Timising DimensionSquaring

Timising Dimension Squaring Description

A. SUBSTRUCTURE
1.0 EARTH WORK 16 1
2.76 44.16
1.1 SITE CLEARANCE
Clearing top soil to the minimum of 20 cm depth to remove 2 1.2
dust, and some bushs from the site and preparing the site 2.76 6.624
1 32.02 for other excavation take working space 1m in each side.
22 704.44 9 0.8
704.44 m2 total area of site to be cleare 2.76 19.872
1 21 70.656
4 1.2 BULK EXCAVATION
0.4 33.6 Excavate the ground to get reduced level from + 0.00 to 0.4m
1 15.3 by using working space 0.5m each side 8 1
16.65 2.75 22
0.4 101.90
1 3.92 2 1.2
0.98 2.75 6.6
0.4 1.54
137.03 m3 total volume of bulk excavation 8 0.8
1.3 PIT EXCAVATION 2.75 17.6
Excavation of isolated footing to the depth of 2.1 with working 46.2
2 1.7 0.25m at each side depth=2.1-0.4(bulk excavation)=1.7m 116.856
1.3 1.3.1 pit excavation for footing F1
1.3 5.746 m3 total volume of F1
1.3.2 pit excavation for footing F2
8 1.7 Excavation of isolated footing to the depth of 1.7m with working
1.9 0.25m at each side 2 119.55
1.9 49.096 m3 total volume of F 2 0.4 95.64
1.3.3 pit excavation for footing F3 1 105.9
8 1.7 Excavation of isolated footing to the depth of 1.7m with working 0.2 21.18
2.15 0.25m at each side 1 13.65
2.15 62.866 m3 total volume of F 3 0.15 2.05
1.3.4 pit excavation for footing CHEMNY 23.23
1 1.7 Excavation of isolated footing to the depth of 1.7m with working
2.1 0.25m at each side
1.6 5.712 m3 total volume of F CHEMNY
Total pit ex. 123.42 m3 Total volume of pit excavation 2 127.39
0.25 63.695
1 127.39
1.4 TRENCH EXCAVATION 0.2 25.478
excavating the trench for foundation wall with the depth of 1.2m +
0.05 lean concrete depth = 1.25m and then deduct the depth of
1 8.4 bulk that already we excavate i.e 1.25 -0.4= 0.85m 1 2.6
1 Trech for X04,Y01-04 1.3 3.38
0.85 7.14 M3 2 2.84
1 10.1 Trech for X03,Y01-04 1.3 7.384
1 4 2.84
0.85 8.585 m3 0.17 1.93
1 10.05 Trech for X02,Y01-04 18 1.3
1 0.15 3.51
0.85 8.5425 m3 1 4.45
1 7.65 Trech for X01,Y01-04 0.2 0.89
1 2 4.45
0.85 6.5025 m3 0.3 2.67
1 1.3 Trech for X01,Y01-04 19.77
1
0.85 1.105 m3
2 8.325 Trech for y01andY04,X01-04 1 199.64 199.64
1 2 3.3
0.85 14.1525 m3 0.15 0.99
2 8.3 Trech for y02andY03,X01-04 200.63
1 545.29
0.85 14.11 m3
2 14.3 Trech for X05andX06,X05-08
1
0.85
4 2.6 24.31 Trech for y05-Y08,X05 and 06
1
0.85 8.84
93.2875 M3 Total trech Ex.

2 2.1 1.5 BACKFILL


0.5 1.5.1 Back fill around footing
0.15 0.315 m3 total volume of footing pad for F1
8 3.3
0.5
0.35 4.62 m3 total volume of footing pad for F2
8 3.8
0.5
0.3 4.56 m3 total volume of footing pad for F3
1 3.2
0.5
0.15 0.24 m3 total volume of footing pad for F CHEMNY
9.735 m3 total volume of footing pad
1.5.2 Volume of foundation column
2 1.1 Actual volume of foundation column with the size of 0.4m*0.2m and
0.9 depth=2.1-1.25(depth of masnory wall)-0.15/pad depth=0.7 For C1
0.7 1.386 m3 volume of foundation columns F1
6 1.7 Actual volume of foundation column with the size of 0.3m*0.2m and
1.6 depth=2.1-1.25(depth of masnory wall)-0.35/pad depth=0.5m
0.5 8.16 m3 for C1
2 1.7 Actual volume of foundation column with the size of 0.2m*0.2m and
1.7 depth=2.1-1.25(depth of masnory wall)-0.35/pad depth=0.5m
0.5 2.89 m3 For C4
11.05 m3 volume of foundation columns F2
6 1.95 Actual volume of foundation column with the size of 0.2m*0.2m and
1.95 depth=2.1-1.25(depth of masnory wall)-0.3/pad depth=0.55m
0.55 12.55 m3 for C4
2 1.95 Actual volume of foundation column with the size of 0.3m*0.2m and
1.85 depth=2.1-1.25(depth of masnory wall)-0.3/pad depth=0.55m
0.55 3.97 m3 For C2
16.52 m3 volume of foundation columns F3
1 1.9 Actual volume of foundation column with the size of 0.2m*0.2m and
1.4 depth=2.1-1.25(depth of masnory wall)-0.15/pad depth=0.7m
0.7 1.86 m3 volume of foundation columns F CHEMNY
30.81 m3 Total volume of foundation columns

