PARADIP REFINERY
STANDARD OPERATING PROCEDURES
AVU & SR-LPG TREATMENT UNIT Rev-06 Validity:31-Dec-2022
AVU. SOP/ SOP For: FAILURE OF ALL 3 RCO PUMP (010-P-007 A/B/C) Revision No : 06
Department: Equipment involved: Process Unit:
AVU
010-F-101,010-F-201,010-F-002
Production &
010-P-007 A/B/C, 010-C-001, 010-C-007
SR-LPG Treatment Unit
HAZARDS INVOLVED:
SL.
Hazards involved Precautions to be taken
No.
1 Low RCO flow in VDU Furnace Ensure firing is stopped to avoid coking in coil.
DETAILED STEPS:
Action taken by Signature
Sl. Potential
Job description Control Measure EA/ EA/
No. Hazard SIC Panel SIC Panel
JEA JEA
High COT Monitor COT and
Loss of flow from all 3 pump of RCO
1 Low Flow in reduce Firing as per √ √
pump (010-P-007 ABC) is observed. Furnace requirement.
Check XZVs in field
for physically verify √ √ √
valve closure.
Fully Close Vent
On flow reducing below trip value Gas XZV, FG and
2 ensure furnace F-002 is tripped on Coil Coke Up FO control valves. √
Low Low Pass Flow Interlock. Route Vent gas to
Atm.
Physically isolate all
FO, Vent Gas and √ √
FG burners.
Stop VR export and Start VDU
circulation from P-25 ABC to E- Ensure flow in all
3 Coil Coke Up √ √ √
127/227 A-E to F-002 to C-007 for passes.
furnace cooling.
Maximize velocity steam in Ensure flow in all
4 Coil Coke Up √ √ √
convection section of the furnace. passes.