameters); in case of need adjust the pre-charge value refilling with
compressed air or nitrogen.
Clean the vessels with water and soap only in order to grant a proper lasting of the
paint.
In case some components are worn out or corroded the vessel must be replaced.
Use only original spare parts coming from the Manufacturer.
Parts of the refrigeration system must be inspected monthly to see if the system is functioning
properly and if there are signs of water. Unit failure usually occur before the unit fails or damage,
therefore periodic inspections are the primary means of preventing most system failures. For
detailed maintenance of Cooled water system, please refer detailed maintenance procedure
mentioned under section Manufacturer literature.
Page 12 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
SECTION - 7
SPARE & REPLACEMENT PARTS
There are no spare parts listing for items installed. In the event that any replacement of any items
which may be required in the future you should, in the first instance, contact the installation
Contractor (given in the manual) or call the services of a manufacturer/Local Dealer
Page 13 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
SECTION - 8
Before starting any (maintenance) work on the system, make sure that the necessary health and
safety requirements are in place. Materials used in any activities should be disposed-off
according to the local authority guideline only. Materials used does not require any specific
disposal instructions which does not have any hazardous materials.
Disposal instructions:
Materials used in maintenance activities and any repaired or replaced items may require
classification as to the type of waste material that they constitute. The Facilities Maintenance
Team is directed to the series of Technical Guidelines (and relevant bulletins) available from the
Dubai Municipality Environment Protection & Safety Section, which cover Hazardous Waste.
The installed items described within this manual which require no special considerations with
regard to their disposal and can be disposed of as general builder’s waste unless contaminated
with a known hazardous material. In the event of such contamination, local procedures must be
followed during disposal.
Any items or materials left over from maintenance\repair work should be stored and used as
spares, where necessary, as this will reduce the cost of future maintenance activities.
Page 14 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
Known Hazards:
In processing the disposal of any material related to the items as mentioned in the O&M Manual,
Facilities Maintenance personnel must recognize and understand the inherent hazards of sharp
edges, weight and dust particles when handling those items covered by this manual.
Working with the chlorine and pH dosing system. Proper Mask should be used while dealing
with dosing system, as this can cause problems if inhaled. In the event of inhalation, wash with
clean water, and move to an area where we have sufficient air circulation. Contact medical team
for further assistance.
Safe Disposal:
Debris and waste should be swept up or vacuumed and placed in strong polythene bags (such as
the bags used to package the mineral board). If the waste is non-hazardous, dispose of at an
approved waste site suitable for building waste, while observing local regulations.
All wastewater from high pressure stripping operations should be collected and disposed of
through an appropriate disposal agency.
Never dispose of solvent products into watercourses such as drains, sewers, channels or gullies.
Page 15 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
SECTION - 9
Page 16 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
SECTION - 10
MODIFICATIONS
There are no modifications to the system.
The Facilities Management Team should use this Section of the manual to enter details of any
modifications undertaken during the life of system installed.
O&M
Date of Modification
Completed by Authorized by Section
Modification Details
Amended
Page 17 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
SECTION - 11
Page 18 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
SECTION - 12
SL. MATERIAL
MAKE/MODEL WARRANTY PERIOD
NO DESCRIPTION
Page 19 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
Page 20 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
SECTION - 13
Page 21 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
Page 22 of 23
OPERATION & MAINTENANCE MANUAL FOR POTABLE WATER PUMP STATION
CATALOGUES
Page 23 of 23
Tumbler
duplo |
Coloured
1110 9620
4m3/h
1-1,6 bar
Not relevant
500mm
755 mm
Coloured 1690 mm
1110 9620
3295 mm
3295 mm
755 mm 1690 mm
9m3/h
1-1,6 bar
Not relevant
300 mm
3400 mm
6900 mm
2850 mm
2850 mm
3400 mm 6900 mm
1,5m3/h
0,6-1 bar
Not relevant
350mm
400 mm
1110 9819
850 mm
1290 mm
1290 mm
400 mm 850 mm
1,5m3/h
1-1,6 bar
Not relevant
300mm
350 mm
Coloured
1110 9870
395 mm
940 mm
940 mm
350 mm 395 mm
2m3/h
1-1,6 bar
Not relevant
500mm
400 mm
Coloured 950 mm
1110 9871
2470 mm
2470 mm
400 mm 950 mm
2,5m3/h
1-1,6 bar
Not relevant
500mm
400 mm
Coloured
460 mm
1110 9869
1990 mm
1990 mm
400 mm 460 mm
02
Technical features
A reliable and highly efficient self-priming centrifugal pump with built-in large
capacity pre-filter. The ‘Winner’ is extremely quiet to run and developed for
water circulation and filtration in residential swimming pools.
