Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Bentley RM Bridge CAST Tool

Download as pdf or txt
Download as pdf or txt
You are on page 1of 77

Bentley RM Bridge

Introducing CAST Tool


Marcos Beier
Technical Support Analyst
2
Bentley RM Bridge CAST Tool

• Skill Level: Beginner


• Presenter: Marcos Beier, Bentley
– Balance Cantilever Concrete
– Segmental & Post Tensioned
– Integrated control of the match:
RM CAST
RM Bridge CAST tool

1. Balance Cantilever
2. RM Bridge Solutions
3. CAST tool
Balance Cantilever
Segmental precast

6 | WWW.BENTLEY.COM
Balance Cantilever
China A.C.

7
Central span suspension
UK “demo”

8
Pre-Cast Balance Cantilever
Fort Lauderdale

9
Motivation
• Advantages of Pre-casting:
– Better quality due to production in controlled environment
– Less formwork needed
– Less invasive (disturbance of traffic, environmental, …)
– Accelerated construction time

10
Precast Segment
Pier table segment

11
Bentley Bridge RM – GP

12
Bentley Bridge RM

13
Bentley
TS&L
Bridge Seismic Analysis
RM Bridge
Problems we face and Solutions we provide

15 | WWW.BENTLEY.COM
Segmental BCB in Bentley RM
Bridge

Problems we face Solutions we provide


• PT • Cantilever Tool
• C&S • Pre-camber
• Camber
• Optimal Solution? • ADDCON
• Onsite control • Cast TOOL
• Precast factory control • Erection Control

16 | WWW.BENTLEY.COM
RM Bridge Cantilever TOOL

17
Cross Section Definition of Tendon
Points

+10 +20 +30

TA0 TA10 TA20 TA30

T6...T3, T2, T1 T11, T12, T13...T16 T26...T23, T22, T21 T31, T32, T33...T36

BA10 BA20

B9...B3, B2, B1 B11, B12, B13...B19


+10

18
RM Cantilever TOOL

19
Cycle of construction stage
Balanced Cantilever Method basic concepts
Traveller
Traveller

Wet Concrete
e1
e2 3
γ = 25 kN/m
Step 1
Step 2 Step 3

e.g. 2 days instead of 7!!!


Traveller

C&S

Prestressing

Step 6 Step 5 Step 4

20
Tendon Geometry

21
Tendon Management in RM-Tool
101-110 111-125 126-135

PIER 1
dT TIME
Stage
1 7 7 110 111
7 14 109 112 Copy tendons and modify
2
3 7 21 108 113
4
7 28 107 114
5 7 35 106 115 Copy tendon group and
7 42 105 116
6
7 49 104 117
change element numbers
7
PIER 2

9 7 63 125 126
10 7 70 124 127
11 7 77 123 128
12 7 84 122 129
13 7 91 121 130
14 7 98 120 131
15 7 105 119 132

22
Creep and Shrinkage
• Creep: c = e * 
– εc = plastic strain due to creep
– εe = elastic strain due to permanent load
– φ = creep factor
• Global parameters such as quality of concrete, , environment (humidity,
temperature,…)
• Section properties
• Age of concrete
e = e,i , c = e,i * 
• Load application date when using CEB-FIP model

• Shrinkage:
– Total plastic strain consists of creep + shrinkage
 =  + s
• Global parameters and section properties, similar top Creep
c

• Age of concrete

23
Integral Equation


Averaging and
*
2 linearisation according
to “finite differences”
1 w1 w2 theory

Creep curve „a‟ for applied load (de-


 t2
t1 composed into increments)
a,t2
Creep curve „b‟ for stress increment
occurring during time interval (construction
b,t2
stage) under consideration

* = 1 *w2 + 2 *w1
24
Creep & Shrinkage curve

ASSHTO 1996

25
Cantilever Camber and Position
Camber Line Summation Loadcase (SUMLC) · (-1)

LC 1

LC 2

LC 3

26
Cantilever with 5 steps

• Fabrication shape
• Camber

27
3-Span Bridge Camber Line

G2
G1

1 2 3
ADDCON: Optimization

• Preparing a structural model


• Definition of
• - Loads
• - Construction schedule
• - Corresponding ADDCON constraints
• Design criteria can be checked
• Optimisation can be started

29
Constraints

• Deformation of any point on the structure


• One of the internal forces at any point on the
structure
• Stress at any cross-section at any point on the
structure

