Description Two component zinc rich epoxy primer, hardened with polyamide. It presents high concentration in
metallic zinc dust which acts as a pigment that satisfies the high standards for the protection from
electrocathodic corrosion of iron and steel surfaces (cold galvanization). It contains at least 85% per
weight zinc in the dry film. It is recommended for every area where strong anticorrosive protection
is needed like chemical plants, energy production plants, shipyards and harbor equipment. It is
certified by a European Institute for its anticorrosive-protective properties according to the
standard EN ISO 12944.
The above pot lifetimes refer to material without addition of thinner. After adding thinner, a small
increase in the pot life is expected. The above times are indicative and depend on the thinning
percentage, substrate conditions, film thickness, weather conditions (relative humidity, wind,
sunshine).
Surface All applications on steel, including welding, cut with flame and smoothing, must be terminated
Preparation before the preparation of the surface. Cleaning of the surface from dust and other materials like oil,
grease etc using special detergent and fresh water under high pressure. The alkaline remnants of
the recent welding joints as well as the traces of soap, must be removed with fresh water and
rubbing. For better results, sandblast is recommended at least Sa 2 ½, ISO 8501-1.
Application A component, B component and the thinner are mixed together. It is important to stir both around
the walls and at the bottom of the mixing container, so the hardener is evenly distributed. Applied
10 minutes after mixing.
It is applied with:
AIRLESS after 5% thinning with thinner (nozzle 0,43-0,58mm (0,017-0,023in))
AIR PISTOL (diameter: 2,0-2,2 mm, pressure: 3-5 bar) after thinning 5% with thinner
Suggested film thickness 40-75 μm (film thickness bigger than 120 μm can cause cracking)
Application temperature 5-35ºC
Substrate temperature 5-35ºC
Due point The substrate temperature must be at least 3 ºC higher than the dew
point.
Relative humidity < 80%
Factory: 11ο Km Old National Road Thessaloniki-Kilkis, Thessaloniki, PC 57008, • Tel: 00302310782645 •Fax: 00302310780045
Date: 10/10/2019 Edition: 1.11.
ΕΠ718/01/08.02.2006
Suggested thinners 1131-1120
The choice of suitable thinner depends on the application method, the
temperature and the humidity conditions. For the suitable choice,
please contact with the technical department of our company.
The above conditions must be followed both during the application process and throughout the
drying.
It should not be applied when rain is expected (at least 24h). It is necessary to protect the primer
from the moisture (>80%) and the rain for about 24 hours after the application.
The surface where the product will be applied on must be clean and dry. All damaged surfaces due
to transportation or use must be repaired.
Final coating is done with any top coat system, one or two components.
Storage Up to 12 months in a dry and cool place. (5-35˚C) protected from direct solar radiation and adverse
weather conditions, stored in the original unopened containers.
Safety Please consult the Material Safety Data Sheet. Available upon request.
This Technical Data Sheet replaces and cancels every previously issued.
The information, instructions, recommendations and specifications mentioned in this data sheet, represent the results and experience obtained from
testing under controlled or specially adapted conditions.
The accuracy and relevance of these results to the actual conditions, in which you apply the product, must be determined and depend only on the
purchaser and/or applicator.
Factory: 11ο Km Old National Road Thessaloniki-Kilkis, Thessaloniki, PC 57008, • Tel: 00302310782645 •Fax: 00302310780045
Date: 10/10/2019 Edition: 1.11.
ΕΠ718/01/08.02.2006