• Transparent polycarbonate lid for easy inspection of the pre-filter basket
• Includes a standard key for effortlessly opening of the pre-filter lid and
fittings for the gluing.
Models
CONNECTION INTENSITY A LENGTH (L) WEIGHT VOLUME
CODE PACKING
(DNA - DNI)
II 230 III 230 III 400 mm kg m3
WINNER-50M 2”- Ø63 4.4 - - 550 1 12.5 0.052
54 AQUA MIDDLE EAST / POOL, SPA, FOUNTAIN EQUIPMENT & ACCESSORIES CATALOGUE 2023
PUMPS & COUNTER CURRENT
02
6@12.5m3/hr.
27
24
21
18
15
12
9
6
3
0 4 8 12 16 20 24 28 32 36 40
HYDRAULIC FEATURES:
HEIGHT
SINGLE PHASE THREE PHASE
4 6 8 10 12 14 16 18 20
MODELS MODELS
(m)
ELECTRIC FEATURES:
SINGLE PHASE MODELS THREE PHASE MODELS INPUT POWER P1 kW MOTOR POWER P2 NOISE LEVEL
AQUA-ME.AE 55
NSCE 32-160/55/P25VCS4
Company name
Contact
Technical data Phone number
e-mail address
Operating data
1 Pumpe type Single head pump Fluid Water , pure
2 No. of pumps 1 Operating temperature t A °C 4
3 Nominal flow m³/h 32 Max / Min Operating Temperature mech. Seal °C 120 / -25
4 Nominal head m 33 pH-value at t A 7
5 Static head m 0 Density at t A kg/m³ 1000
6 Inlet pressure bar 0 Kin. viscosity at t A mm²/s 1.569
7 Environmental temperature °C 20 Vapor pressure at t A bar 1
8 Available system NPSH m 0 Altitude 0
Pump data
9 Lubrication Standard , Grease lubrication [Std ]
10 Execution 2 poles motor Max. mm 171
11 Design Horizontal Impeller Ø designed mm 171
12 Operating speed 2880 rpm Stages 1 Min. mm 137
13 Suction nozzle DN 50 / PN 16 / EN1092-2 Nominal m³/h 32
14 Discharge nozzle DN 32 / PN 16 / EN1092-2 Flow Max- m³/h 39.7
15 Max. casing pressure bar Min- m³/h 9.9
16 Max. working pressure bar 3.9 Nominal m 33.1
17 Impeller type Radial impeller Head at Qmax m 25.3
18 Head H(Q=0) m 40 at Qmin m 40.4
19 Max. shaft power kW 4.6 Shaft power kW 4.3
20 Pump weight kg Efficiency % 67.2
21 Total weight kg 50.0 NPSH 3% m 1.2
Materials
22 Pump Shaft Seal
23 Volute Casing Cast Iron Single mechanical seal , without shaft sleeve
24 Casing Cov er Cast Iron eMG12 - Ø22mm BQ7EGG-WA
25 Impeller Fabricated Stainless Steel Mechanical seal diameter 22 mm
26 Shaft Stainless steel 1. Rotating ring Carbon graphite resin impregnated
27 Wear ring Stainless steel 2. Stationary ring SiC , silicon carbide, sintered press.less
