REFERENCE DOCUMENTS

PLANT TRUE
NORTH NORTH COMPANY DWG NO. CONTRACTOR DWG NO. DESCRIPTION

3.19°
3200
3500
==
FOUNDATION CONCRETE QUANTITY 2050-CVSTD-00101 4355-AA-DX-00000001 STANDARD DRAWING FOR CONCRETE STRUCTURES GENERAL NOTES
21I10-PR009I 21I10-PR009I ==
700 800 MATERIAL TOTAL QUANTITY [Cu. M] 2050-CVSTD-00103 4355-AA-DX-00000003 STANDARD DRAWING FOR ANCHOR BOLTS
1 2
== == FOUNDATION CONCRETE 111.95 EQUIPMENT LAYOUT PELLET HANDLING AND FINISHING AREA

PR IN
21-PIDAL-E1001 4355-XX-DE-21600001
PLAN FROM EL.100.000 TO EL.113.000

EV D D
W
7000

AI IR
21-CVCS-I1002 4355-AA-CS-21I10PR09001 CALCULATION REPORT FOR AREA PIPERACK 21I10-PR009I

LIN .
LEAN CONCRETE QUANTITY

E = 2672.800
PIPERACK 21I10-PR009I PLAN AT EL.100.300 (BOB), BASE PLATE DETAILS

OF FDN. & PED.


OF FDN. & PED.
21-STDTE-I1050 4355-AI-DU-21I10PR09001
& SECTIONS, PLAN AT EL.106.000 (TOS) & PLAN AT EL.108.000 (TOS)
MATERIAL TOTAL QUANTITY [Cu. M] CONCRETE DRAWING UNIT 21 PIPE RACK 21I10-PR009I
21-CVDFN-I1052 4355-AA-DC-21I10PR09002
LEAN CONCRETE 8.88 R/F DETAILS OF FOUNDATIONS & BBS

1 1 2 2

2500

2900
600

800
==

==

==

==
- - - - GROUTING QUANTITY - FOUNDATIONS

21I10-PR009I
N = 889.950
NOTES

A
MATERIAL TOTAL QUANTITY [Cu. M]
NON-SHRINK CEMENTITIOUS GROUT 0.24
1. ALL DIMENSIONS ARE IN MILLIMETERS (UNLESS INDICATED OTHERWISE).

FN-017A FN-018A 2. ALL ELEVATIONS AND COORDINATES ARE IN METERS (UNLESS INDICATED OTHERWISE).
FNJ003 FNJ003 OF FDN. & PED.
FOUNDATIONS F/W-R/F TYPES
3. PLANT DATUM ELEVATION : H.P.P EL.+100.000 = +3.0 QNHD.

6000
RFJ003 RFJ003 OF FDN. & PED.
ABJ003 ABJ003 F/W TYPE R/F TYPE QUANTITY
FNJ001 RFJ001 10 4. ALL CONCRETE BELOW GROUND AND ABOVE UPTO MIN. 150mm SHALL BE COATED WITH BITUMINOUS, AS PER
F/W DETAIL OF FNJ001 F/W DETAIL OF FNJ002 FNJ002 RFJ002 4
PROJECT SPECIFICATION .
(SCALE: 1 : 50) FNJ003 RFJ003 4
(SCALE: 1 : 50) 5. DISCREPANCY IN DRAWING OR DOCUMENT, IF ANY, SHALL BE BROUGHT TO THE NOTICE OF THE SITE ENGINEER
PRIOR TO CONSTRUCTION.
21I10-PR009I

6. ANY ELEMENTS IN THE ANY DRAWINGS SHOULD NOT BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
B

FOUNDATIONS TYPE SCHEDULE


7. SUB GRADE BELOW FOUNDATION SHALL BE TREATED AND COMPACTED AS INDICATED IN PAR.10.6.3 OF 2050-CVES-00012/
ITEM TAG F/W TYPE R/F TYPE 4355-AG-SG-00000002 - GENERAL SPECIFICATION FOR EARTH WORKS (95% OF THE MAXIMUM DRY DENSITY AS PER
21I10-PR009I-FN001A FNJ001 RFJ001 MODIFIED PROCTOR TEST - ASTM D1557).
FN-015A FN-016A ISOLATION JOINT (TYP.)
21I10-PR009I-FN002A FNJ001 RFJ001
FNJ003 FNJ003 8. DRAWING VALID FOR SUBCONTRACTOR DETAIL ENGINEERING, MATERIAL PURCHASE, REBAR FABRICATION / BENT.
21I10-PR009I-FN003A FNJ001 RFJ001
6000

