Bentley RM Bridge CAST Tool
Bentley RM Bridge CAST Tool
Bentley RM Bridge CAST Tool
1. Balance Cantilever
2. RM Bridge Solutions
3. CAST tool
Balance Cantilever
Segmental precast
6 | WWW.BENTLEY.COM
Balance Cantilever
China A.C.
7
Central span suspension
UK “demo”
8
Pre-Cast Balance Cantilever
Fort Lauderdale
9
Motivation
• Advantages of Pre-casting:
– Better quality due to production in controlled environment
– Less formwork needed
– Less invasive (disturbance of traffic, environmental, …)
– Accelerated construction time
10
Precast Segment
Pier table segment
11
Bentley Bridge RM – GP
12
Bentley Bridge RM
13
Bentley
TS&L
Bridge Seismic Analysis
RM Bridge
Problems we face and Solutions we provide
15 | WWW.BENTLEY.COM
Segmental BCB in Bentley RM
Bridge
16 | WWW.BENTLEY.COM
RM Bridge Cantilever TOOL
17
Cross Section Definition of Tendon
Points
T6...T3, T2, T1 T11, T12, T13...T16 T26...T23, T22, T21 T31, T32, T33...T36
BA10 BA20
18
RM Cantilever TOOL
19
Cycle of construction stage
Balanced Cantilever Method basic concepts
Traveller
Traveller
Wet Concrete
e1
e2 3
γ = 25 kN/m
Step 1
Step 2 Step 3
C&S
Prestressing
20
Tendon Geometry
21
Tendon Management in RM-Tool
101-110 111-125 126-135
PIER 1
dT TIME
Stage
1 7 7 110 111
7 14 109 112 Copy tendons and modify
2
3 7 21 108 113
4
7 28 107 114
5 7 35 106 115 Copy tendon group and
7 42 105 116
6
7 49 104 117
change element numbers
7
PIER 2
9 7 63 125 126
10 7 70 124 127
11 7 77 123 128
12 7 84 122 129
13 7 91 121 130
14 7 98 120 131
15 7 105 119 132
22
Creep and Shrinkage
• Creep: c = e *
– εc = plastic strain due to creep
– εe = elastic strain due to permanent load
– φ = creep factor
• Global parameters such as quality of concrete, , environment (humidity,
temperature,…)
• Section properties
• Age of concrete
e = e,i , c = e,i *
• Load application date when using CEB-FIP model
• Shrinkage:
– Total plastic strain consists of creep + shrinkage
= + s
• Global parameters and section properties, similar top Creep
c
• Age of concrete
23
Integral Equation
Averaging and
*
2 linearisation according
to “finite differences”
1 w1 w2 theory
* = 1 *w2 + 2 *w1
24
Creep & Shrinkage curve
ASSHTO 1996
25
Cantilever Camber and Position
Camber Line Summation Loadcase (SUMLC) · (-1)
LC 1
LC 2
LC 3
26
Cantilever with 5 steps
• Fabrication shape
• Camber
27
3-Span Bridge Camber Line
G2
G1
1 2 3
ADDCON: Optimization
29
Constraints
30
Optimization of the Cable Forces
31
AddCon Method
32
Choosing Constraints
33
After optimisation
34
RM Bridge Erection Control
• Expected position is not achieved during the
construction of bridge:
– Current position should be taken into account
35
Solution
• deformed structure is the start position:
– full account of location in space is taken into account
– implemented procedure is repeated interactively until
convergence criteria
36
Fabrication Shape
• Definition of the bridge segment stress free
geometry WITHOUT rigid body part
• There is only one fabrication shape per bridge
segment
37
Kink Correction
corr Node
Element
Iteration
38
RM CAST Tool
In Factory: control points
39
Short Line Match Casting
40
Short Line Match Casting
Casting sequence
41
Bentley Bridge RM - GP
Geometric
Preprocessor
42
Short Line
Match Casting
Casting sequence
43
Short Line Match Casting
44
Preparation in GP
Definitions for
Rivet positions
Segmentation
Casting sequence
46
Short Line Match Casting
47
Short Line Match Casting
Casting sequence
48
Short Line Match Casting
Casting sequence
49
Effects
50
Geometry coordinates
51
52
Preparation in GP
Definitions for
Rivet positions
Segmentation
Casting sequence
Casting direction
Segment type
Segment length
54
RM2006 - GP
55
56
Preparation in RM
Preparation following the principles of camber calculation
Final export to RMCast with module “DoCast”
57
High 5 - Dallas
58
RM Cast
59
RM Cast
60
RM Cast
61
RM Cast
Report generation
62
Prepare starting segment
63
Survey segment
64
Writing surveyed values
65
• RM-cast will then
correct the
coordinates of
next segments
depending on the
errors in
surveyed
segment.
66
Prepare match-cast segment
67
Survey segment
68
Writing surveyed values
69
• Repeat this procedure until you complete whole
casting set.
70
Bentley RM Bridge
CAST Tool
Conclusions
71 | WWW.BENTLEY.COM
RM 3D structural model
bridge over the Kanawha River
72
RM Bridge CAST tool
76
RM Bridge & BrIM Benefits
78
Bentley RM Bridge
Introducing CAST Tool
Questions
79 | WWW.BENTLEY.COM
Thank you for your attention!
marcos.beier@bentley.com