‫المعهد التكنولوجي العالي بالعاشر من رمضان‬

‫قسم الهندسه المدنيه‬

‫تصميمات اعمال ري(‪)2‬‬


‫د‪ /‬سماح حسن‬
‫م‪/‬مي محمود‬

‫االسم‪ :‬ايمان جابر محمود‬


‫الرقم ‪20100069 :‬‬
‫مجموعه‪41 :‬‬
Q(1)b:

Q(2)
Given
B u.s =19m
B d.s =17m
Q max =55 𝑚3/𝑠
Q min =40 𝑚3/𝑠
Z=2:1
FOR CANAL:

QC=55𝑚3/𝑠
AC=𝑏𝑦 + 𝑧𝑦2
AC=17*4+2*4*4=100𝑚2
VC=𝑄𝐶/𝐴𝐶=55/100 = 0.55 𝑚/𝑠
Vv = (2 → 3)Vc
 Vv= (2*0.55= 1.1 → 3*0.55= 1.65 ) m/s1

USE Vv = 1.2 m/s

Av=𝑄𝑐/𝑉𝑣 = 55/1.2= 45.8𝑚2


Av=n*s*d = 45.8 =n*s*4
n 1 2 3 4 5
S 11.5 5.7 3.8 2.86 2.3
Assume n=3
S=4.00m
A act = n*s*d=4*3.00*4=48 𝑚2
V act = 𝑄/𝐴 𝑎𝑐𝑡=55/48 = 1.145 m/s (1~2) m/s ---- safe #

Check of heading up

H up = 𝑉𝑐2 /2𝑔𝑐2 ∗ (𝐴𝑉 𝐴𝐶2 2 − 1) ≤ 10 cm


2 < S < 4
 C =0.72
H up = 0.552/2∗9.8∗0.722 ∗ (100 482 2 − 1) = 9.9cm < 10 cm------ safe

Design of gate:

Lg = S+0.3=3+.3=3.3 m
Hg= d of (u.s) +0.5
Hg =4.5+0.5=5 m
Ag=Lg * hg
Ag = 3.3*5=16.5 𝑚2
Ag > 16 𝑚2
Use double gates
Design of lifting device :

Ft= o.w.t + Ffr


O.W.T =  * hg *Lg
O.W.T = 0.25*5* 3.3 =2.27 t/m`
Ffr =  * Pw
Pw=38∗ 𝛾 ∗ 𝑑2 ∗ 𝐿𝑔
Pw=38∗ 1 ∗ 4.52 ∗ 3.3
Pw= 25.1
Ffr=0.5*25.1=12.55 t/m`
Ft=4.17+12.55=17.72 t/m`

Design of down main girder :

N=ℎ𝑔0.6=2.750.6= 4.5 ~5
W= 𝑃/𝑁∗𝐿𝑔=25.15∗3.3= 1.52𝑡/𝑚`
M=𝑊∗𝐿28= 1.52 ∗ 3.3 ∗ 3.38= 2.1 𝑡. 𝑚
Zx=2.1∗100/1.4= 147 𝑐𝑚3
from steel table
USE IPE (200)

Design of up main girder:

N=ℎ𝑔/0.8=2.75/0.8= 3.4 ~4
W= 𝑃/𝑁∗𝐿𝑔=8.35/4∗3.3= 0.63𝑡/𝑚`
M=𝑊∗𝐿2/8= 0.63 ∗ 3.3 ∗ 3.3/8= 0.86 𝑡. 𝑚
Zx=3.411∗100/1.4= 61.26 𝑐𝑚3
USE IPE (140)
Location of M.G:

