S Civ Ohl - 00
S Civ Ohl - 00
S Civ Ohl - 00
CIVIL WORKS
OVERHEAD LINES
This specification refers to design, manufacturing, inspection and construction for Overhead Line
foundations.
3 REFERENCE DOCUMENTS
The list of the reference documents is indicated in the following paragraphs.
In case of discrepancy between these Specifications and any of the applicable Codes and
Standards, the following order of precedence shall apply:
1) TAQA/ADDC/AADC specifications
2) applicable reference standards
3) other documents.
The Supplier shall note that compliance with the provision of these specifications does not relieve
him from his responsibility to supply proper design, material and construction, suited to meet the
operating guarantees at the specified service conditions.
3.1 TAQA/ADDC/AADC specifications
Table 1- List of TAQA/ADDC/AADC specifications
S-GEN-SER S-GEN-COR
S-CIV-SOIL S-CIV-GEN
S-CIV-CONCRETE S-CIV-WORK
S-CONMAN
5 TECHNICAL DESCRIPTION
5.4 Gantries
The gantry, when foreseen for the specific project, will be located at a distance of about 50 to 120
m from the terminal tower. As protection against entrance of unauthorized persons, a fence in
accordance with Specification S-CIV-FENCE shall be provided around the gantry. Unless a gantry
is located within a Sub or Power Station area, inclined holders with 4 strands of galvanized or
stainless-steel barbed wire shall additionally be installed at the top of the perimeter fence. Proper
earthing of the fence shall be provided if required.
Foundation design, grounding and painting of the gantry, and for the design of its foundation the
same stipulations are valid as for towers and foundations.
An earthing grid up to outside of the fence has to be provided conforming to the requirements of
EN 50522.
All areas of the gantry shall receive topping with gravel and shall be excavated to a depth of not
less than 150 mm referring to finished ground level. The bottom of the excavated area shall be
plain, topped and levelled with coarse gravel of 25-51 mm in size and of a thickness of not less
than 150 mm. Alternative solutions may be proposed by the Supplier for TAQA/ADDC/AADC’s
approval.
Fencing, earthing and gravelling of the gantry areas according to Gantry layout is deemed to be
included in the item’s “gantry” and “foundation for gantry” of the Price Tabulation Sheet.
5.6.1 General
Tower foundation installation shall include tower site preparation, excavation, any measures
required to ensure slope stability or free drainage dewatering, foundation placement
measurements, assembly and placement of the approved foundation, foundation protection, as
well as backfill and clean-up.
The Supplier shall employ templates for stub setting for each tower and gantries. In general, all
four stubs shall be set simultaneously using templates. However, in case of undulating terrain or
due any other specific problem, each stub may be set separately using templates.
The Supplier shall remove all vegetation and other debris from the tower site, which will interfere
with his operation. Vegetation and debris removed from the tower site shall be disposed off outside
the right of way as directed by TAQA/ADDC/AADC and/or in accordance with local regulations.
The ground levels existing before the installation of foundations have to be considered in
determining tower platform heights.
The Supplier shall dispose of material and regulate the movement of equipment so that grades
shall not be exposed and slopes necessary to develop required loading characteristics shall be
maintained, especially in side-hill locations.
The depth of pile foundations shall always be related to the lowest ground (not platform/fill
elevation in the area occupied by the foundation.
5.6.2.1 General
There will be no classification of excavated materials, and the term “Excavation” shall include all
materials to be excavated or to be removed within the Project, regardless of the type, character,
composition, or conditions of the material excavated and shall further include all debris, junk,
broken concrete, bricks, logs, stumps, roots, and all other material encountered within the
specified excavation limits.
The Supplier is responsible for all necessary safety measures. He is liable for any damage and
accidents occurring while earthwork is being carried out. Proper standing, including any necessary
re-arrangement protection of slopes or cribbing, preparation of design calculations, etc. shall be
deemed included in the prices.
In the event of soil slides occurring during earth and rock work, all damage will be to the Supplier
debit. This also implies that no payment will be made for the additional moving of soil resulting
from such damage.
5.6.2.2 Clearing and Grading
The sites of all tower base work shall be cleared and levelled so that on completion of the work
the finished reinstated ground level shall normally at least be the same as prior to commencement
of the work.
The ground immediately adjacent to the foundation shall be sloped away at a slope of not less than
one unit vertical in 20 units horizontal (5-percent slope) for a minimum distance of 10 feet (3048
mm) measured perpendicular to the face of the wall.
If physical obstructions or plot lines prohibit 10 feet (3048 mm) of horizontal distance, a 5-percent
slope shall be provided to an approved alternative method of diverting water away from the
foundation.
Swales used for this purpose shall be sloped a minimum of 2 percent where located within 10 feet
(3048 mm) of the foundation. Impervious surfaces within 10 feet (3048 mm) of the foundation
shall be sloped a minimum of 2 percent away from the structure.
5.6.2.3 Backfilling materials
Material to be used for backfilling shall be well graded granular material. It shall be not aggressive
according to ACI 318 table 19.3.1.1.1 and shall have a grading curve close to the numbers, shown
in clause 5.3.5.3 Material for Fill and Backfill
5.6.2.4 Backfilling of foundations
Refilling around the pile head pits shall be carried out only after all works within the excavations
have been inspected and approved by TAQA/ADDC/AADC.
Unless otherwise directed all filling shall be approved selected material (see chapter 4.7.2.3) and
shall be deposited and compacted using approved material in layers not exceeding 150 mm thick
for hand compaction and 250 mm for mechanical compaction, loose depth.
During the placing of backfill the hole shall be kept free from water. All temporary timbering and
all decomposable material shall be removed from the excavations prior to backfilling.
8 EXCEPTIONS
Possible exceptions to the present prescriptions, concerning the adoption of technical and/or
manufacturing aspects different from the ones prescribed in the present document, can be
evaluated by TAQA/ADDC/AADC.
In such a case, TAQA/ADDC/AADC will take into account the opportunity to require additional
tests with regard to the technical/manufacturing proposed solutions.
Such exceptions can be approved by TAQA/ADDC/AADC.