Chapter 3 CNG Yaba 1.1 - 061340
Chapter 3 CNG Yaba 1.1 - 061340
Chapter 3 CNG Yaba 1.1 - 061340
The experimental setup for the conversion process of a PMS to CNG generator
consist of a single cylinder, four (4) stroke air cooled petrol generator of rated p
ower of 2.5KVA. The generator unit being under test has a capacity of 2.5Kw,
50Hz 240v. The setup consist of a generator; the converter (also called the vapo
er. The converter consists of a regulating hose, which connect to the CNG cylin
der with valve and regulator on its head. The CNG cylinder of 3kg was used. It
was designed to run the generator using CNG with its component modification
s known as the converter (hybrid carburetor) and gas regulator. The modificatio
n was done in way that the possibility of switching back its petrol fueling syste
- Generator set
- CNG cylinder
- Stop watch
Parameters Details
Speed 3600rpm
No. of stroke 4
No. of cylinder 1
Weight 40kg
Table 2.
The specification of the generator type used is based on the societal considerati
trol as its fuel, but modification is made for it to use CNG gas. For the aim of t
his project is to contribute valuable knowledge to the field by examining the
factor of 1(one) and a rated A.C Voltage of 110v, 120v, 220v, 230v, 240v, (3 ph
Following procedures were used to carry out the investigating on the efficiency.
- The CNG (CNG) kits, pressure regulator, hoses and other components were a
ssembled properly.
- The converter connected with the hose from CNG cylinder is coupled to the e
- Before the start of the engine, ensure any leakages in the setup
- The CNG gas supply to the engine is controlled by a regulator valve and a co
- The generator test is carried out at constant out at constant speed by running i
spirit).
- First, the generator is run with petrol while time collection is made at differen
t loading.
- The same generator is run with CNG with the hybrid converter attached. The
weight of CNG consumed is also collected using the time from PMS.
- The weight of CNG gas and PMS was determined at the end of each trial usin
Running the generator either on PMS (Premium Motor Spirit) or CNG follows
the same principle by calculating each consumption for both fuels at set standar
d of time.
The engine was first run on no load and at constant speed. This step is repeated
for several numbers of times as desired say three (3) times. Since constraints ar
weighed before, after each subsequent experiment, and at elapsed time duration
The time required for a specified mass of PMS to exhaust is used to determine t
3.4.1 Converter (hybrid type): It is the most important part of the modified ex
el. A vaporizer is a device that transforms liquid phase CNG to vapor phase
CNG. CNG Vaporizers are used for vaporizing liquid fuel gases (i.e., CNG, but
ane, natural gas) or even other gases for use in various heating or other process
es. In the first stage, CNG is first vaporized and successively reduced in pressu
re. The second stage chamber is very sensible to the vacuum pressure. The vac
uum pressure causes the flow of CNG to the engine to increase or decrease dep
second stage chamber and the membrane will allows for a greater flow of gas t
3.4.2 Regulator: A pressure regulator is a valve that controls the flow of a liqui
d gas at certain pressure. Gas pressure regulators were used to regulate gas flo
w and are not used for measuring flow rates. A pressure regulator’s primary fu
nction is to match the flow of gas through the regulator to the demand for gas
placed upon the system. If the load flow decreases, then the regulator flow mu
st decrease also. If the load flow increases, then the regulator flow must increa
se. The regulator used has the following technical specifications; input pressur
Note: this specification should not be exceeded for use on generator of 2.5KVA
e is used for calculating the consumption quantity of CNG, which have least co
3.4.4 CNG Cylinder: The two variant available are called; Cylindrical type an
d toroidal type. The tank also has different capacity variants. CNG cylinder of
3.4.5 Pipe: Pipe use to supply CNG, from CNG tank to vaporizer called CNG
or fuel pipe. It is larger in diameter than lubricant and vacuum pipe shown.
CNG pipe should have better quality because continuous supply of CNG can d
amage the pipe when it is use very long time. Pipe through which lubricant sup
plied to the engine called lubricant pipe, it connect lubricant bottle with mixer
through tee. It has transparent colour. Pipe, which is provided for air, is called
air or vacuum pipe, its one end is connected to the mixer and other is connecte
d to vaporizer.
This is the ratio of the mass (Kg) of fuel consumed or supplied to the time tak
en in hours.
Mathematically:
F.C = Kg of fuel (Kg/hr)
Hour
(UNESCO 2009)
This is the ratio of fuel consumption rate in Kg/hr to the power available in th
Power
(UNESCO 2009)
This is the ratio of the useful output to total input, which is expressed m
athematically.
η = Desired output
This is the ratio of energy equivalent of the Brake power (B.P) per second
Kg/hr × C.V
(UNESCO 2009)
REFERENCES
6(8), e04590.
2008-2009.