Design of pier

𝑡𝑝 =𝑠/3~4 =3/3= 1 𝑚
𝑏𝑏𝑟𝑖𝑑𝑔𝑒 = 12 𝑚
𝑏𝑟𝑜𝑎𝑑 = 12 + 2 ∗ 1.5 = 15 𝑚
ℎ𝑝 = 4.5 ∗ 0.5 = 5 𝑚
𝐿𝑒𝑓𝑓 = 𝑏𝑟𝑜𝑎𝑑 + 𝑎 + 𝑏 + 1 𝑚
𝐿𝑒𝑓𝑓 = 15 + 1 + 1 + 1 = 18 𝑚
𝐿𝑝𝑖𝑒𝑟 = 2 ∗ 15 = 30 𝑚 or 18+2*1+3.5 =23.5 m
𝑨𝒆𝒇𝒇 = 𝑳𝒆𝒇𝒇 ∗ 𝒕𝒑
𝑨𝒆𝒇𝒇 = 𝟏𝟖 ∗ 𝟏 = 𝟏𝟖 𝑚2
𝑒𝑥 =𝐿𝑒𝑓𝑓/2 −𝑏𝑟𝑜𝑎𝑑2 − 1𝑒𝑥 = 18/2 −15/2 − 1 = 0.5 𝑚
𝐼𝑥=𝐿𝑒𝑓𝑓∗𝑡𝑝3/12=18∗13/12= 1.5 𝑚3
𝐼𝑦=𝑡/𝑝∗𝐿𝑒𝑓𝑓312=1∗183/12= 486 𝑚3
𝑥 =𝐿𝑒𝑓𝑓/2 =18/2 = 9 𝑚
𝑦 =𝑡𝑝 /2=1 /2= 0.5 𝑚
Case (1): Max normal

𝑅𝐷.𝐿= 𝑔[𝑡𝑝 + 𝑠] ∗ 𝑏𝑟𝑜𝑎𝑑


𝑅𝐷.𝐿= 1[1 + 3] ∗ 15 = 60 𝑡𝑜𝑛
𝑅𝐿.𝐿= 𝑝[𝑡𝑝 + 𝑠] ∗ 𝑏𝑟𝑜𝑎𝑑
𝑅𝐿.𝐿= 2[1 + 3] ∗ 15 = 120 𝑡𝑜𝑛
𝑀𝑥= 𝑧𝑒𝑟𝑜
𝑀𝑦= (𝑅𝐷.𝐿 + 𝑅𝐿.𝐿) ∗ 𝑒𝑥
𝑀𝑦= (60 + 120) ∗ 0.5 = 90 𝑡𝑜𝑛
𝑜. 𝑤 =  * tp *Leff *ℎ𝑝
𝑜. 𝑤 = 2.5 *1*18 *5 = 225 𝑡𝑜𝑛6
𝑓 1,2 =−𝑁/𝑨𝒆𝒇𝒇±𝑀𝑥 𝐼𝑥/𝑌 ± 𝑀y𝐼𝑌/𝑋
𝑓 1,2 =−405/𝟏𝟖 ± 0 ±(90/486)*9
= −20.8 𝑇𝑂𝑁 & − 24.83 𝑇𝑂𝑁
Case (2): Max (𝑀𝑦)

𝑅𝐷.𝐿= 𝑔[𝑡𝑝 + 𝑠] ∗ 𝑏𝑟𝑜𝑎𝑑


𝑅𝐷.𝐿= 1[1 + 3] ∗ 15 = 60 𝑡𝑜𝑛
𝑅𝐿.𝐿= 𝑝[𝑡𝑝 + 𝑠] ∗ 𝑏𝑟𝑜𝑎𝑑/2𝑅
𝐿.𝐿= 2[1 + 3] ∗ 7.5 = 60 𝑡𝑜𝑛
𝑀𝑥= 𝑧𝑒𝑟𝑜
𝐹𝑢= 0.5𝛾𝑤𝑑𝑢.𝑠2[𝑡𝑝 + 𝑠]/7
𝑀𝑦= (𝑅𝐷.𝐿) ∗ 𝑒𝑥 + 𝑅𝐿.𝐿 (𝑒𝑥 + 𝑏𝑟𝑜𝑎𝑑 4 ) + 𝐹 𝑢*𝑑3 𝑢.𝑠
𝑀𝑦= (60) ∗ 0.5 + 60 ∗ (0.5 + 15 4 ) + 9 ∗ 43 .5 = 298.5 𝑡𝑜𝑛. 𝑚
𝑜. 𝑤 =  * tp *Leff *ℎ𝑝
𝑜. 𝑤 = 2.5 *1*18 *5 = 225 𝑡𝑜𝑛
𝑓 1,2 =−𝑁/𝑨𝒆𝒇𝒇±𝑀𝑥 𝐼𝑥/𝑌 ± 𝑀𝑌𝐼𝑌/𝑋
𝑓 1,2 =−345/𝟏𝟖 ± 0 ±(298.5/486) ∗ 9
= −13.64 𝑇𝑂𝑁 & − 24.7 𝑇𝑂𝑁