28 Impeller lock nut and washer Stainless steel 3. Secondary seal Ethylene propylene rubber (EPDM)
29 Impeller key Stainless steel 4. Springs CrNiMo - Steel
30 Fill and drain plugs Stainless steel 5. Others EPDM - WRAS
31 Gaskets of the pump Ethylene propylene rubber (EPDM)
32
33
34
35
36
37
38
39
40
41
Motor data Electrical and dimensional data refer to IE3 motor
42 Manufacturer Lowara
43 Specific design IE3 3ph Flange Motor
44 Type PLM 112 B14 5, 5 kW
45 Rated power 5.5 kW Rated current 10.4 A
46 Nominal speed 2880 rpm Rated voltage 400 V
47 Frame size 112 Service factor 1
48 Weight kg 55.8 Degree of protection IP55
Remarks
49
50
50
52
Power datas refered to : hydr. Performance acceptance acc. To EN ISO 9906 Class G rade 3B
Water, pure [100%] ; 4°C; 1000kg/m³; 1.57mm²/s
MEI : N.A. - according to Ecodesign Directive 2009/125/EC and Regulation (EU ) No.547/2012
[m] Head
40
38
36
Eff.
34 67.5%
33.1 m
32 1
30
28
26
32-160/55
24
22
20
18
16
14
12
10
8
6
4
2
[kW]0
Shaft power P2 32-160/55 (P2)
4.5
4.0 4.3 kW
3.5
3.0
2.5
2.0
1.5
1.0
0.5
[%] Efficiency 67.2 %
60 32-160/55
50
40
30
20
10
0
[m] NPSH-values 32-160/55
4.5
4.0
3.5
3.0
2.5
2.0
1.5
1.0 1.16 m
0.5 32 m³/h
0.0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 [m³/h]
a 80
AD 168
B max 248
b 50
DND 32
DNS 50
g1 14
H max 292
h1 132
h2 160
L 533
m1 100
m2 70
n1 240
n2 190
s1 14
Ty pe A
W 285
x 86
Weight
Total weight 50 kg
Connections
Suction nozzle Discharge nozzle
DN 50 DN 32
PN 16 PN 16
EN1092-2 EN1092-2
L C 20 C 18
DN
d1
D
K
D 165 D 140
df 99 df 76
DN 50 DN 32
K 125 K 100
L 4 x 19 L 4 x 19
Dimensions and w eight w ithout obligation Value C, D may vary from Standard
Cone diffuser Fitted with 1” collector arms Transparent top lid with V-clamp system
Cono difusor Equipado con brazos colectores 1” Tapa superior transparente con cierre zuncho
TECHNICAL DATA
Connections
Filtering Maximum Sand
Model (mm/inch) Flow Net Weight
Code velocity pressure (0.4-0.8mm) D (mm) H (mm) M (mm) N (mm)
(mm) (m³/h) (kg)
mm inch (m³/h/m²) (bar) (kg)
66238CL96 400 50 1 ½" 50 6.5 2.5 60 9.9 415 710 280 125
66239CL96 500 50 1 ½" 50 9.5 2.5 100 14.8 515 755 295 125
66240CL96 600 50 1 ½” 50 15 2.5 160 19.9 620 830 325 125
71134CL96 660 50 1 ½” 50 17 2.5 210 27 674 934 380 125 NEW!!