• Every constraint can be defined as a range of


values

30
Optimization of the Cable Forces

31
AddCon Method

• Provides a solution for finding the optimal


tensioning strategy for the construction of cable-
stayed bridges
• Include non-linear structural behaviour and time-
dependent effects
• Computes the correct tensioning forces for the
stay cables which lead exactly to a predetermined
moment distribution and also to the intended
geometry

32
Choosing Constraints

Defined boundary condition

33
After optimisation

Defined boundary condition

34
RM Bridge Erection Control
• Expected position is not achieved during the
construction of bridge:
– Current position should be taken into account

• Compensation is made with pre-camber and


fabrication shapes
optimization of internal forces under
permanent loads
X
choice of erections situations

35
Solution
• deformed structure is the start position:
– full account of location in space is taken into account
– implemented procedure is repeated interactively until
convergence criteria

• fabrication shape is applied as loading:


– control and optimization of forces and displacements

• kink correction for structural assembly:


– control or simulation of construction in face-to-face
connections

• kink correction for structural assembly:


– control or simulation of construction in face-to-face
connections

novel solution: based on displacement constraints

36
Fabrication Shape
• Definition of the bridge segment stress free
geometry WITHOUT rigid body part
• There is only one fabrication shape per bridge
segment

37
Kink Correction

• How does it work?

 corr   Node
 Element

Iteration

38
RM CAST Tool
In Factory: control points

39
Short Line Match Casting

Idea of Short Line Match Casting

• Perfect match at segment joints

40
Short Line Match Casting
Casting sequence

41
Bentley Bridge RM - GP
Geometric
Preprocessor

42
Short Line
Match Casting

Casting sequence

43
Short Line Match Casting

44
Preparation in GP
Definitions for
 Rivet positions
 Segmentation
 Casting sequence

 Four geometry points


• Name1(co) center, offset
• Name2(el), Name3(el) elevation,
lentgh
• Name4(b) bottom
45
Short Line Match Casting
Measuring the segments

 Aluminium bolts for elevation


and length
 Horizontal stirrups

 Distance from joint (a, c)


 Distance from centerline (W)

46
Short Line Match Casting

47
Short Line Match Casting

Casting sequence

48
Short Line Match Casting

Casting sequence

49
Effects

50
Geometry coordinates

51
52
Preparation in GP
Definitions for
 Rivet positions
 Segmentation
 Casting sequence

 Four geometry points


• Name1(co) center, offset
• Name2(el), Name3(el) elevation,
lentgh
• Name4(b) bottom
53
Preparation in GP
Definitions for
 Rivet positions
 Segmentation
 Casting sequence

 Casting direction
 Segment type
 Segment length

54
RM2006 - GP

55
56
Preparation in RM
 Preparation following the principles of camber calculation
 Final export to RMCast with module “DoCast”

Elements for casting are define in RM-Set:


 First element must be starter
 Side where next element joins
must be given

57
High 5 - Dallas

58
RM Cast

RM Cast is a tool to help casting segments in the casting yard.


Small inaccuracies which may occur during casting can be
corrected and the setup of other segments is changed.

59
RM Cast

Typical casting steps:


 Setup match cast segment
 Setup wet cast rivets/stirrups
 Pour segment
 Survey rivets/stirrups
 Correct casting curve

60
RM Cast

61
RM Cast

Report generation

62
Prepare starting segment

63
Survey segment

• Survey rivets after casting segment

64
Writing surveyed values

65
• RM-cast will then
correct the
coordinates of
next segments
depending on the
errors in
surveyed
segment.

66
Prepare match-cast segment

67
Survey segment

68
Writing surveyed values

69
• Repeat this procedure until you complete whole
casting set.

70
Bentley RM Bridge
CAST Tool
Conclusions

71 | WWW.BENTLEY.COM
RM 3D structural model
bridge over the Kanawha River

(Courtesy of Finley Engineering Group, Inc.)

72
RM Bridge CAST tool

• Balance Cantilever + ABC = Segmental


• Bentley RM Bridge solutions
– PT, C&S, camber, onsite and shape factory control
– Cantilever, Pre-camber, ADDCON and Erection Control

• RM Bridge CAST tool


– updating analysis
– connecting site modifications to design
Kanawha River
West Virginia

76
RM Bridge & BrIM Benefits

• Bentley BrIM vision


• Bentley portfolio
• Enhanced GUI
• Intuitive cast-by-cast calculation
• One tool for all
Big I - URS

78
Bentley RM Bridge
Introducing CAST Tool
Questions

79 | WWW.BENTLEY.COM
Thank you for your attention!
marcos.beier@bentley.com

You might also like