Case (3): Max (𝑀𝑥)

𝑅𝐷.𝐿= 𝑔[𝑡𝑝 + 𝑠] ∗ 𝑏𝑟𝑜𝑎𝑑


𝑅𝐷.𝐿= 1[1 + 3] ∗ 15 = 60 𝑡𝑜𝑛
𝑅𝐿.𝐿= 𝑝 [𝑡 2 𝑝 + 2 𝑠] ∗ 𝑏𝑟𝑜𝑎𝑑
𝑅𝐿.𝐿= 2[0.5 + 1.5] ∗ 15 = 22.5 𝑡𝑜𝑛
𝑁 = 𝑅𝐷.𝐿 + 𝑅𝐿.𝐿 + 𝑂. 𝑤
𝑁 = 60 + 22.5 + 225 = 307.5 𝑡𝑜𝑛
𝐹𝑈.𝑠 = 0.5𝛾𝑤𝑑𝑢.𝑠2[𝑡𝑝 + 2 𝑠]
𝐹𝑈.𝑠 = 0.5 ∗ 1 ∗ 4.52[1 + 3/2]=25.3 ton
𝐹𝑑.𝑠 = 0.5𝛾𝑤𝑑𝑑.𝑠2[𝑡𝑝 + 2 𝑠]
𝐹𝑑.𝑠 = 0.5 ∗ 1 ∗ 42[1 + 3/2]=20 ton
𝐹𝑠.𝐷 = 0.5𝛾𝑤𝑑𝑑.𝑠2[𝐿𝑒𝑓𝑓]
𝐹𝑆.𝐷 = 0.5 ∗ 1 ∗ 42[18]=144ton
𝑀𝑥= 𝐹𝑆.𝐷 ∗/𝑑𝑑.𝑠/3 + 𝑅𝐿.𝐿 ∗𝑡𝑝 /4
𝑀𝑥= 144 ∗4 /3+ 22.5 ∗1 4= 197.63 𝑡𝑜𝑛 . 𝑚
𝑀𝑦= (𝑅𝐷.𝐿 + 𝑅𝐿.𝐿) ∗ 𝑒𝑥+𝐹 𝑢.𝑠 ∗ 𝑑𝑢.𝑠/3+𝐹𝑑.𝑠 ∗𝑑𝑑.𝑠/3
𝑀𝑦= (60 + 120) ∗ 0.5 + 25.3 ∗ 4.5/3+20 ∗ 4/3= 52.53𝑡𝑜𝑛
𝑜. 𝑤 =  * tp *Leff *ℎ𝑝
𝑜. 𝑤 = 2.5 *1*18 *5 = 225 𝑡𝑜𝑛
𝑓 1,2 =−𝑁/𝑨𝒆𝒇𝒇±𝑀𝑥 𝐼𝑥/𝑌 ± 𝑀𝑌𝐼𝑌/𝑋
𝑓 1,2 =−405𝟏𝟖 ±197.631.5 ∗ 0.5 ±(52.53/486) ∗ 9
= 50.67 𝑇𝑂𝑁/𝑚2 & − 85.78 𝑇𝑂𝑁/𝑚2