RFJ003 RFJ003 100.275 TOC 100.275 TOC 21I10-PR009I-FN004A FNJ001 RFJ001


ABJ003 ABJ003
100.000 HPP 100.000 HPP 21I10-PR009I-FN005A FNJ001 RFJ001
21I10-PR009I-FN006A FNJ001 RFJ001
21I10-PR009I-FN007A FNJ001 RFJ001
21I10-PR009I-FN008A FNJ001 RFJ001
21I10-PR009I

99.000 PTS 99.000 PTS 21I10-PR009I-FN009A FNJ002 RFJ002

2825
21I10-PR009I-FN010A FNJ002 RFJ002
C

2975
21I10-PR009I-FN011A FNJ002 RFJ002
TECNIMONT ("CONTRACTOR") HEREBY TRANSFERS TITLE TO THIS DRAWING TO RAS LAFFAN PETROCHEMICALS ("COMPANY"), IN ACCORDANCE WITH THE POLYETHYLENE EPC CONTRACT BETWEEN CONTRACTOR AND COMPANY. COMPANY HAS THE FREE AND UNRESTRICTED RIGHT TO USE THIS DRAWING WITHOUT REGARD TO ANY PATENTS OR COPYRIGHTS OWNED OR CONTROLLED BY CONTRACTOR.

21I10-PR009I-FN012A FNJ002 RFJ002


21I10-PR009I-FN013A FNJ001 RFJ001
THIS DOCUMENT IS NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR ANY PURPOSE OTHER THAN AS SET FORTH IN THE POLYETHYLENE EPC CONTRACT. CONTRACTOR SHALL NOT DISCLOSE THIS DOCUMENT TO OTHERS NOR USE THIS DOCUMENT FOR ANY PURPOSE OTHER THAN AS PROVIDED IN THE POLYETHYLENE EPC CONTRACT WITHOUT COMPANY'S PRIOR WRITTEN PERMISSION.

CONSTRUCTION JOINT (TYP.) 21I10-PR009I-FN014A FNJ001 RFJ001


FN-013A FN-014A 21I10-PR009I-FN015A FNJ003 RFJ003
FNJ001 FNJ001
21I10-PR009I-FN016A FNJ003 RFJ003
6000

RFJ001 RFJ001
ABJ001 ABJ001 21I10-PR009I-FN017A FNJ003 RFJ003

650
500
21I10-PR009I-FN018A FNJ003 RFJ003
96.800 BOF 96.800 BOF
100
(TYP.)
50 THK. LEAN CONCRETE
ANCHOR BOLTS LAYOUT SCHEDULE - FOUNDATIONS
21I10-PR009I

ANCHOR BOLTS LAYOUT


QUANTITY NO. OF BOLTS BOLTS DIA. [mm]
TYPE
ABJ001 10 40 20
SECTION 1 SECTION 2 ABJ002 4 16 20
FN-011A
FNJ002
FN-012A
FNJ002
(SCALE: 1 : 50) - (SCALE: 1 : 50) - ABJ003 4 16 20
6000

RFJ002 RFJ002
ABJ002 ABJ002

ANCHOR BOLTS QUANTITY - FOUNDATIONS


DIA. OF ANCHOR BOLTS NO. OF ANCHOR BOLTS BOLT LENGTH [mm]
21I10-PR009I

M20 72 520
3500
E

==
700

21I10-PR009I
== PRICE CODE
FN-009A FN-010A 3 600 LIMITED SECTION EXCAVATION ABA02AC01/02/03
FNJ002 FNJ002 BACKFILLING OF LIMITED SECTION EXCATION ACA05AM01
6000

==

OF FDN. & PED.