1 121.07 1.5.3 Back fill around trench


0.5
1.25 75.67 m3 Total trench voiume
116.22 m3 Total back fill

1.6 CARTAWAY
cartaway= SC+Bex+Tex+Pex-BF
but first change the site clearing area into volume by
taking an average depth of 20cm 140.89 m3

494.63 m3 total volume of excavation


116.217 m3 total volume of back fill
378.41 m3 total volume of cartaway

TIMESINGDIMENSION SQUARING DISCRIPTION


2.0 CONCRETE WORK
2.1 LEAN CONCRETC-5 150 K cement/m3
2 0.8 a. for isolated footing one (1)
0.8 1.28 m2 total area of lean concrete for footing 1
8 1.4 b. for isolated footing two (2)
1.4 15.68 m2 total area of lean concrete for footing 2
8 1.65 c. for isolated footing three (3)
1.65 21.78 m2 total area of lean concrete for footing 3
1 1.6 d. for isolated footing chemny
1.1 1.76 m2 total area of lean concrete for footing chemny
1 121.07 e. under masonry or foundation wall
0.5 60.534 m2 total area of lean concrete under masonry
1 181.99 f. Under grade beam
0.2 36.398 m2 total area of lean concrete for grade
137.43 m2 total area of lean concrete

2.2 REINFORCED CONCRETE C-25 with 360kg cement/m3


2 0.8 2.2.1 for footing pad
0.8 a. for footing 1
0.15 0.192 m3 Total volume of concrete for footing pad 1
8 1.4
1.4 b. for footing 2
0.35 5.488 m3 Total volume of concrete for footing pad 2
8 1.65
1.65 c. for footing 3
0.3 6.534 m3 Total volume of concrete for footing pad 3
1 1.6
1.1 d. for footing chemny
0.15 0.264 m3 Total volume of concrete for footing chemny
12.478 m3 Total volume of concrete for footing pad

2 0.4 2.2.2 for foundation column


0.2 a. for foundation column 1
1.95 0.312 m3 Total volume of concrete for footing 1
6 0.3
0.2 b. for foundation column 2
1.75 0.63
2 0.2
0.2
1.75 0.14
0.77 m3 Total volume of concrete for footing 2
6 0.2
0.2 c. for foundation column 3
1.8 0.432
2 0.3
0.2
1.8 0.216
0.648 m3 Total volume of concrete for footing 3
1 0.2
0.2 d. for foundation column Chemny
1.95 0.078 m3 Total volume of concrete for footing chemny
1.808 m3 Total volume of concrete of foundation column

3 14.3 2.2.3 concrete for grade beam


0.4 FOR GB-1
0.2 3.432 m3 Total volume of concrete for grade beam
1 56.53
0.4 FOR GB-2,2',3,4,5 and GB-5'
0.2 4.5224 m3 Total volume of concrete for grade beam
2 35.28
0.4 FOR GB-6 and GB-6"
0.2 5.6448 m3 Total volume of concrete for grade beam
2 9.1
0.35 FOR GB-6' and GB-6"
0.2 1.274 m3 Total volume of concrete for grade beam
4 3
0.35 FOR GB-7
0.2 0.84 m3 Total volume of concrete for grade beam
15.71 m3 Total volume of concrete for grade beam

2.2.4 concrete for ground floor slab


thickness of rc slab for ground = 100mm or 10cm which is < 15cm
1 221.187 therefore it is computed by m3 (volume)= 22.11872 m3
221.187 m2 total volume for concrete for floor slab
43.276 m3 Total volume of concrete for substructure

1 180.39 3.0 masonry work


0.5 3.1 stone masonry for foundation wall
1.2 108.234 m3 Total volume of masonry
3.2 Hard core
1 221.187 Hard core for ground floor slab = ɛ of area of each room = 221.187m2
0.2 44.2374 m3 total area of hard core

