20100069
20100069
20100069
Q(2)
Given
B u.s =19m
B d.s =17m
Q max =55 𝑚3/𝑠
Q min =40 𝑚3/𝑠
Z=2:1
FOR CANAL:
QC=55𝑚3/𝑠
AC=𝑏𝑦 + 𝑧𝑦2
AC=17*4+2*4*4=100𝑚2
VC=𝑄𝐶/𝐴𝐶=55/100 = 0.55 𝑚/𝑠
Vv = (2 → 3)Vc
Vv= (2*0.55= 1.1 → 3*0.55= 1.65 ) m/s1
Check of heading up
Design of gate:
Lg = S+0.3=3+.3=3.3 m
Hg= d of (u.s) +0.5
Hg =4.5+0.5=5 m
Ag=Lg * hg
Ag = 3.3*5=16.5 𝑚2
Ag > 16 𝑚2
Use double gates
Design of lifting device :
N=ℎ𝑔0.6=2.750.6= 4.5 ~5
W= 𝑃/𝑁∗𝐿𝑔=25.15∗3.3= 1.52𝑡/𝑚`
M=𝑊∗𝐿28= 1.52 ∗ 3.3 ∗ 3.38= 2.1 𝑡. 𝑚
Zx=2.1∗100/1.4= 147 𝑐𝑚3
from steel table
USE IPE (200)
N=ℎ𝑔/0.8=2.75/0.8= 3.4 ~4
W= 𝑃/𝑁∗𝐿𝑔=8.35/4∗3.3= 0.63𝑡/𝑚`
M=𝑊∗𝐿2/8= 0.63 ∗ 3.3 ∗ 3.3/8= 0.86 𝑡. 𝑚
Zx=3.411∗100/1.4= 61.26 𝑐𝑚3
USE IPE (140)
Location of M.G:
Design of pier
𝑡𝑝 =𝑠/3~4 =3/3= 1 𝑚
𝑏𝑏𝑟𝑖𝑑𝑔𝑒 = 12 𝑚
𝑏𝑟𝑜𝑎𝑑 = 12 + 2 ∗ 1.5 = 15 𝑚
ℎ𝑝 = 4.5 ∗ 0.5 = 5 𝑚
𝐿𝑒𝑓𝑓 = 𝑏𝑟𝑜𝑎𝑑 + 𝑎 + 𝑏 + 1 𝑚
𝐿𝑒𝑓𝑓 = 15 + 1 + 1 + 1 = 18 𝑚
𝐿𝑝𝑖𝑒𝑟 = 2 ∗ 15 = 30 𝑚 or 18+2*1+3.5 =23.5 m
𝑨𝒆𝒇𝒇 = 𝑳𝒆𝒇𝒇 ∗ 𝒕𝒑
𝑨𝒆𝒇𝒇 = 𝟏𝟖 ∗ 𝟏 = 𝟏𝟖 𝑚2
𝑒𝑥 =𝐿𝑒𝑓𝑓/2 −𝑏𝑟𝑜𝑎𝑑2 − 1𝑒𝑥 = 18/2 −15/2 − 1 = 0.5 𝑚
𝐼𝑥=𝐿𝑒𝑓𝑓∗𝑡𝑝3/12=18∗13/12= 1.5 𝑚3
𝐼𝑦=𝑡/𝑝∗𝐿𝑒𝑓𝑓312=1∗183/12= 486 𝑚3
𝑥 =𝐿𝑒𝑓𝑓/2 =18/2 = 9 𝑚
𝑦 =𝑡𝑝 /2=1 /2= 0.5 𝑚
Case (1): Max normal