Design Analysis
Design Analysis
2
LIST OF FIGURES, PHOTO AND TABLES
FIGURES
TABLES
3
EXECUTIVE SUMMARY
4
1. PROJECT DESCRIPTION
2. DESIGN ANALYSIS
According to clause 1.3.2.1 (F) of the PEC 1 2017 edition, the
design analysis shows the following:
5
2.2 System Voltage Ratings
6
3. SINGLE LINE DIAGRAM
7
4. VOLTAGE DROP CALCULATION
2 x IFL x L x (RcosØ+XsinØ)
VD1∅=
1000 x N
Where:
VD : Voltage Drop in (V)
8
For simplification of the calculation, selected cables were chosen to
evaluate as mention below:
❖ TR to MCC-1
❖ MCC-1 to MDP
❖ MDP to LP4
❖ LP4 to Water Pump
9
4.1 Feeder Voltage Drop Schedule
10
11
5. Transformer Loading
5.1 Analysis
5.2 Recommendation
12
6. SHORT CIRCUIT ANALYSIS
13
6.2 SHORT CIRCUIT IMPEDANCE DIAGRAM
14
6.3 Feeder Cable per Unit Impedance Schedule
15
6.4 Motor per unit Impedance Schedule
16
6.5 Fault Calculation Summary
17
7. PROTECTION AND COORDINATION
18
7.1 CB4 Setting Values for Jockey Pump (JP)
It shows that the selected circuit breaker and its setting are
coordinated with the motor during start-up.
It shows that the two circuit breakers and its setting are
coordinated with each other.
It shows that the four circuit breakers and its setting are not
overlapping in each other and properly coordinated.
19
7.4 CB1 Setting Values of MCC-1 Circuit Breaker Protection
Device
20
7.5 Overall Time Current Characteristics Curve of Overcurrent Protection Devices
125AT
160AF
Figure 8: Overall Time Current Characteristics Curve and Single Line Diag
21
8. ARC FLASH ANALYSIS
22