66241CL96 750 63 2” 50 21 2.5 290 33.1 780 940 325 230
66242CL96 900 63 2” 50 32 2.5 500 51.4 930 1060 400 230
66829CL96 1050 63 2” 50 43 2.5 550 250 65 1070 1250 470
66829CL96-3 1050 90 3” 50 43 2.5 550 250 65 1070 1250 470
66831CL96 1200 75 2 ½" 50 56 2.5 750 300 90 1220 1340 545
PACKAGING
Code Units per pallet Box dimension (cm)
66238CL96 15 44x44x71
66239CL96 10 54x54x75
66240CL96 8 63x63x86
71134CL96 8 69x69x89
66241CL96 2 78x78x106
66242CL96 2 95x95x112
66829CL96 1 124x124x140
66831CL96 1 140x140x155
WATER TREATMENT UV Sterilizers
of
light tube is equipped with a quartz sleeve, to ensure optimal working temperature. The electrical configuration of the Excellence
devise is suitable to most electrical specifications. Special exterior design makes the devise convenient to use. All rounded
sterilization , highly efficient, sterillization rate up to 99.9%. High output , physical sterilization , no side effects,
No secondary pollution. The amount of water that can be sterilized ranges from 5.5-250T/H. The devise
adapts to swimming pools, Spa and water parks of various sizes.
167
www.proteam-me.com
TECHNICAL DATA SHEET FOR 50 HZ UNITS
4
AHP 030/050 – R4
6
DOSING EQUIPMENT
3.5 kg Dossi-3
Chlorine and bromine feeder
DESCRIPTION
Chlorine and bromine feeder. Manufactured from unalterable plastic materials (ABS). Approximate capacity:
3.5 kg of tablets. Lid closing with double safety system. Easy to operate regulation valves. For pools up to
60 m3 with Chlorine and up to 30 m3 with bromine. Height: 405 mm.
Dossi-3 in-line
For direct connection to pipework
with 11/2” connectors 24429 1 1.81 0.03
Dossi-3 off-line
For by-pass connection
with flexible tube 24430 1 1.90 0.031
EQUIPMENT
TREATMENT
WATER
TO FILTER
314
( م. م. ز. ا ات ) ش ال
Polychem Resins International Industries LLC
P. O. Box 37029 Dubai, United Arab Emirates Tel: +971-4-8801662 Fax: +971-4-8801866
sales@polychem.biz www.polychem.biz
Page 1 of 2
Properties of Cured, Un-reinforced, non thixo Resin PolyPol-1003
Casting Preparation
150 ppm HQ
Accelerator
0.25% Cobalt Octoate(6%)
Catalyst
1.5 % MEKP (Butanox M-50)
Disclaimer :
The information contained in this brochure is correct and accurate and is based on our technical and scientific knowledge at the date of going
to press. Such information relates only to use of the products in the pure state and for the purposes stated herein. Nothing stated here may be
taken or construed as implying a breach of any existing patents or violate any law, safety code or insurance regulation. Nor is any warranty,
whether expressed or implicit, given with regard to the results to be obtained through the use of the aforesaid information. In the view of actual
conditions of usage, storage and handling are being totally beyond our control, customer should evaluate the data and product and make their
own tests to determine the suitability of our product for their respective use in full scale production for his own purpose and under his
operating conditions. All our products are sold without warranty expressed or implied and no liability or claim or subrogation rights against
Polychem Resins International Industries LLC can be accepted in respect of information and use of products directly or indirectly.
Revision No.5 Date of revision : January,2013
Page 2 of 2
( م. م. ز. ا ات ) ش ال
Polychem Resins International Industries LLC
P. O. Box 37029 Dubai, United Arab Emirates Tel: +971-4-8801662 Fax: +971-4-8801866
sales@polychem.biz www.polychem.biz
2. Composition/Information on Ingredients
Preparation : Esterification reaction of diacids and diols, Unsaturated polyester
resin
Components CAS-No. Labeling Concentration
3. Hazard Identification
(a) Flammable (b) Harmful if inhaled(c) Irritating to eyes and skin (d) The mixture of
product vapour and air could be explosive. (e) Keep away from source of ignition.
Other
Instructions/regulations : The product is a preparation . The components are listed
in TSCA and EINECS
The information contained herein is believed to be correct and corresponds to the latest state of
scientific and technical knowledge . However, no warranty is made, either express or implied ,
regarding its accuracy or the results to be obtained from the use of such information.