A. SUBSTRUCTURE
1.0 EARTH WORK 16 1
2.76 44.16
1.1 SITE CLEARANCE
Clearing top soil to the minimum of 20 cm depth to remove 2 1.2
dust, and some bushs from the site and preparing the site 2.76 6.624
1 32.02 for other excavation take working space 1m in each side.
22 704.44 9 0.8
704.44 m2 total area of site to be cleare 2.76 19.872
1 21 70.656
4 1.2 BULK EXCAVATION
0.4 33.6 Excavate the ground to get reduced level from + 0.00 to 0.4m
1 15.3 by using working space 0.5m each side 8 1
16.65 2.75 22
0.4 101.90
1 3.92 2 1.2
0.98 2.75 6.6
0.4 1.54
137.03 m3 total volume of bulk excavation 8 0.8
1.3 PIT EXCAVATION 2.75 17.6
Excavation of isolated footing to the depth of 2.1 with working 46.2
2 1.7 0.25m at each side depth=2.1-0.4(bulk excavation)=1.7m 116.856
1.3 1.3.1 pit excavation for footing F1
1.3 5.746 m3 total volume of F1
1.3.2 pit excavation for footing F2
8 1.7 Excavation of isolated footing to the depth of 1.7m with working
1.9 0.25m at each side 2 119.55
1.9 49.096 m3 total volume of F 2 0.4 95.64
1.3.3 pit excavation for footing F3 1 105.9
8 1.7 Excavation of isolated footing to the depth of 1.7m with working 0.2 21.18
2.15 0.25m at each side 1 13.65
2.15 62.866 m3 total volume of F 3 0.15 2.05
1.3.4 pit excavation for footing CHEMNY 23.23
1 1.7 Excavation of isolated footing to the depth of 1.7m with working
2.1 0.25m at each side
1.6 5.712 m3 total volume of F CHEMNY
Total pit ex. 123.42 m3 Total volume of pit excavation 2 127.39
0.25 63.695
1 127.39
1.4 TRENCH EXCAVATION 0.2 25.478
excavating the trench for foundation wall with the depth of 1.2m +
0.05 lean concrete depth = 1.25m and then deduct the depth of
1 8.4 bulk that already we excavate i.e 1.25 -0.4= 0.85m 1 2.6
1 Trech for X04,Y01-04 1.3 3.38
0.85 7.14 M3 2 2.84
1 10.1 Trech for X03,Y01-04 1.3 7.384
1 4 2.84
0.85 8.585 m3 0.17 1.93
1 10.05 Trech for X02,Y01-04 18 1.3
1 0.15 3.51
0.85 8.5425 m3 1 4.45
1 7.65 Trech for X01,Y01-04 0.2 0.89
1 2 4.45
0.85 6.5025 m3 0.3 2.67
1 1.3 Trech for X01,Y01-04 19.77
1
0.85 1.105 m3
2 8.325 Trech for y01andY04,X01-04 1 199.64 199.64
1 2 3.3
0.85 14.1525 m3 0.15 0.99
2 8.3 Trech for y02andY03,X01-04 200.63
1 545.29
0.85 14.11 m3
2 14.3 Trech for X05andX06,X05-08
1
0.85
4 2.6 24.31 Trech for y05-Y08,X05 and 06
1
0.85 8.84
93.2875 M3 Total trech Ex.
1.6 CARTAWAY
cartaway= SC+Bex+Tex+Pex-BF
but first change the site clearing area into volume by
taking an average depth of 20cm 140.89 m3
B.SUPER STRUCTURE
1.0 CONCRETE WORK
1.1 conrete for elevation column
1.1.1Reinforced column concrete with quality C-25 360 Kg of cement/m3
6 0.3 For elevation column for ground floor
0.2 b/n +0.00 and +2.76 exculding floor beam
2.76 A.for Column 1
0.9936 m3 total volume of conrete for column 1
2 0.3
0.2 B.for Column 2
2.76 0.3312 m3 total volume of conrete for column 2
2 0.4
0.2 C.for Column 3
2.76 0.4416 m3 total volume of conrete for column 3
8 0.2
0.2 D.for Column 4
2.76 0.8832 m3 total volume of conrete for column 4
9 0.2
0.2 E.for Column 5
2.4 0.864 m3 total volume of conrete for column 5
3.514 m3 total volume of C-25 concrete for column of ground floor
1.1.2 Reinforced column concrete with quality C-25 360 Kg of cement/m3
For elevation column for 1st floor
b/n +3.06 and +6.06 exculding floor beam i.e 6.06-3.06- 0.25 = 2.75m
6 0.3 0.25 is top tie beam depth
0.2 A. concrete for column 1
2.75 0.99 m3 Total volume of concrete for 1st floor column 1
2 0.3
0.25 B. concrete for column 2
2.75 0.4125 m3 Total volume of concrete for 1st floor column 2
2 0.4
0.2 C. concrete for column 3
2.75 0.44 m3 Total volume of concrete for 1st floor column 3
8 0.2
0.2 D. concrete for column 4
2.75 0.88 m3 Total volume of concrete for 1st floor column 4
2.723 m3 total volume of C-25 concrete for column of 1st floor
m2
m2 total area of soffit formwork for 1st floor beam