4.0 FORM WORK


4.1 formwork for footing pad
a. for footing pad 1
form work for pad which is timber formwork
2 3.2 L= 0.8*2 + 0.8*2 =3.2
0.15 0.96 m2
b. for footing pad 2
form work for pad which is timber formwork
8 5.6 L= 1.4*2 + 1.4*2 =5.6
0.35 15.68 m2 area of formwork with 0.025 thickness of formwork
c. for footing pad 3
8 6.6 form work for pad which is timber formwork
0.3 L= 1.65*2 + 1.65*2 =6.6
15.84 m2
d. for footing pad chemny
1 5.4 form work for pad which is timber formwork
0.15 L= 1.6*2 + 1.1*2 =5.4
0.81 m2 area of formwork with 0.025 thickness of formwork

4.2 formwork for footing column


2 1.2 a. for footing column 1
1.95 L= (0.3 *2)+ (0.2*2)=1.2m
4.68 m2 area of formwork for Fc1
6 1 b. for footing column 2
1.75 L= (0.3 *2)+ (0.2*2)=1m
10.5 m2 area of formwork for Fc2
2 0.8 b. for footing column 2
1.75 L= (0.2 *2)+ (0.2*2)=0.8m
2.8 m2 area of formwork for Fc3
6 0.8 c. for footing column 3
1.8 L= (0.2 *2)+ (0.2*2)=0.8m
8.64 m2 area of formwork for Fc3
2 1 c. for footing column 3
1.8 L= (0.3 *2)+ (0.2*2)=1m
3.6 m2 area of formwork for Fc 3
1 0.8 d. for footing column chemny
1.95 L= (0.2 *2)+ (0.2*2)=0.8m
1.56 m2 area of formwork for Fc chemny

1 169.99 4.3 Formwork for grade beam


0.4 68.00 for external face of beam
1 10.4
0.35 3.64
71.64 m2
1 128.98 for internal face of the beam
0.4 51.59
1 10.4
0.35 3.64
55.23 m2
189.14 m2 Total area of form work for substructure

B.SUPER STRUCTURE
1.0 CONCRETE WORK
1.1 conrete for elevation column
1.1.1Reinforced column concrete with quality C-25 360 Kg of cement/m3
6 0.3 For elevation column for ground floor
0.2 b/n +0.00 and +2.76 exculding floor beam
2.76 A.for Column 1
0.9936 m3 total volume of conrete for column 1
2 0.3
0.2 B.for Column 2
2.76 0.3312 m3 total volume of conrete for column 2
2 0.4
0.2 C.for Column 3
2.76 0.4416 m3 total volume of conrete for column 3
8 0.2
0.2 D.for Column 4
2.76 0.8832 m3 total volume of conrete for column 4
9 0.2
0.2 E.for Column 5
2.4 0.864 m3 total volume of conrete for column 5
3.514 m3 total volume of C-25 concrete for column of ground floor
1.1.2 Reinforced column concrete with quality C-25 360 Kg of cement/m3
For elevation column for 1st floor
b/n +3.06 and +6.06 exculding floor beam i.e 6.06-3.06- 0.25 = 2.75m
6 0.3 0.25 is top tie beam depth
0.2 A. concrete for column 1
2.75 0.99 m3 Total volume of concrete for 1st floor column 1
2 0.3
0.25 B. concrete for column 2
2.75 0.4125 m3 Total volume of concrete for 1st floor column 2
2 0.4
0.2 C. concrete for column 3
2.75 0.44 m3 Total volume of concrete for 1st floor column 3
8 0.2
0.2 D. concrete for column 4
2.75 0.88 m3 Total volume of concrete for 1st floor column 4
2.723 m3 total volume of C-25 concrete for column of 1st floor

1.2 concrete work for 1st floor beam


1.2.1 Reinforced beam concrete with quality C-25 360 Kg of cement/m3
to 1st floor beam or intermediate beam at +3.06
L=5.7+6 and then add 0.2 that is from the centre to out side at both side
4 11.9 A. concrete for first floor beam FB1/SMB
0.2 from axis y1-y4 to x4
0.4 3.808 m3 Total volume concrete of 1st floor beam fb1
4 2.4 L=2.4m
0.15
0.4 0.576 m3 Total volume concrete of 1st floor beam fb1
1 4.05 L=4.05m
0.4
0.15 0.243 m3 Total volume concrete of 1st floor beam fb2
1 7.4 L=0.15+6+1.25=7.40m
0.4
0.2 9 m3 Total volume concrete of 1st floor beam fb3
1 5.7 L=4+1.55+0.15=5.7m
0.4
0.2 0.456 M3 Total volume concrete of 1st floor beam fb4
3 11.4 L=1.25+6+4+0.15=11.4m
0.4
0.2 2.736 M3 Total volume concrete of 1st floor beam fb5
1 5.5
0.4
0.2 0.44 M3 Total volume concrete of 1st floor beam fb6
1 5.8
0.4
0.2 0.464 M3 Total volume concrete of 1st floor beam fb7
17.723 m3 total volume of C-25 concrete for1st floor beam