RFJ002 RFJ002 AB-GR 36-1-M20-120-400
ABJ002 ABJ002 200 MICROSILICA ADDITIVE ADA08OA03

OF FDN. & PED.


==
LEAN CONCRETE ADA08AA01
550 BITUMINOUS PAINT ADA16AA01
3 3

2500

600
==

==
21I10-PR009I

- - FORMWORK FOR FOUNDATION ADA09AA01

600

280

200
==

==

==
4 4
F

FOUNDATION CONCRETE ADA08AB04


- -
SUPPLY AND INSTALLATION OF STEEL REBARS ADA10AA02
FN-007A FN-008A
FNJ001 FNJ001 NON-SHRINK CEMENTITOUS GROUT ADA12AB01
RFJ001 RFJ001 200
SUPPLY AND INSTALLATION OF ANCHOR BOLTS ADA11AA01/ADA11EA01
ABJ001 ABJ001 == POCKET FOR SHEAR KEY
5000

4000 (200x200x125 DEEP)


OF FDN. & PED.
OF FDN. & PED.
21I10-PR009I

F/W DETAIL OF FNJ003 F/W DETAIL OF ABJ001


(SCALE: 1 : 50) (SCALE: 1 : 25)

FN-004A FN-005A FN-006A


FNJ001 FNJ001 FNJ001
RFJ001 RFJ001 RFJ001
ABJ001 ABJ001 ABJ001

100.275 TOC
9250

ABJ004
100.000 HPP

CEMENTITIOUS GROUT
25 THK. NON SHRINK
99.000 PTS KEYPLAN

P= 120
2875

100.275 TOC TRUE


21I10-PR009I

PLANT

125
NORTH NORTH

3.19°
H

PR WIN
EV D D
A I IR
LI .
NG
600

96.800 BOF

CRA NE A CCE S S
FN-001A FN-002A FN-003A
FNJ001 FNJ001 FNJ001
RFJ001 RFJ001 RFJ001
ABJ001 ABJ001 ABJ001
21I10-PR009I 2 -1 G 8
- 9
6
0

ABJ004 0
2 56
N ZO
D C
A

FOUNDATION PLAN SECTION 3 SECTION 4


(SCALE: 1 : 100)
(SCALE: 1 : 50) - (SCALE: 1 : 25) -

600
== AB-GR 36-1-M20-120-400
UP

200 650
AB-GR 36-1-M20-120-400
==
OF FDN. & PED.

==
OF FDN. & PED.

200
==

6 6
550

280

200
==

==

==

550

280

200

5 5
==

==

==

- - - -
0 02.Aug.2023 IFC-Issued for Construction D.Patil P.Yedalawar/D.Masekar M.Lazzaro
Rev. Date Reason for Issue - Revision Description Prepared Checked Approved

200
200
POCKET FOR SHEAR KEY == POCKET FOR SHEAR KEY
== (200x200x125 DEEP) (200x200x125 DEEP)
OF FDN. & PED. OF FDN. & PED.

Tecnimont
F/W DETAIL OF ABJ002 F/W DETAIL OF ABJ003 CONTRACTOR JOB CODE
(SCALE: 1 : 25) (SCALE: 1 : 25)
4355
CEMENTITIOUS GROUT

Ras Laffan Petrochemicals


25 THK. NON-SHRINK

CEMENTITIOUS GROUT
25 THK. NON-SHRINK

Ras Laffan Industrial City, Qatar

MODEL NAME:4355-AA3D-21I10-PR009I
Polyethylene Plant
P= 120

P= 120

100.275 TOC
Unit 21
100.275 TOC
125

125

DOCUMENT TITLE

CONCRETE DRAWING
UNIT 21 PIPE RACK 21I10-PR009I
FOUNDATION PLAN & F/W DETAILS
CONTRACTOR DWG NO. SCALE

SECTION 5 SECTION 6 Isometric View


4355-AA-DC-21I10PR09001 1:100
MOD - CADA0 E rev.1

(SCALE: 1 : 25) - (SCALE: 1 : 25) -

A0 SHEET
DWG NO. Sht. No REV

21-CVDFN-I1051 - 0