Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

23 of 23

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

DN25 FIRE WATERLINE

WATER MOTOR ALARM (WET PILOT) DN25 FIRE WATERLINE


DN25 FIRE WATERLINE (WET PILOT)
(WET PILOT)

DN25 PIPE

DN25 DRAIN
DN150/DN100 DELUGE VALVE
DN150/DN100 DELUGE VALVE

MANUAL CONTROL STATION MANUAL CONTROL STATION

DRIP FUNNEL DRIP FUNNEL

DN150/DN100 OS&Y
GATE VALVE

WYE STRAINER
DIAPHRAGM CHAMBER SUPPLY

FRONT VIEW SIDE VIEW

GROUND LEVEL GROUND LEVEL

APPROVED NOTED/INFO/REFERENCE

AWCI RETURNED W/O ACTION

RFC FOR CONSTRUCTION


CHECKED DATE REVIEWED DATE

RECOMMENDED: MELVILLE A. MUTUC


MECHANICAL DESIGN SUPERVISOR

RENE U. ALBAY
APPROVED:
ELECTRICAL DESIGN MANAGER

FOR APPROVAL
OWNER:
NATIONAL GRID CORPORATION
OF THE PHILIPPINES
NGCP Building, Power center complex
Quezon Avenue cor BIR Road, Diliman, Quezon City

CONTRACTOR:
NEW NORTHEAST ELECTRIC GROUP HIGH
VOLTAGE SWITCHGEAR CO., LTD.
MANUFACTURER:
NANJING EXCELLENT TECHNOLOGY
INTERNATION CORPORATION
PROJECT NAME: MINDANAO SUBSTATION REHABILITATION PROJECT,
STAGE 1 - SCHEDULE IV (AURORA AND ZAMBOANGA SUBSTATIONS)
& MINDANAO SUBSTATION UPGRADING PROJECT,
STAGE 1 - SCHEDULE IV (NAGA SUBSTATION)
CONTRACT NO: DRAWING /DOCUMENT DESCRIPTION:
Sp19.MSRP1.Mt-0408(IV) DETAIL OF DELUGE VALVE
APPROVED: DATE:
9/16/2021
-100MVA TRANSFORMER
CHECKED: DATE: Project Location/Name of Substation: SCALE:

DELUGE VALVE INSTALLATION DETAILS 9/16/2021 NAGAMIN SUBSTATION NTS


DRAWN: DATE: DRAWING NO: SHT. NO.: Rev. Ind.:
NOT TO SCALE 9/16/2021 0408 (IV) NAA 8125 Q 001 A 23 of 23 0
PREVIOUS DRAWING NO: 0408 (IV) NAA 8125 Q 001

You might also like