1.2 concrete work for to top tie beam


1.2.1 Reinforced beam concrete with quality C-25 360 Kg of cement/m3
to top tie beam at +6.06
1 5.9 A. Concrete for TB1
0.25
0.2 0.295 m3 Total volume concrete for TB1
1 2.6 B. Concrete for TB2
0.25
0.2 0.13 m3 Total volume concrete for TB2
1 6.2 C. Concrete for TB3
0.25
0.2 0.31 m3 Total volume concrete for TB3
2 14.6 D. Concrete for TB4
0.25
0.2 1.46 m3 Total volume concrete for TB4
1 14.3 E. Concrete for TB5
0.25
0.2 0.715 m3 Total volume concrete for TB5
1 2.7 F. Concrete for TB6
0.25
0.2 0.135 m3 Total volume concrete for TB6
2 16.98 G. Concrete for TB7
0.25
0.2 1.698 m3 Total volume concrete for TB7
1 7.45 H. Concrete for TB8
0.25
0.2 0.3725 m3 Total volume concrete for TB8
1 4.425 I. Concrete for TB9
0.25
0.2 0.22125 m3 Total volume concrete for TB9
1 4.275 J. Concrete for TB10
0.25
0.2 0.21375 m3 Total volume concrete for TB10
1 16.98 K. Concrete for TB5'
0.25
0.2 0.849 m3 Total volume concrete for TB5'
6.40 m3 Total volume of concrete for top tie beam
1.3 concrete work for to top SLAB
1.2.1 Reinforced Slab concrete with quality C-25 360 Kg of cement/m3
1 199.64
0.15 29.946 m3 Total slab concrete

1.4 CONRETE FOR STAIR CASE


1 2.6 1.4.1 C-25 concrete for landing stair case
1.3 For landing at +3.06
0.17 0.57 m3
1.4.2 C-25 concrete for steps stair case
For riser and traeds
18 1.3 from +0.00 to +3.06
0.3 V= 0.5*B*L*H 0.3
0.17 0.597 m3 1.3 0.17

2 2.86 1.4.3 C-25 concrete for steps stair case


1.3 For Waist slab
0.17 1.264 m3
1 4.45 1.4.4 C-25 concrete for steps stair case
0.2 For stair beam
0.3 0.267 m3
2.702 m3 total volume of concrete for stair case
63.007 m3 total volume of concrete
Description
2.0 form work for super structure ground floor
2.1for elevation column c1 ,2&5
Timber formwork for elevation column from +0.00 - +2.76
L=( 0.3*2) + (0.2*2) = 0.6+ 0.4 = 1m
m2 For C1,2 and C5
2.2 for elevation column c3
L=( 0.4*2) + (0.2*2) = 0.8+ 0.4 = 1.1m
m2 For C3
2.3 for elevation column c4
L=( 0.2*2) + (0.2*2) = 0.4+ 0.4 = 0.8m
m2 For C4
m2 Total area of ground floor Column
2.4for elevation column c1 &2
Timber formwork for elevation column from +3.06 - +5.81=2.75
L=( 0.3*2) + (0.2*2) = 0.6+ 0.4 = 1m
m2 For C1and C2
2.5 for elevation column c3
L=( 0.4*2) + (0.2*2) = 0.8+ 0.4 = 1.1m
m2 For C3
2.6 for elevation column c4
L=( 0.2*2) + (0.2*2) = 0.4+ 0.4 = 0.8m
m2 For C4
m2 Total area of first floor Column
m2 total area of form work for elevation column
2.2 for 1st floor beam
A. for side form work
total length of =119.55 and 0.4 depth

m2 total area of side formwork for 1st floor beam


B. for soffit form work
m2

m2
m2 total area of soffit formwork for 1st floor beam

2.3 Top tie beam formwork


A. Side formwork for TB

m2 Total area of side formwork for TB1


B. Soffit formwork for TB
m2 Total area of soffit formwork for TB1

2.4 formwork for stair case


A. for landing soffit formwork
m2
B. for waist soffit formwork
m2
C. for waist side formwork
m2
D for side formwork
m2
E. for stair beam soffit formwork
m2
F for stair beam side formwork
m2
m2 Total stair formwork

2.5 formwork for Slab


m2 a, Soffit formwork
b, prove formwork
m2
m2 Total slab formwork
m2 total super structure formwork area