4355 Aa DC 21i10pr09001 - 0
4355 Aa DC 21i10pr09001 - 0
4355 Aa DC 21i10pr09001 - 0
PLANT TRUE
NORTH NORTH COMPANY DWG NO. CONTRACTOR DWG NO. DESCRIPTION
3.19°
3200
3500
==
FOUNDATION CONCRETE QUANTITY 2050-CVSTD-00101 4355-AA-DX-00000001 STANDARD DRAWING FOR CONCRETE STRUCTURES GENERAL NOTES
21I10-PR009I 21I10-PR009I ==
700 800 MATERIAL TOTAL QUANTITY [Cu. M] 2050-CVSTD-00103 4355-AA-DX-00000003 STANDARD DRAWING FOR ANCHOR BOLTS
1 2
== == FOUNDATION CONCRETE 111.95 EQUIPMENT LAYOUT PELLET HANDLING AND FINISHING AREA
PR IN
21-PIDAL-E1001 4355-XX-DE-21600001
PLAN FROM EL.100.000 TO EL.113.000
EV D D
W
7000
AI IR
21-CVCS-I1002 4355-AA-CS-21I10PR09001 CALCULATION REPORT FOR AREA PIPERACK 21I10-PR009I
LIN .
LEAN CONCRETE QUANTITY
E = 2672.800
PIPERACK 21I10-PR009I PLAN AT EL.100.300 (BOB), BASE PLATE DETAILS
1 1 2 2
2500
2900
600
800
==
==
==
==
- - - - GROUTING QUANTITY - FOUNDATIONS
21I10-PR009I
N = 889.950
NOTES
A
MATERIAL TOTAL QUANTITY [Cu. M]
NON-SHRINK CEMENTITIOUS GROUT 0.24
1. ALL DIMENSIONS ARE IN MILLIMETERS (UNLESS INDICATED OTHERWISE).
FN-017A FN-018A 2. ALL ELEVATIONS AND COORDINATES ARE IN METERS (UNLESS INDICATED OTHERWISE).
FNJ003 FNJ003 OF FDN. & PED.
FOUNDATIONS F/W-R/F TYPES
3. PLANT DATUM ELEVATION : H.P.P EL.+100.000 = +3.0 QNHD.
6000
RFJ003 RFJ003 OF FDN. & PED.
ABJ003 ABJ003 F/W TYPE R/F TYPE QUANTITY
FNJ001 RFJ001 10 4. ALL CONCRETE BELOW GROUND AND ABOVE UPTO MIN. 150mm SHALL BE COATED WITH BITUMINOUS, AS PER
F/W DETAIL OF FNJ001 F/W DETAIL OF FNJ002 FNJ002 RFJ002 4
PROJECT SPECIFICATION .
(SCALE: 1 : 50) FNJ003 RFJ003 4
(SCALE: 1 : 50) 5. DISCREPANCY IN DRAWING OR DOCUMENT, IF ANY, SHALL BE BROUGHT TO THE NOTICE OF THE SITE ENGINEER
PRIOR TO CONSTRUCTION.
21I10-PR009I
6. ANY ELEMENTS IN THE ANY DRAWINGS SHOULD NOT BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
B
2825
21I10-PR009I-FN010A FNJ002 RFJ002
C
2975
21I10-PR009I-FN011A FNJ002 RFJ002
TECNIMONT ("CONTRACTOR") HEREBY TRANSFERS TITLE TO THIS DRAWING TO RAS LAFFAN PETROCHEMICALS ("COMPANY"), IN ACCORDANCE WITH THE POLYETHYLENE EPC CONTRACT BETWEEN CONTRACTOR AND COMPANY. COMPANY HAS THE FREE AND UNRESTRICTED RIGHT TO USE THIS DRAWING WITHOUT REGARD TO ANY PATENTS OR COPYRIGHTS OWNED OR CONTROLLED BY CONTRACTOR.
RFJ001 RFJ001
ABJ001 ABJ001 21I10-PR009I-FN017A FNJ003 RFJ003
650
500
21I10-PR009I-FN018A FNJ003 RFJ003
96.800 BOF 96.800 BOF
100
(TYP.)
50 THK. LEAN CONCRETE
ANCHOR BOLTS LAYOUT SCHEDULE - FOUNDATIONS
21I10-PR009I
RFJ002 RFJ002
ABJ002 ABJ002
M20 72 520
3500
E
==
700
21I10-PR009I
== PRICE CODE
FN-009A FN-010A 3 600 LIMITED SECTION EXCAVATION ABA02AC01/02/03
FNJ002 FNJ002 BACKFILLING OF LIMITED SECTION EXCATION ACA05AM01
6000
==
2500
600
==
==
21I10-PR009I
600
280
200
==
==
==
4 4
F
100.275 TOC
9250
ABJ004
100.000 HPP
CEMENTITIOUS GROUT
25 THK. NON SHRINK
99.000 PTS KEYPLAN
P= 120
2875
PLANT
125
NORTH NORTH
3.19°
H
PR WIN
EV D D
A I IR
LI .
NG
600
96.800 BOF
CRA NE A CCE S S
FN-001A FN-002A FN-003A
FNJ001 FNJ001 FNJ001
RFJ001 RFJ001 RFJ001
ABJ001 ABJ001 ABJ001
21I10-PR009I 2 -1 G 8
- 9
6
0
ABJ004 0
2 56
N ZO
D C
A
600
== AB-GR 36-1-M20-120-400
UP
200 650
AB-GR 36-1-M20-120-400
==
OF FDN. & PED.
==
OF FDN. & PED.
200
==
6 6
550
280
200
==
==
==
550
280
200
5 5
==
==
==
- - - -
0 02.Aug.2023 IFC-Issued for Construction D.Patil P.Yedalawar/D.Masekar M.Lazzaro
Rev. Date Reason for Issue - Revision Description Prepared Checked Approved
200
200
POCKET FOR SHEAR KEY == POCKET FOR SHEAR KEY
== (200x200x125 DEEP) (200x200x125 DEEP)
OF FDN. & PED. OF FDN. & PED.
Tecnimont
F/W DETAIL OF ABJ002 F/W DETAIL OF ABJ003 CONTRACTOR JOB CODE
(SCALE: 1 : 25) (SCALE: 1 : 25)
4355
CEMENTITIOUS GROUT
CEMENTITIOUS GROUT
25 THK. NON-SHRINK
MODEL NAME:4355-AA3D-21I10-PR009I
Polyethylene Plant
P= 120
P= 120
100.275 TOC
Unit 21
100.275 TOC
125
125
DOCUMENT TITLE
CONCRETE DRAWING
UNIT 21 PIPE RACK 21I10-PR009I
FOUNDATION PLAN & F/W DETAILS
CONTRACTOR DWG NO. SCALE
A0 SHEET
DWG NO. Sht. No REV
21-CVDFN-I1051 - 0